COLORADO DEPARTMENT OF TRANSPORTATION 13:46 Monday, April 17, 2000 1 PROJECTS BID FROM 01/01/99 THROUGH 12/31/99 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ BIDS AWARDED BID INDEX LETTING PROJECT NUMBER LOCATION DIST TERRAIN ------------------------------------------------------------------------------------------------------------------------------------ 99010701 D.G. HUSKIN CONSTRUCTION CO. 5 $3,734,681.32 84.82 NH 0503-056 WEST OF PUEBLO 2 P 99010702 SEARL CONSTRUCTION, LLC 5 $449,345.14 144.94 STE C510-011 GEORGETOWN - SILVERPLUME 1 M 99010703 REYNOLDS WATSON COMPANY 6 $219,146.98 109.47 BRO C140-004 WILLIAMSBURG S/0 FLORENCE 2 R 99010705 TIERDAEL CONSTRUCTION CO. 3 $797,797.00 104.54 NH 0342-033 EAST OF GREELEY IRRIG 4 P 99011404 GRASSER CONSTRUCTION INC. 6 $3,212,700.50 96.44 STA 0711-013 N & S OF LIMON 1 P 99020401 LAFARGE dba WESTERN MOBILE NORTHERN 4 $2,852,678.62 85.46 STA 079A-009 N. OF BENNETT 1 P 99021804 SAN JUAN CONSTRUCTION INC. 5 $3,899,861.49 117.37 NHS 025-1(136) EL MORO REST AREA 2 R 99030401 SOUTHWEST CONTRACTING, INC. 2 $678,957.00 109.31 MC C320-001 US 160/UTE MTN REST AREA 5 R 99031106 HARRY'S HEAVY HAULERS, INC. 4 $581,148.97 68.86 C 5502-033 OURAY TO MONTROSE CNTY LN 5 R 99031802 JALISCO INTERNATIONAL, INC. 2 $249,183.00 105.70 CC 0703-253 I-70, DENVER WEST BRIDGE REPAI 6 U 99031804 KIEWIT WESTERN CO 2 $16,372,504.70 97.35 SP 0821-047 S.H. 82 SNOWMASS CREEK E/W 3 M 99040106 COLORADO BARRICADE CO., INC. 4 $599,888.80 108.52 IM 0703-252 I-70, US 6 & SH 119 1 L 99040802 MOLTZ CONSTRUCTORS, INC. dba AVERY CONST 7 $313,200.20 91.48 STE C540-007 FAIRPLAY- ALMA, BIKETRAIL 1 R 99040805 XKE CONTRACTORS INC 4 $328,827.75 95.06 STA 0852-081 LOUVIERS NORTH INTERSECTION 1 R 99042205 KOLBE STRIPING INC. 3 $752,217.95 73.37 C R400-081 R4 EPOXY STRIPING 4 R 99042206 NEW DESIGN CONSTRUCTION CO. 5 $1,535,742.40 110.16 IM R600-113 R6 GUARDRAIL IMPROVEMENTS 6 U COLORADO DEPARTMENT OF TRANSPORTATION 13:46 Monday, April 17, 2000 2 PROJECTS BID FROM 01/01/99 THROUGH 12/31/99 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ BIDS AWARDED BID INDEX LETTING PROJECT NUMBER LOCATION DIST TERRAIN ------------------------------------------------------------------------------------------------------------------------------------ 99042901 WOUDENBERG ENTERPRISES INC. 4 $890,526.00 95.12 SHE R300-054 REGIONWIDE STRIPING PROJECT 3 M 99052001 PCL CIVIL CONSTRUCTORS, INC. 10 $2,376,948.00 83.98 BR 0503-052 US 50 E OF SALIDA 5 M 99052003 TEZAK HEAVY EQUIPMENT CO., INC. 7 $299,258.00 109.27 MC 029A-001 AIRPORT RD/SPRING CREEK 2 U 99052004 W.L. CONTRACTORS, INC. 2 $118,361.25 97.18 C R600-116 EAST OF ARAPAHOE RD/HAVANA 6 U 99052701 CRH, plc dba UNITED COS OF MESA COUNTY 2 $309,318.00 80.89 CC 0701-147 LOMA POE 3 U 99060301 MARK RITE LINES OF MONTANA, INC. 5 $397,822.58 77.09 SHE R500-033 R5-EPOXY PAVEMENT MARKING 5 R 99061701 INTERSTATE HIGHWAY CONSTRUCTION 5 $10,530,327.69 69.75 NH 4701-95 C 470 MORRISON RD TO I 70 6 R 99061705 MSSW CONSTRUCTION, INC. 7 $149,868.00 81.45 SHE R300-055 VARIOUS IN/NEAR GRAND JCT 3 U 99070102 YENTER COMPANIES, INC. 4 $200,275.56 63.85 NH 5502-032 CRIBWALL SOUTH OF OURAY 5 M 99070103 ADARAND CONSTRUCTORS, INC. 3 $678,036.24 54.55 IM 0252-327 S. of Monument, Safety Impr. 2 R 99070806 C & K OF FOUNTAIN, INC. 1 $364,955.00 94.32 C R100-053 Region 1 Drainage & Str.s 1 P 99070807 KOLBE STRIPING INC. 4 $1,592,054.00 79.21 SHE R200-076 Region 2 Striping 2 U 99070808 CASTLE ROCK CONSTRUCTION 6 $7,702,095.06 90.72 NH 0342-034 Kersey East Widening 4 R 99070809 JALISCO INTERNATIONAL, INC. 6 $2,396,478.75 106.70 STA R400-047 E & W OF STERLING REST AREAS 4 R 99071501 C & K OF FOUNTAIN, INC. 7 $1,165,927.41 77.49 BR 0243-054 FALCON AREA BRIDGES 2 U 99072201 MYR GROUP, INC. dba Sturgeon Electric 2 CONTRACT REJ - NO REASON GIVEN STS R600-126 Region 6 Signal Imp.s 6 U 99072902 GRIMM CONSTRUCTION COMPANY, INC. 3 $893,195.00 117.47 C 0252-326 LARKSPUR REST AREA SOUTH 1 R COLORADO DEPARTMENT OF TRANSPORTATION 13:46 Monday, April 17, 2000 3 PROJECTS BID FROM 01/01/99 THROUGH 12/31/99 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ BIDS AWARDED BID INDEX LETTING PROJECT NUMBER LOCATION DIST TERRAIN ------------------------------------------------------------------------------------------------------------------------------------ 99080501 STRUCTURES, INC. 3 ALL BIDS REJECTED - CDOT OPTION STA 0061-065 KEYSTONE VILLAGE SKI AREA 1 M 99081202 BRADBURY & STAMM CONSTRUCTION CO., INC. 4 $478,988.25 93.29 IM 0703-263 HOGBACK PARK & RIDE 1 R 99081901 MYR GROUP, INC. dba Sturgeon Electric 3 $127,978.00 114.34 C C060-025 FORT COLLINS SH 14/I-25 4 P 99081902 ARROW ELECTRIC SERVICE, INC. 3 $338,137.07 77.03 C R200-078 LAMAR-PUEBLO-FLOR. SIGNALS 2 R 99081904 GRIMM CONSTRUCTION COMPANY, INC. 2 $329,347.00 78.24 C 0702-221 FRISCO ROUNDABOUT 1 M 99082603 DONE RIGHT STRIPING & BARRICADE, INC. 7 $248,011.27 58.64 C R400-085 R4, STENCIL MARKING 4 R 99090201 CRUZ CONSTRUCTION, INC. 2 < 3 BIDDERS & LOW BID > 10% OVER ENG EST IM 0761-177 I-76 GUARDRAIL IMPROVEMENTS 4 P 99091601 MYR GROUP, INC. dba Sturgeon Electric 2 < 3 BIDDERS & LOW BID > 10% OVER ENG EST STS R600-126 Region 6 Signal Imp.s 6 U 99091602 ADARAND CONSTRUCTORS, INC. 3 $212,516.20 76.72 C 0241-036 SH_24 GDRAIL,LAKE/EAGLE COUNTI 3 M 99091603 KOLBE STRIPING INC. 5 $58,160.70 82.29 STS 0504-036 R2 (SH50) SAFETY IMPROVEMENT 2 P 99100701 STRUCTURES, INC. 4 $419,801.49 101.75 STA 0061-065 KEYSTONE VILLAGE SKI AREA 1 M 99100702 K.E.C.I. COLORADO, INC. 1 $452,482.00 107.44 STE C010-043 E&W OF COLFAX SIGNALS 6 U 99101403 KAESS CONTRACTING, INC. 3 $184,183.00 100.23 STA 149A-017 DRAINAGE IN SOUTH FORK 5 M 99102103 SEMA CONSTRUCTION, INC. 13 $6,018,174.04 100.03 FC-NH(CX) 024-3(036) SH 24 & I-70, W OF LIMON 1 P 99102801 POWER ELECTRIC COMPANY 4 $100,851.46 51.80 AQC 0831-082 SH 83 COTTONWOOD-BAYOU GULCH 1 99102802 KIRKLAND CONSTRUCTION 5 $423,213.00 134.34 SHE 096A-031 SH 96, PUEBLO OVERLAY 2 U COLORADO DEPARTMENT OF TRANSPORTATION 13:46 Monday, April 17, 2000 4 PROJECTS BID FROM 01/01/99 THROUGH 12/31/99 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ BIDS AWARDED BID INDEX LETTING PROJECT NUMBER LOCATION DIST TERRAIN ------------------------------------------------------------------------------------------------------------------------------------ 99102803 KIEWIT WESTERN CO 5 $1,136,486.20 105.22 NH 2854-076 4 SITES, CONIFER TO FAIRPLAY 1 M 99102805 HAMON CONTRACTORS, INC. 8 $9,281,052.91 92.27 CC 2254-061 I-225 AT ALAMEDA 6 U 99102806 K.E.C.I. COLORADO, INC. 1 $55,934.00 94.15 R600-143 MEDIAN LEFT TURN LANE CLOSURE 6 U 99111801 D.G. HUSKIN CONSTRUCTION CO. 6 $1,211,802.60 84.21 NH 2854-080 US 285 FAIRPLAY N & S 1 R 99111802 LAFARGE dba WESTERN MOBILE NORTHERN 5 $1,372,125.05 95.16 IM 0705-072 I-70 W OF FLAGLER 1 P 99111803 DUCKELS CONSTRUCTION, INC. 1 $242,777.00 115.94 STA 2873-103 N/O VIRGINIA DALE AT DALE CR 4 R 99111804 ADARAND CONSTRUCTORS, INC. 1 $137,065.70 108.44 IM 0761-177 I-76 GUARDRAIL UPGRADE 4 P 99111805 MARK RITE LINES OF MONTANA, INC. 3 $1,398,504.38 99.96 NH R100-058 R-1, STRIPING 1 R 99111806 MYR GROUP, INC. dba Sturgeon Electric 4 $280,142.80 116.24 STM 392A-011 WINDSOR SIGNALS 4 P 99120201 XKE CONTRACTORS INC 5 $489,694.75 99.83 STA 086A-035 SH 86 IMPROVEMENTS 1 R 99120901 ASPHALT CONSTRUCTORS INC. 1 $620,477.50 177.28 M 05-001 ALAMOSA JOINT AND CRACK SEALAN 5 P 99120903 ELAM CONSTRUCTION, INC. 5 $3,086,983.50 83.10 STA 149A-016 POWDERHORN NORTH AND SOUTH 3 M 99120907 WALSENBURG SAND AND GRAVEL 6 $1,347,266.05 80.61 BRS-RS(CX)0012(27) E. OF STONEWALL 2 M 99120908 PARKING LOT STRIPING, INC. DBA MOUNTAIN 6 $156,156.71 68.22 C R100-062 VARIOUS HIGHWAYS IN REGION 1 1 R 99121601 ASPHALT PAVING CO. 4 $4,185,599.40 85.55 NH 0062-011 US 6, UNION TO WADSWORTH 6 U 99121602 EDWARD KRAEMER & SONS INC. 9 $1,015,324.88 98.55 BR 0403-034 N OF I-70, W OF GOLDEN 1 M 99121603 K.E.C.I. COLORADO, INC. 1 CONTRACT REJ - NO REASON GIVEN M 04-001 US 34 BRIDGE REHABILITAION 4 R COLORADO DEPARTMENT OF TRANSPORTATION 13:46 Monday, April 17, 2000 5 PROJECTS BID FROM 01/01/99 THROUGH 12/31/99 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ BIDS AWARDED BID INDEX LETTING PROJECT NUMBER LOCATION DIST TERRAIN ------------------------------------------------------------------------------------------------------------------------------------ 99121604 HALLMARK, INC. 2 CONTRACT REJ - NO REASON GIVEN M 06-001 SH 121, BROOMFIELD 6 U ======= ================ ====== TOTALS 271 $102,252,561.67 90.03 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 1 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 9.000 Lump Sum 478,312.07 53145.7856 202-00000 Removal of Structures and Obstructions 3.000 Lump Sum 45,000.00 15000.0000 202-00001 Removal of Structure 48.000 Each 118,014.76 2458.6408 202-00010 Removal of Tree 22.000 Each 9,825.04 446.5927 202-00015 Removal of Headwall 11.000 Each 1,986.00 180.5455 202-00020 Removal of Concrete Box Culvert 1.000 Each 13,000.00 13000.0000 202-00025 Removal of Ditch Lining 110.000 Lin Foot 880.00 8.0000 202-00026 Removal of Slope and Ditch Paving 640.000 Sq Yard 3,520.00 5.5000 202-00033 Removal of Pipe 34.000 Each 24,073.30 708.0382 202-00035 Removal of Pipe 1824.000 Lin Foot 30,584.88 16.7680 202-00037 Removal of End Section 10.000 Each 1,943.36 194.3360 202-00070 Removal of Barricade 5.000 Each 1,000.00 200.0000 202-00090 Removal of Delineator 1215.000 Each 6,923.92 5.6987 202-00190 Removal of Concrete Median Cover Material 334.000 Sq Yard 4,509.00 13.5000 202-00200 Removal of Sidewalk 983.000 Sq Yard 6,126.50 6.2325 202-00201 Removal of Curb 1786.000 Lin Foot 8,883.12 4.9738 202-00202 Removal of Gutter 140.000 Lin Foot 1,680.00 12.0000 202-00203 Removal of Curb and Gutter 14563.000 Lin Foot 53,775.90 3.6926 202-00204 Removal of Curb, Gutter and Sidewalk 2267.000 Lin Foot 31,738.00 14.0000 202-00210 Removal of Concrete Pavement 44559.000 Sq Yard 108,331.60 2.4312 202-00220 Removal of Asphalt Mat 263570.000 Sq Yard 603,452.88 2.2895 202-00240 Removal of Asphalt Mat (Planing) 349472.000 Sq Yard 386,636.90 1.1063 202-00246 Removal of Asphalt Mat (Planing) (Special) 7133.000 Sq Yard 27,969.60 3.9212 202-00250 Removal of Pavement Marking 189990.000 Sq Foot 195,388.65 1.0284 202-00400 Removal of Bridge 7.000 Each 110,783.76 15826.2514 202-00425 Removal of Bridge Railing 7681.300 Lin Foot 58,984.20 7.6789 202-00450 Removal of Portions of Present Structure (Class 1) 100.000 Sq Yard 9,000.00 90.0000 202-00454 Removal of Portions of Present Structure (Class 2A) 50.000 Sq Yard 10,000.00 200.0000 202-00456 Removal of Portions of Present Structure (Class 2B) 25.000 Sq Yard 6,250.00 250.0000 202-00462 Removal of Portions of Present Structure (Class 3A) 10.000 Sq Yard 6,000.00 600.0000 202-00495 Removal of Portions of Present Structure 4.000 Lump Sum 66,950.00 16737.5000 202-00500 Removal of Portions of Present Structure 8.000 Each 14,400.00 1800.0000 202-00700 Removal of Light Standard 2.000 Each 600.00 300.0000 202-00750 Removal of Luminaire 4.000 Each 180.00 45.0000 202-00805 Removal of Overhead Sign Structure 5.000 Each 15,222.00 3044.4000 202-00810 Removal of Ground Sign 704.000 Each 72,914.95 103.5724 202-00821 Removal of Sign Panel 102.000 Each 17,404.00 170.6275 202-00825 Removal of Flashing Beacon 2.000 Each 303.50 151.7500 202-00828 Removal of Traffic Signal Equipment 2.000 Lump Sum 8,410.00 4205.0000 202-00830 Removal of Traffic Signal Face 30.000 Each 900.00 30.0000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 2 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00840 Removal of Traffic Signal Pole 7.000 Each 2,435.00 347.8571 202-00848 Removal of Traffic Signal Controller and Cabinet 2.000 Each 560.00 280.0000 202-00860 Removal of Pedestrian Push Button 12.000 Each 144.00 12.0000 202-00870 Removal of Coordination Unit 2.000 Each 220.00 110.0000 202-00890 Removal of Span Wire Cable 585.000 Lin Foot 315.90 0.5400 202-01000 Removal of Fence 34513.000 Lin Foot 36,708.10 1.0636 202-01030 Removal of Road Closure Gate 2.000 Each 258.76 129.3800 202-01130 Removal of Guardrail Type 3 53759.500 Lin Foot 129,698.15 2.4126 202-01140 Removal of Guardrail Type 4 4710.000 Lin Foot 34,789.90 7.3864 202-01300 Removal of End Anchorage 166.000 Each 26,190.00 157.7711 202-01400 Removal of Cattle Guard 5.000 Each 18,341.50 3668.3000 202-04000 Plug Structure 15.000 Each 15,536.00 1035.7333 202-04001 Plug Culvert 6.000 Each 5,250.00 875.0000 202-04002 Clean Culvert 16.000 Each 16,720.00 1045.0000 202-04100 Abandon Well 1.000 Each 1,000.00 1000.0000 202-05100 Sandblasting Reinforcing Steel 24.000 Sq Yard 960.00 40.0000 202-05150 Sandblasting 50760.000 Sq Foot 31,981.00 0.6300 202-06000 Removal of Detour 1.000 Lump Sum 14,145.00 14145.0000 202-07000 Obliterate Old Road 3.000 Lump Sum 64,939.10 21646.3667 203-00000 Unclassified Excavation 30316.000 Cubic Yard 151,580.00 5.0000 203-00010 Unclassified Excavation (Complete In Place) 291213.000 Cubic Yard 1,837,426.39 6.3096 203-00040 Unclassified Excavation (Special) 8242.000 Cubic Yard 18,363.00 2.2280 203-00060 Embankment Material (Complete In Place) 945922.000 Cubic Yard 3,489,698.97 3.6892 203-00062 Embankment Material (Complete In Place) (Special) 61206.000 Cubic Yard 489,648.00 8.0000 203-00100 Muck Excavation 16150.000 Cubic Yard 69,270.50 4.2892 203-01100 Proof Rolling 25.000 Hour 2,750.00 110.0000 203-01140 Rolling 50.000 Hour 6,250.00 125.0000 203-01500 Blading 1500.000 Hour 134,176.48 89.4510 203-01510 Backhoe 40.000 Hour 6,100.00 152.5000 203-01515 Backhoe (Landscaping) 150.000 Hour 20,250.00 135.0000 203-01550 Dozing 150.000 Hour 17,700.00 118.0000 203-01555 Dozing (Landscaping) 202.000 Hour 25,268.48 125.0915 203-01582 Truck (Dump) 200.000 Hour 25,000.00 125.0000 203-01590 Front End Loader (Rubber Tired) 290.000 Hour 35,944.00 123.9448 203-01594 Combination Loader 160.000 Hour 11,811.90 73.8244 203-01597 Potholing 505.000 Hour 94,593.00 187.3129 203-02000 Drilling and Blasting 65.000 Lin Foot 1,365.00 21.0000 206-00000 Structure Excavation 30652.000 Cubic Yard 189,262.13 6.1745 206-00050 Structure Backfill (Special) 18623.000 Cubic Yard 297,968.00 16.0000 206-00065 Structure Backfill (Flow-Fill) 3265.000 Cubic Yard 254,287.68 77.8829 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 3 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 206-00100 Structure Backfill (Class 1) 17029.000 Cubic Yard 390,735.62 22.9453 206-00200 Structure Backfill (Class 2) 6177.000 Cubic Yard 46,954.04 7.6014 206-00315 Structure Backfill (Mechanically Stabilized Earth Wall 1068.000 Cubic Yard 106,800.00 100.0000 206-00360 Mechanical Reinforcement of Soil 4782.000 Cubic Yard 71,730.00 15.0000 206-00510 Filter Material (Class A) 84.600 Cubic Yard 3,123.35 36.9190 206-00520 Filter Material (Class B) 86.000 Cubic Yard 6,668.00 77.5349 206-01000 Bed Course Material 565.000 Cubic Yard 23,159.35 40.9900 206-01010 Bed Course Material 63.000 Ton 1,638.00 26.0000 206-01750 Shoring 1.000 Lump Sum 25,000.00 25000.0000 207-00205 Topsoil 80049.000 Cubic Yard 577,411.95 7.2132 207-00210 Stockpile Topsoil 6812.000 Cubic Yard 27,606.00 4.0526 207-00305 Wetland Topsoil 251.000 Cubic Yard 1,255.00 5.0000 207-00310 Stockpile Wetland Topsoil 251.000 Cubic Yard 627.50 2.5000 207-00405 Topsoil (Special) 9250.000 Cubic Yard 185,000.00 20.0000 208-00001 Silt Dike 1072.000 Lin Foot 19,296.00 18.0000 208-00005 Erosion Log 705.000 Lin Foot 6,142.50 8.7128 208-00010 Erosion Bales 521.000 Each 8,101.84 15.5506 208-00011 Erosion Bales (Weed Free) 1557.000 Each 25,379.30 16.3001 208-00020 Silt Fence 24627.000 Lin Foot 121,728.65 4.9429 208-00050 Storm Drain Inlet Protection 7.000 Each 3,594.46 513.4943 208-00070 Stabilized Construction Entrance 9.000 Each 10,501.25 1166.8056 208-00100 Sediment Removal and Disposal 7.000 Lump Sum 27,462.08 3923.1543 208-00200 Erosion Control Supervisor 9.000 Lump Sum 76,915.94 8546.2156 208-00300 Temporary Berms 15000.000 Lin Foot 22,500.00 1.5000 209-00100 Water (Landscaping) 5.000 M Gallon 2,250.00 450.0000 209-00600 Dust Palliative (Magnesium Chloride) 72450.000 Gallon 41,250.00 0.5694 210-00001 Reset Structure 2.000 Each 2,000.00 1000.0000 210-00010 Reset Mailbox Structure 12.000 Each 1,784.30 148.6917 210-00011 Reset Mailbox Structure (Type 1) 8.000 Each 1,815.00 226.8750 210-00012 Reset Mailbox Structure (Type 2) 4.000 Each 1,200.00 300.0000 210-00013 Reset Mailbox Structure (Type 3) 1.000 Each 500.00 500.0000 210-00014 Reset Mailbox Structure (Type 4) 1.000 Each 350.00 350.0000 210-00015 Reset End Section 1.000 Each 800.00 800.0000 210-00050 Reset Fire Hydrant 1.000 Each 2,200.00 2200.0000 210-00090 Reset Delineator 5.000 Each 104.00 20.8000 210-00425 Reset Bridge Railing 128.000 Lin Foot 5,760.00 45.0000 210-00500 Rebuild Portions of Present Structure 5.000 Each 13,250.00 2650.0000 210-00750 Reset Light Standard 6.000 Each 8,850.00 1475.0000 210-00810 Reset Ground Sign 57.000 Each 9,250.70 162.2930 210-00815 Reset Sign Panel 46.000 Each 3,894.50 84.6630 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 4 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00825 Reset Flashing Beacon 1.000 Each 600.00 600.0000 210-00831 Reset Traffic Signal Head 4.000 Each 2,760.00 690.0000 210-00845 Reset Traffic Signal Controller 3.000 Each 1,061.00 353.6667 210-00848 Reset Traffic Signal Controller and Cabinet 1.000 Each 5,500.00 5500.0000 210-00867 Reset Fire Preemption Unit 3.000 Each 1,395.00 465.0000 210-00870 Reset Coordination Unit 2.000 Each 760.00 380.0000 210-01000 Reset Fence 2410.000 Lin Foot 14,627.52 6.0695 210-01011 Reset Gate 2.000 Each 520.00 260.0000 210-01050 Reset Chain Link Fence 668.000 Lin Foot 9,180.00 13.7425 210-01130 Reset Guardrail Type 3 1137.500 Lin Foot 10,228.13 8.9918 210-01140 Reset Guardrail Type 4 390.000 Lin Foot 1,170.00 3.0000 210-01200 Reset End Anchorage 3.000 Each 1,874.49 624.8300 210-02024 Relay Pipe (24 Inch) 94.000 Lin Foot 4,787.42 50.9300 210-02900 Relay Riprap 10.000 Cubic Yard 330.00 33.0000 210-04000 Adjust Structure 29.000 Each 43,500.00 1500.0000 210-04010 Adjust Manhole 3.000 Each 6,000.00 2000.0000 210-04015 Modify Manhole 1.000 Each 606.00 606.0000 210-04020 Modify Inlet 15.000 Each 18,204.00 1213.6000 210-04025 Modify Structure 1.000 Each 5,575.00 5575.0000 210-04050 Adjust Valve Box 1.000 Each 500.00 500.0000 211-01016 Rock Bolt (2 Inch) 100.000 Lin Foot 1,500.00 15.0000 212-00005 Seeding (Native) 860.000 Pound 18,060.00 21.0000 212-00006 Seeding (Native) 234.070 Acre 128,270.61 548.0011 212-00007 Seeding (Native) (Hydraulic) 0.600 Acre 600.00 1000.0000 212-00011 Seeding (Lawn) 5.260 Acre 7,545.00 1434.4106 212-00025 Seeding (Shrubs) 7.000 Pound 805.00 115.0000 212-00028 Seeding (Wetlands) 0.500 Acre 683.10 1366.2000 212-00047 Soil Preparation (Special) 31.210 Acre 87,035.61 2788.7091 212-00050 Sod 54579.000 Sq Foot 45,606.36 0.8356 213-00001 Mulching 46.600 Ton 11,795.00 253.1116 213-00002 Mulching (Weed Free Hay) 103.200 Acre 42,475.86 411.5878 213-00003 Mulching (Weed Free) 165.030 Acre 67,574.74 409.4694 213-00005 Mulching (Decorative) 2033.000 Cubic Foot 11,946.04 5.8761 213-00006 Mulching (Weed Free) 33.000 Ton 13,200.00 400.0000 213-00008 Mulching (Wood Chip) 12283.000 Cubic Foot 26,190.58 2.1323 213-00011 Mulching (Hydraulic) 0.400 Acre 880.00 2200.0000 213-00061 Mulch Tackifier 53906.000 Pound 115,145.10 2.1360 213-00300 Concrete Landscape Border 532.000 Lin Foot 4,952.92 9.3100 213-00500 Tree Grate 5.000 Each 8,857.04 1771.4080 213-00700 Landscape Boulder 285.000 Each 20,563.00 72.1509 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 5 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 213-00705 Landscape Boulder (Special) 6.000 Each 1,543.50 257.2500 214-00000 Landscape Maintenance 1.000 Lump Sum 25,000.00 25000.0000 214-00155 Plant (Ball and Burlap) 115.000 Each 34,500.00 300.0000 214-00215 Deciduous Tree (1.5 Inch Caliper) 24.000 Each 6,950.00 289.5833 214-00220 Deciduous Tree (2 Inch Caliper) 8.000 Each 3,360.00 420.0000 214-00225 Deciduous Tree (2.5 Inch Caliper) 102.000 Each 37,740.00 370.0000 214-00230 Deciduous Tree (3 Inch Caliper) 14.000 Each 9,800.00 700.0000 214-00240 Deciduous Tree (4 Inch Caliper) 42.000 Each 30,473.10 725.5500 214-00280 Deciduous Tree (8 Foot) 8.000 Each 3,309.60 413.7000 214-00310 Deciduous Shrub (1 Gallon Container) 1322.000 Each 22,474.00 17.0000 214-00350 Deciduous Shrub (5 Gallon Container) 4936.000 Each 172,679.00 34.9836 214-00504 Evergreen Tree (4 Foot) (Ball and Burlap) 194.000 Each 52,539.00 270.8196 214-00506 Evergreen Tree (6 Foot) (Ball and Burlap) 38.000 Each 8,698.20 228.9000 214-00508 Evergreen Tree (8 Foot) (Ball and Burlap) 63.000 Each 17,530.80 278.2667 214-00610 Evergreen Shrub (1 Gallon Container) 116.000 Each 2,436.00 21.0000 214-00650 Evergreen Shrub (5 Gallon Container) 89.000 Each 3,582.00 40.2472 214-00710 Broadleaf Evergreen Shrub (1 Gallon Container) 66.000 Each 1,386.00 21.0000 214-00810 Ground Cover Vines (1 Gallon Container) 38.000 Each 532.00 14.0000 214-00850 Ground Cover Vines (5 Gallon Container) 67.000 Each 2,814.00 42.0000 214-00905 Perennials (2.25 Inch Pot) 100.000 Each 875.00 8.7500 214-00910 Perennials (1 Gallon Container) 1464.000 Each 17,325.40 11.8343 214-01010 Brush Layer Cutting 170.000 Each 2,000.00 11.7647 214-01015 Willow Cuttings 1700.000 Each 3,570.00 2.1000 216-00015 Soil Retention Blanket (Excelsior) 210.000 Sq Yard 462.00 2.2000 216-00030 Soil Retention Blanket (Special) 20405.000 Sq Yard 40,550.85 1.9873 216-00039 Soil Retention Blanket (Straw) 2450.000 Sq Yard 6,517.00 2.6600 216-00041 Soil Retention Blanket (Straw/Coconut) 6500.000 Sq Yard 14,950.00 2.3000 216-00070 Geocell Cellular Confinement System 543.000 Sq Yard 10,588.50 19.5000 217-00010 Pre-Emergent Herbicide 720.000 Sq Yard 720.00 1.0000 217-00020 Herbicide Treatment 80.000 Hour 8,400.00 105.0000 250-00010 Environmental Health and Safety Management 3.000 Lump Sum 10,800.00 3600.0000 250-00050 Monitoring Technician 74.000 Hour 4,001.20 54.0703 250-00100 Environmental Health and Safety 1.000 Lump Sum 3,437.24 3437.2400 250-00110 Health and Safety Officer 132.000 Hour 10,715.00 81.1742 250-00120 Material Sampling and Delivery 20.000 Each 1,727.30 86.3650 250-00210 Solid Waste Disposal 54.000 Cubic Yard 4,986.50 92.3426 250-00220 Hazardous Waste Disposal 7.000 Cubic Yard 4,523.80 646.2571 304-06000 Aggregate Base Course (Class 6) 100530.000 Ton 1,195,707.00 11.8940 304-06007 Aggregate Base Course (Class 6) 2102.000 Cubic Yard 46,477.16 22.1109 304-06009 Aggregate Base Course (Class 6) (Special) 3790.000 Ton 64,998.50 17.1500 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 6 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 304-07000 Aggregate Base Course (Class 7) 9792.000 Ton 107,712.00 11.0000 304-09000 Aggregate Base Course (Special) 7178.000 Cubic Yard 145,134.75 20.2194 304-09014 Aggregate Base Course (Special) 1074.000 Ton 21,480.00 20.0000 306-01000 Reconditioning 5211.000 Sq Yard 12,028.70 2.3083 307-00208 Processing Lime Treated Subgrade (8 Inch) 64992.000 Sq Yard 168,979.20 2.6000 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 11758.000 Ton 870,547.75 74.0388 403-03020 Hot Bituminous Pavement (Grading C) (Asphalt) 210.000 Ton 15,823.50 75.3500 403-09500 Furnish Hot Bituminous Pavement 6770.000 Ton 237,491.60 35.0800 403-31400 Hot Bituminous Pavement (Grading SX) (68) 72495.000 Ton 1,348,407.00 18.6000 403-31451 Hot Bituminous Pavement (Grading SX)(Asphalt)(68)(PG 5 1233.000 Ton 67,815.00 55.0000 403-31452 Hot Bituminous Pavement (Grading SX)(Asphalt)(68)(PG 5 25315.000 Ton 891,741.60 35.2258 403-31453 Hot Bituminous Pavement (Grading SX)(Asphalt) (68)(PG 5141.000 Ton 257,050.00 50.0000 403-32254 Hot Bituminous Pavement (Grading SG) (Asphalt) (76) (P 50430.000 Ton 1,563,330.00 31.0000 403-32324 Hot Bituminous Pavement (Grading S)(Asphalt) (76)(AC-2 56108.000 Ton 2,229,602.42 39.7377 403-32353 Hot Bituminous Pavement (Grading S)(Asphalt) (76)(PG 5 34588.000 Ton 1,231,405.75 35.6021 403-32354 Hot Bituminous Pavement (Grading S)(Asphalt) (76)(PG 6 13713.000 Ton 611,284.14 44.5770 403-33352 Hot Bituminous Pavement (Grading S)(Asphalt) (86)(PG 5 134.000 Ton 9,380.00 70.0000 403-33353 Hot Bituminous Pavement (Grading S)(Asphalt) (86)(PG 5 11024.000 Ton 500,753.00 45.4239 403-33354 Hot Bituminous Pavement (Grading S)(Asphalt) (86)(PG 6 78672.000 Ton 2,058,531.00 26.1660 403-33400 Hot Bituminous Pavement (Grading SX) (86) 30688.000 Ton 1,442,336.00 47.0000 403-33452 Hot Bituminous Pavement (Grading SX)(Asphalt) (86)(PG 3756.000 Ton 184,044.00 49.0000 403-33652 Hot Bituminous Pavement (Grading S-Fines)(Asphalt) (86 778.000 Ton 40,456.00 52.0000 403-34342 Hot Bituminous Pavement (Grading S)(Asphalt) (96)(PG 6 11259.000 Ton 591,097.50 52.5000 403-34344 Hot Bituminous Pavement (Grading S)(Asphalt) (96)(PG 7 2815.000 Ton 153,699.00 54.6000 403-34353 Hot Bituminous Pavement (Grading S)(Asphalt) (96)(PG 5 390.000 Ton 23,751.00 60.9000 403-34354 Hot Bituminous Pavement (Grading S)(Asphalt) (96)(PG 6 29976.000 Ton 1,221,988.50 40.7656 403-35324 Hot Bituminous Pavement (Grading S)(Asphalt) (109)(AC- 676.000 Ton 31,298.80 46.3000 403-35345 Hot Bituminous Pavement (Grading S)(Asphalt) (109)(PG 44184.000 Ton 1,536,296.20 34.7704 403-35353 Hot Bituminous Pavement (Grading S)(Asphalt) (109)(PG 2535.000 Ton 91,640.25 36.1500 403-35354 Hot Bituminous Pavement (Grading S)(Asphalt) (109)(PG 19497.000 Ton 590,759.10 30.3000 403-35445 Hot Bituminous Pavement (Grading SX)(Asphalt) (109) 2173.000 Ton 91,266.00 42.0000 403-91401 Hot Bituminous Pavement (Grading SX) (68)(Special) 3663.000 Ton 163,785.42 44.7135 405-00100 Heating and Remixing Treatment 270787.000 Sq Yard 690,506.85 2.5500 406-09500 Cold Bituminous Pavement (Recycle) 216746.000 Sq Yard 260,095.20 1.2000 408-01000 Hot Poured Joint and Crack Sealant 2.000 Ton 7,000.00 3500.0000 409-02015 Cover Coat Material (Type II) 3370.000 Sq Yard 5,392.00 1.6000 409-02025 Cover Coat Material (Type II) (Lightweight) 456585.000 Sq Yard 233,680.20 0.5118 411-01204 Asphalt Cement (AC-20) (Rubberized) 3614.000 Ton 896,077.60 247.9462 411-03341 Asphalt Cement Performance Grade (PG 58-40) 155.000 Ton 44,950.00 290.0000 411-03352 Asphalt Cement Performance Grade (PG 58-28) 3016.000 Ton 457,042.00 151.5391 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 7 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 411-10251 Emulsified Asphalt (CSS-1) 706.000 Gallon 2,118.00 3.0000 411-10253 Emulsified Asphalt (CSS-1H) 8509.700 Gallon 9,076.19 1.0666 411-10255 Emulsified Asphalt (Slow-Setting) 169550.000 Gallon 218,072.70 1.2862 411-10375 Emulsified Asphalt (HFRS-2P) (High Float) (Polymerized 165719.000 Gallon 147,773.07 0.8917 411-21020 Liquid Asphaltic Material (MC-70) 32427.000 Gallon 27,342.00 0.8432 411-90010 Asphalt Rejuvenating Agent 54172.000 Gallon 81,258.00 1.5000 411-90040 Recycling Agent 131664.000 Gallon 157,996.80 1.2000 412-00400 Concrete Pavement (4 Inch) 297.000 Sq Yard 9,816.40 33.0519 412-00600 Concrete Pavement (6 Inch) 548.000 Sq Yard 25,311.00 46.1880 412-00800 Concrete Pavement (8 Inch) 13117.000 Sq Yard 472,212.00 36.0000 412-00805 Concrete Pavement (8 Inch) (Fast Track) 581.000 Sq Yard 29,050.00 50.0000 412-00900 Concrete Pavement (9 Inch) 44205.000 Sq Yard 1,492,513.44 33.7635 412-00901 Concrete Pavement (9 Inch) (Special) 2085.000 Sq Yard 110,505.00 53.0000 412-00950 Concrete Pavement (9-1/2 Inch) 164605.000 Sq Yard 3,362,880.15 20.4300 412-01020 Concrete Pavement (10 Inch) (Fast Track) 120.000 Sq Yard 12,000.00 100.0000 412-01060 Concrete Pavement (10-1/2 Inch) (Fast Track) 940.000 Sq Yard 86,480.00 92.0000 412-01100 Concrete Pavement (11 Inch) 193969.000 Sq Yard 4,961,727.02 25.5800 412-01200 Concrete Pavement (12 Inch) 1031.000 Sq Yard 86,604.00 84.0000 412-01215 Concrete Pavement (12 Inch) (Reinforced) 4137.000 Sq Yard 289,590.00 70.0000 420-00100 Geotextile (Erosion Control) (Class A) 3578.000 Sq Yard 6,987.21 1.9528 420-00101 Geotextile (Erosion Control) (Class B) 390.400 Sq Yard 8,957.00 22.9431 420-00110 Geotextile (Drainage) (Class A) 3148.000 Sq Yard 4,640.60 1.4741 420-00130 Geotextile (Separator) (Class A) 93230.000 Sq Yard 60,599.50 0.6500 420-00200 Geotextile (Weed Barrier) 446.000 Sq Yard 1,561.00 3.5000 420-00500 Geotextile (Paving) 4992.000 Sq Yard 8,430.25 1.6888 420-00510 Geotextile (Crack Reduction) (High Density) 130.000 Sq Yard 3,250.00 25.0000 502-00100 Drilling Hole to Facilitate Pile Driving 2040.000 Lin Foot 20,400.00 10.0000 502-00140 Blast Hole to Facilitate Pile Driving 680.000 Lin Foot 6,800.00 10.0000 502-00460 Pile Tip 119.000 Each 11,516.00 96.7731 502-11057 Steel Piling (HP 10x57) 240.000 Lin Foot 9,972.00 41.5500 502-11274 Steel Piling (HP 12x74) 2653.000 Lin Foot 206,281.00 77.7539 503-00018 Drilled Caisson (18 Inch) 9540.000 Lin Foot 190,800.00 20.0000 503-00024 Drilled Caisson (24 Inch) 4344.000 Lin Foot 153,885.24 35.4248 503-00030 Drilled Caisson (30 Inch) 6156.000 Lin Foot 357,048.00 58.0000 503-00036 Drilled Caisson (36 Inch) 1972.000 Lin Foot 372,209.35 188.7471 503-00042 Drilled Caisson (42 Inch) 365.000 Lin Foot 64,946.20 177.9348 503-00048 Drilled Caisson (48 Inch) 429.000 Lin Foot 128,340.00 299.1608 503-00054 Drilled Caisson (54 Inch) 92.000 Lin Foot 27,715.20 301.2522 503-00060 Drilled Caisson (60 Inch) 320.000 Lin Foot 64,000.00 200.0000 504-03405 Retaining Wall (E) 1.000 Lump Sum 2,000,000.00 2000000.0000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 8 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 504-03406 Retaining Wall (F) 1.000 Lump Sum 700,000.00 700000.0000 504-04100 Mechanically Stabilized Earth Wall 50931.000 Sq Foot 948,684.15 18.6269 504-04200 Retaining Wall 1373.000 Sq Foot 92,663.77 67.4900 504-04420 Precast Panel Facing 6628.000 Sq Foot 165,700.00 25.0000 504-06100 Ground Nailed Wall 2250.000 Sq Foot 131,760.00 58.5600 504-08050 Stone Landscape Wall 1214.000 Sq Foot 90,831.48 74.8200 504-08100 Timber Retaining Wall 1040.000 Sq Foot 63,804.00 61.3500 504-08200 Masonry Retaining Wall 501.000 Sq Foot 8,016.00 16.0000 506-00036 Grouted Riprap (36 Inch) (Special) 760.000 Cubic Yard 83,600.00 110.0000 506-00206 Riprap (6 Inch) 2.000 Cubic Yard 424.00 212.0000 506-00209 Riprap (9 Inch) 147.500 Cubic Yard 9,612.08 65.1666 506-00212 Riprap (12 Inch) 332.000 Cubic Yard 14,892.50 44.8569 506-00218 Riprap (18 Inch) 2287.000 Cubic Yard 86,253.50 37.7147 506-00224 Riprap (24 Inch) 860.000 Cubic Yard 26,660.00 31.0000 507-00000 Concrete Slope and Ditch Paving 1668.450 Cubic Yard 316,389.74 189.6309 507-00100 Concrete Slope and Ditch Paving (Reinforced) 225.400 Cubic Yard 59,173.24 262.5255 507-00200 Dry Rubble Slope and Ditch Paving 360.000 Cubic Yard 15,120.00 42.0000 507-00300 Grouted Rubble Slope and Ditch Paving 18.000 Cubic Yard 2,250.00 125.0000 507-00350 Grouted Riprap Slope and Ditch Paving 35.000 Cubic Yard 6,249.25 178.5500 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 56.600 Ton 5,919.00 104.5760 509-00000 Structural Steel 1614920.000 Pound 2,311,472.96 1.4313 509-00001 Structural Steel (Galvanized) 991.000 Pound 5,803.00 5.8557 512-00101 Bearing Device (Type I) 14.000 Each 25,100.00 1792.8571 512-00102 Bearing Device (Type II) 34.000 Each 50,500.00 1485.2941 513-00600 Bridge Drain 6.000 Each 22,800.00 3800.0000 513-00690 Bridge Drain (Special) 9.000 Each 26,958.10 2995.3444 514-00200 Pedestrian Railing (Steel) 364.000 Lin Foot 32,760.00 90.0000 514-01040 Bikeway Railing (Steel) 1275.000 Lin Foot 57,451.50 45.0600 515-00120 Waterproofing (Membrane) 6397.000 Sq Yard 49,090.88 7.6740 515-00400 Concrete Sealer 9635.000 Sq Yard 34,749.27 3.6066 515-00410 Concrete Sealer (Calcium Nitrite) 13.000 Sq Yard 206.70 15.9000 516-00000 Dampproofing (Asphalt) 305.000 Sq Yard 3,355.00 11.0000 518-00106 Waterstop (6 Inch) 102.000 Lin Foot 612.00 6.0000 518-01004 Bridge Expansion Device (0-4 Inch) 931.000 Lin Foot 130,402.32 140.0669 518-03000 Sawing and Sealing Bridge Joint 648.000 Lin Foot 2,592.00 4.0000 601-01000 Concrete Class B 98.000 Cubic Yard 28,360.00 289.3878 601-01025 Concrete Class B (Miscellaneous) 20.000 Cubic Yard 21,200.00 1060.0000 601-01040 Concrete Class B (Bridge) 171.000 Cubic Yard 73,742.25 431.2412 601-01050 Concrete Class B (Wall) 35.000 Cubic Yard 13,155.45 375.8700 601-03000 Concrete Class D 269.000 Cubic Yard 80,700.00 300.0000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 9 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 601-03030 Concrete Class D (Box Culvert) 3016.000 Cubic Yard 956,243.61 317.0569 601-03040 Concrete Class D (Bridge) 6041.000 Cubic Yard 1,779,818.50 294.6232 601-03050 Concrete Class D (Wall) 3193.800 Cubic Yard 1,099,095.60 344.1341 601-06100 Concrete (Patching) 78.500 Cubic Yard 130,990.00 1668.6624 601-06150 Concrete (Patching) 104.000 Sq Foot 4,409.60 42.4000 601-10310 Fly Ash Slurry 75.000 Cubic Yard 6,375.00 85.0000 601-40200 Class 5 Finish 12655.000 Sq Foot 12,022.25 0.9500 601-40250 Bridge Deck Finish (Sawed Grooves) 8860.000 Sq Yard 50,348.06 5.6826 601-40300 Structural Concrete Coating 29286.000 Sq Yard 145,331.60 4.9625 602-00000 Reinforcing Steel 1148396.000 Pound 621,947.61 0.5416 602-00020 Reinforcing Steel (Epoxy Coated) 1433911.000 Pound 885,259.93 0.6174 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 243.000 Lin Foot 7,776.00 32.0000 603-01150 15 Inch Reinforced Concrete Pipe 334.000 Lin Foot 18,370.00 55.0000 603-01180 18 Inch Reinforced Concrete Pipe 1338.000 Lin Foot 75,076.18 56.1107 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 2149.700 Lin Foot 86,388.00 40.1861 603-01240 24 Inch Reinforced Concrete Pipe 8400.000 Lin Foot 443,472.64 52.7944 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 305.000 Lin Foot 26,700.00 87.5410 603-01300 30 Inch Reinforced Concrete Pipe 860.000 Lin Foot 38,680.00 44.9767 603-01360 36 Inch Reinforced Concrete Pipe 616.000 Lin Foot 40,062.40 65.0364 603-01420 42 Inch Reinforced Concrete Pipe 475.000 Lin Foot 46,490.00 97.8737 603-01540 54 Inch Reinforced Concrete Pipe 224.000 Lin Foot 24,192.00 108.0000 603-01600 60 Inch Reinforced Concrete Pipe 584.000 Lin Foot 125,560.00 215.0000 603-02180 23x14 Inch Reinforced Concrete Pipe Elliptical 30.000 Lin Foot 2,862.00 95.4000 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 115.000 Lin Foot 12,650.00 110.0000 603-02420 53x34 Inch Reinforced Concrete Pipe Elliptical 72.000 Lin Foot 8,311.68 115.4400 603-05018 18 Inch Reinforced Concrete End Section 12.000 Each 5,192.40 432.7000 603-05024 24 Inch Reinforced Concrete End Section 62.000 Each 33,008.17 532.3898 603-05030 30 Inch Reinforced Concrete End Section 3.000 Each 2,745.00 915.0000 603-05036 36 Inch Reinforced Concrete End Section 7.000 Each 5,117.99 731.1414 603-05042 42 Inch Reinforced Concrete End Section 1.000 Each 1,300.00 1300.0000 603-05060 60 Inch Reinforced Concrete End Section 1.000 Each 2,000.00 2000.0000 603-05118 23x14 Inch Reinforced Concrete End Section Elliptical 1.000 Each 954.00 954.0000 603-05124 30x19 Inch Reinforced Concrete End Section Elliptical 1.000 Each 800.00 800.0000 603-07240 24 Inch Reinforced Concrete Pipe (Jacked) 264.800 Lin Foot 132,400.00 500.0000 603-10060 6 Inch Corrugated Steel Pipe 3616.000 Lin Foot 57,856.00 16.0000 603-10120 12 Inch Corrugated Steel Pipe 54.000 Lin Foot 2,294.78 42.4959 603-10180 18 Inch Corrugated Steel Pipe 350.000 Lin Foot 9,933.27 28.3808 603-10240 24 Inch Corrugated Steel Pipe 547.000 Lin Foot 33,521.40 61.2823 603-10300 30 Inch Corrugated Steel Pipe 100.000 Lin Foot 6,900.00 69.0000 603-10360 36 Inch Corrugated Steel Pipe 210.000 Lin Foot 15,540.00 74.0000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 10 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-10420 42 Inch Corrugated Steel Pipe 4.000 Lin Foot 248.00 62.0000 603-10780 78 Inch Corrugated Steel Pipe 84.500 Lin Foot 14,365.00 170.0000 603-15090 90 Inch Equivalent Corrugated Steel Pipe Arch 64.800 Lin Foot 12,960.00 200.0000 603-30018 18 Inch Steel End Section 9.000 Each 2,070.00 230.0000 603-30024 24 Inch Steel End Section 7.000 Each 1,460.00 208.5714 603-30048 48 Inch Steel End Section 4.000 Each 4,200.00 1050.0000 603-33018 18 Inch Pipe Safety End Treatment 3.000 Each 2,190.00 730.0000 603-33024 24 Inch Pipe Safety End Treatment 1.000 Each 1,160.00 1160.0000 603-36018 Place 18 Inch Corrugated Steel Pipe 22.000 Lin Foot 1,144.00 52.0000 603-36024 Place 24 Inch Corrugated Steel Pipe 18.000 Lin Foot 1,019.70 56.6500 603-50003 3 Inch Plastic Pipe 3500.000 Lin Foot 28,245.00 8.0700 603-50004 4 Inch Plastic Pipe 1985.000 Lin Foot 33,034.50 16.6421 603-50006 6 Inch Plastic Pipe 402.000 Lin Foot 10,050.00 25.0000 603-50008 8 Inch Plastic Pipe 592.000 Lin Foot 19,752.26 33.3653 603-50010 10 Inch Plastic Pipe 1916.000 Lin Foot 41,730.48 21.7800 603-50012 12 Inch Plastic Pipe 122.000 Lin Foot 4,376.14 35.8700 603-50018 18 Inch Plastic Pipe 140.000 Lin Foot 6,097.00 43.5500 603-50024 24 Inch Plastic Pipe 357.000 Lin Foot 29,785.00 83.4314 603-61180 18 Inch Flexible Pipe 245.000 Lin Foot 9,479.70 38.6927 603-61240 24 Inch Flexible Pipe 31.000 Lin Foot 1,705.00 55.0000 604-00305 Inlet Type C (5 Foot) 41.000 Each 83,871.50 2045.6463 604-00310 Inlet Type C (10 Foot) 9.000 Each 24,494.30 2721.5889 604-00320 Inlet Type C (20 Foot) 1.000 Each 6,000.00 6000.0000 604-00350 Inlet Type C (Special) 2.000 Each 5,414.60 2707.3000 604-00505 Inlet Type D (5 Foot) 4.000 Each 10,060.00 2515.0000 604-00510 Inlet Type D (10 Foot) 1.000 Each 3,300.00 3300.0000 604-00550 Inlet Type D (Special) 1.000 Each 7,500.00 7500.0000 604-00605 Inlet Type D (Double) (5 Foot) 1.000 Each 4,350.00 4350.0000 604-13005 Inlet Type 13 (5 Foot) 6.000 Each 13,800.00 2300.0000 604-13006 Inlet Type 13 (5 Foot) (Special) 1.000 Each 5,000.00 5000.0000 604-13010 Inlet Type 13 (10 Foot) 1.000 Each 3,500.00 3500.0000 604-13015 Inlet Type 13 (15 Foot) 2.000 Each 12,000.00 6000.0000 604-19105 Inlet Type R L 5 (5 Foot) 3.000 Each 10,500.00 3500.0000 604-19110 Inlet Type R L 5 (10 Foot) 1.000 Each 5,500.00 5500.0000 604-19115 Inlet Type R L 5 (15 Foot) 1.000 Each 6,500.00 6500.0000 604-19205 Inlet Type R L 10 (5 Foot) 2.000 Each 10,056.90 5028.4500 604-19210 Inlet Type R L 10 (10 Foot) 2.000 Each 7,800.00 3900.0000 604-19710 Inlet Special (Trench Drain) (10 Inch Width) 110.000 Lin Foot 12,469.60 113.3600 604-20000 Outlet Structure 1.000 Each 4,700.00 4700.0000 604-25005 Vane Grate Inlet (5 Foot) 15.000 Each 52,342.50 3489.5000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 11 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 604-25010 Vane Grate Inlet (10 Foot) 2.000 Each 8,200.00 4100.0000 604-25015 Vane Grate Inlet (15 Foot) 1.000 Each 6,000.00 6000.0000 604-26005 Vane Grate Inlet (Double) (5 Foot) 23.000 Each 111,028.00 4827.3043 604-26010 Vane Grate Inlet (Double) (10 Foot) 14.000 Each 74,890.00 5349.2857 604-30005 Manhole Slab Base (5 Foot) 3.000 Each 7,000.00 2333.3333 604-30010 Manhole Slab Base (10 Foot) 16.000 Each 58,072.00 3629.5000 604-30015 Manhole Slab Base (15 Foot) 9.000 Each 36,195.90 4021.7667 605-00060 6 Inch Perforated Pipe Underdrain 892.000 Lin Foot 12,412.00 13.9148 605-00240 24 Inch Perforated Pipe Underdrain 360.000 Lin Foot 20,034.00 55.6500 605-83001 Geocomposite Drain without Pipe 665.000 Sq Yard 6,650.00 10.0000 605-83002 Geocomposite Drain with Pipe 2739.000 Sq Yard 31,349.00 11.4454 605-84000 Subsurface Drain Outlet 412.000 Lin Foot 5,797.00 14.0704 606-00301 Guardrail Type 3 (6-3 Post Spacing) 55527.000 Lin Foot 704,888.55 12.6945 606-00350 Guardrail Type 3 (Double) (6-3 Post Spacing) 31177.000 Lin Foot 427,893.20 13.7246 606-00400 Guardrail Type 4 10.000 Lin Foot 2,478.00 247.8000 606-00420 Guardrail Type 4 (Style CA) 3349.000 Lin Foot 174,148.00 52.0000 606-00450 Guardrail Type 4 (Style CE) 231.000 Lin Foot 34,650.00 150.0000 606-00465 Guardrail Type 4 (Precast-Portable) 3126.000 Lin Foot 65,458.00 20.9399 606-00701 Guardrail (Cable) 917.000 Lin Foot 7,336.00 8.0000 606-00705 Guardrail Type 7 (Special) 1377.000 Lin Foot 114,032.20 82.8121 606-00710 Guardrail Type 7 (Style CA) 17752.000 Lin Foot 690,429.40 38.8930 606-00720 Guardrail Type 7 (Style CC) 17973.950 Lin Foot 525,562.40 29.2402 606-00730 Guardrail Type 7 (Style CD) 100.000 Lin Foot 7,000.00 70.0000 606-00745 Guardrail Type 7 (Style CE)(Concrete Glare Screen) 450.000 Lin Foot 40,500.00 90.0000 606-01320 End Anchorage Type 3B 11.000 Each 6,390.00 580.9091 606-01340 End Anchorage Type 3D 46.000 Each 20,007.00 434.9348 606-01350 End Anchorage Type 3E 4.000 Each 1,120.00 280.0000 606-01360 End Anchorage Type 3F 3.000 Each 12,130.00 4043.3333 606-01370 End Anchorage Type 3G 91.000 Each 81,981.94 900.9004 606-01380 End Anchorage Type 3H 40.000 Each 20,803.00 520.0750 606-01385 End Anchorage Type 3J 10.000 Each 7,610.00 761.0000 606-01390 End Anchorage Type 3K 9.000 Each 6,350.00 705.5556 606-01410 End Anchorage (Cable) 4.000 Each 5,200.00 1300.0000 606-01460 Median Terminal 15.000 Each 61,540.00 4102.6667 606-02001 End Anchorage (Slotted Rail Terminal) 132.000 Each 197,881.84 1499.1048 606-02003 End Anchorage (Nonflared) 31.000 Each 57,754.40 1863.0452 606-02005 End Anchorage (Flared) 16.000 Each 22,360.00 1397.5000 606-10305 Bridge Rail Type 3 (Special) 119.000 Lin Foot 4,760.00 40.0000 606-10405 Bridge Rail Type 4 (Special) 215.000 Lin Foot 18,060.00 84.0000 606-10700 Bridge Rail Type 7 4895.000 Lin Foot 292,256.35 59.7051 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 12 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 606-10750 Bridge Rail Type 7R 1064.000 Lin Foot 90,227.20 84.8000 606-11000 Bridge Rail Type 10 1519.000 Lin Foot 99,423.51 65.4533 606-11010 Bridge Rail Type 10R 5759.300 Lin Foot 371,556.60 64.5142 606-11020 Bridge Rail Type 10H 194.000 Lin Foot 13,580.00 70.0000 606-11030 Bridge Rail Type 10M 690.000 Lin Foot 59,050.00 85.5797 606-11032 Bridge Rail Type 10M (Special) 3539.000 Lin Foot 725,495.00 205.0000 607-00000 Line Post 707.000 Each 7,106.52 10.0517 607-00005 End Post 84.000 Each 7,818.29 93.0749 607-00010 Corner and Line Brace Post 483.000 Each 26,193.77 54.2314 607-01000 Fence Barbed Wire with Metal Posts 27744.000 Lin Foot 37,693.00 1.3586 607-11200 Fence Combination Wire With Metal Posts 1230.000 Lin Foot 2,779.80 2.2600 607-11300 Fence Combination Wire With Treated Wooden Posts 6591.000 Lin Foot 39,546.00 6.0000 607-11455 Fence Wood 173.000 Lin Foot 4,498.00 26.0000 607-11460 Fence Wood Railing 500.000 Lin Foot 9,500.00 19.0000 607-11525 Fence (Plastic) 400.000 Lin Foot 1,720.00 4.3000 607-11580 Fence (Temporary) 14142.000 Lin Foot 30,987.10 2.1911 607-13000 Fence Masonry (Sound Barrier) 7559.000 Sq Foot 105,826.00 14.0000 607-15100 Fence (Sound Barrier) 16700.000 Sq Foot 467,600.00 28.0000 607-52900 Line Post (Chain Link) 207.000 Each 6,934.50 33.5000 607-52905 End Post (Chain Link) 22.000 Each 2,471.88 112.3582 607-52910 Corner and Line Brace Post (Chain Link) 16.000 Each 2,420.00 151.2500 607-53137 Fence Chain Link (Special) (36 Inch) 2796.000 Lin Foot 67,932.00 24.2961 607-53148 Fence Chain Link (48 Inch) 1965.000 Lin Foot 15,501.48 7.8888 607-53160 Fence Chain Link (60 Inch) 50.000 Lin Foot 750.00 15.0000 607-53172 Fence Chain Link (72 Inch) 4493.000 Lin Foot 38,370.00 8.5400 607-53173 Fence Chain Link (Special) (72 Inch) 512.000 Lin Foot 13,777.92 26.9100 607-60112 12 Foot Gate 4.000 Each 6,000.00 1500.0000 607-60116 16 Foot Gate 2.000 Each 2,400.26 1200.1300 607-60120 20 Foot Gate 3.000 Each 1,290.00 430.0000 607-60266 16 Foot Gate Double (Chain Link) 1.000 Each 915.00 915.0000 607-60620 Road Closure Gate 5.000 Each 34,536.30 6907.2600 608-00000 Concrete Sidewalk 7719.000 Sq Yard 211,747.88 27.4320 608-00005 Concrete Sidewalk (Special) 769.000 Sq Yard 26,146.00 34.0000 608-00010 Concrete Curb Ramp 673.000 Sq Yard 31,379.64 46.6265 608-00060 Stone Pavers 9557.000 Sq Foot 159,888.61 16.7300 608-00350 Concrete Sidewalk (Colored) 559.000 Sq Yard 22,605.96 40.4400 608-00400 Concrete Sidewalk (Colored) (Exposed Aggregate) 3472.000 Sq Yard 135,581.60 39.0500 608-10010 Sidewalk Drain 2.000 Each 3,100.00 1550.0000 609-20010 Curb Type 2 (Section B) 100.000 Lin Foot 2,500.00 25.0000 609-21010 Curb and Gutter Type 2 (Section I-B) 13404.000 Lin Foot 150,809.41 11.2511 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 13 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 609-21011 Curb and Gutter Type 2 (Section I-M) 190.000 Lin Foot 3,192.00 16.8000 609-21020 Curb and Gutter Type 2 (Section II-B) 13262.000 Lin Foot 202,982.60 15.3056 609-21900 Curb and Gutter Type 2 Special 2192.000 Lin Foot 17,536.00 8.0000 609-24000 Gutter Type 2 Special 238.000 Lin Foot 9,780.00 41.0924 609-24002 Gutter Type 2 (2 Foot) 824.000 Lin Foot 30,076.00 36.5000 609-24003 Gutter Type 2 (3 Foot) 126.000 Lin Foot 3,780.00 30.0000 609-24004 Gutter Type 2 (4 Foot) 25.000 Lin Foot 1,000.00 40.0000 609-24005 Gutter Type 2 (5 Foot) 45.000 Lin Foot 1,192.50 26.5000 609-24006 Gutter Type 2 (6 Foot) 32.000 Lin Foot 1,280.00 40.0000 609-24010 Gutter Type 2 (10 Foot) 90.000 Lin Foot 3,780.00 42.0000 609-40010 Curb Type 4 (Section B) 22.000 Lin Foot 572.00 26.0000 609-40031 Curb Type 4 (Section B) (Key-Way) 350.000 Lin Foot 6,300.00 18.0000 609-60011 Curb Type 6 (Section M) 5223.000 Lin Foot 39,525.80 7.5676 610-00030 Median Cover Material (Concrete) 3513.000 Sq Foot 26,763.00 7.6183 610-00040 Median Cover Material (Bituminous) 200.000 Ton 19,800.00 99.0000 610-00055 Median Cover Material (Stone) 22190.000 Sq Foot 36,285.00 1.6352 611-00016 16 Foot Cattle Guard 2.000 Each 11,000.00 5500.0000 611-00024 24 Foot Cattle Guard 1.000 Each 5,000.00 5000.0000 611-00036 36 Foot Cattle Guard 2.000 Each 33,732.26 16866.1300 612-00001 Delineator (Type I) 2184.000 Each 38,719.43 17.7287 612-00002 Delineator (Type II) 545.000 Each 10,103.85 18.5392 612-00003 Delineator (Type III) 149.000 Each 2,978.36 19.9890 612-00022 Delineator (Type II) (Barrier) 203.000 Each 3,026.55 14.9091 612-00033 Delineator (Type III) (Extra Height) 37.000 Each 1,221.00 33.0000 612-00041 Delineator (Flexible) (Type I) 54.000 Each 1,031.40 19.1000 612-00042 Delineator (Flexible) (Type II) 86.000 Each 2,118.80 24.6372 612-00043 Delineator (Flexible) (Type III) 14.000 Each 339.90 24.2786 612-00046 Delineator (Flexible) (Special) (Type I) 32.000 Each 800.00 25.0000 612-00047 Delineator (Flexible) (Special) (Type II) 29.000 Each 812.00 28.0000 612-00048 Delineator (Flexible) (Special (Type III) 6.000 Each 180.00 30.0000 613-00001 Directional Boring Conduit 1980.000 Lin Foot 20,790.00 10.5000 613-00075 3/4 Inch Electrical Conduit 2272.000 Lin Foot 9,723.00 4.2795 613-00100 1 Inch Electrical Conduit 1633.000 Lin Foot 3,877.90 2.3747 613-00125 1-1/4 Inch Electrical Conduit 1710.000 Lin Foot 3,608.10 2.1100 613-00150 1-1/2 Inch Electrical Conduit 8500.000 Lin Foot 51,935.00 6.1100 613-00200 2 Inch Electrical Conduit 25056.000 Lin Foot 167,768.42 6.6957 613-00201 2 Inch Electrical Conduit (Jacked) 4507.000 Lin Foot 58,640.50 13.0110 613-00300 3 Inch Electrical Conduit 7332.000 Lin Foot 93,053.30 12.6914 613-00301 3 Inch Electrical Conduit (Jacked) 2785.000 Lin Foot 49,138.00 17.6438 613-01150 1-1/2 Inch Electrical Conduit (Plastic) 2430.000 Lin Foot 5,491.80 2.2600 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 14 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 613-01200 2 Inch Electrical Conduit (Plastic) 18420.000 Lin Foot 156,512.00 8.4969 613-01300 3 Inch Electrical Conduit (Plastic) 11811.000 Lin Foot 144,597.50 12.2426 613-05000 Direct-Burial Cable 3606.000 Lin Foot 26,125.00 7.2449 613-07000 Pull Box (Special) 57.000 Each 23,681.60 415.4667 613-10000 Wiring 11.000 Lump Sum 190,813.78 17346.7073 613-12000 Luminaire Fluorescent (Tunnel) 13.000 Each 16,900.00 1300.0000 613-15100 Recessed Light 37.000 Each 20,297.09 548.5700 613-16000 Luminaire (Special) 6.000 Each 9,600.00 1600.0000 613-16010 Light Standard and Luminaire (Decorative) 17.000 Each 117,300.00 6900.0000 613-30005 Light Standard and Luminaire (Pedestrian) 28.000 Each 64,252.20 2294.7214 613-30400 Light Standard Aluminum (40 Foot) 3.000 Each 15,450.00 5150.0000 613-32250 Light Standard Steel (25 Foot) 14.000 Each 14,490.00 1035.0000 613-32254 Light Standard Steel (25 Foot) (4-Arm) 1.000 Each 4,000.00 4000.0000 613-32300 Light Standard Steel (30 Foot) 15.000 Each 13,461.00 897.4000 613-32350 Light Standard Steel (35 Foot) 2.000 Each 8,000.00 4000.0000 613-32400 Light Standard Steel (40 Foot) 11.000 Each 26,660.00 2423.6364 613-34250 Light Standard Metal (25 Foot) 4.000 Each 6,800.00 1700.0000 613-34300 Light Standard Metal (30 Foot) 23.000 Each 35,945.55 1562.8500 613-34350 Light Standard Metal (35 Foot) 4.000 Each 8,400.00 2100.0000 613-34400 Light Standard Metal (40 Foot) 13.000 Each 39,390.00 3030.0000 613-40000 Concrete Foundation Pad 113.000 Each 64,197.55 568.1199 613-40010 Light Standard Foundation 27.000 Each 17,200.00 637.0370 613-40020 Transformer Base Aluminum 13.000 Each 20,800.00 1600.0000 613-50060 Portable Power Generator 2.000 Each 14,400.00 7200.0000 613-50100 Lighting Control Center 2.000 Each 20,000.00 10000.0000 613-50150 Secondary Service Pedestal 1.000 Each 315.00 315.0000 613-70100 Luminaire High Pressure Sodium (100 Watt) 4.000 Each 1,800.00 450.0000 613-70150 Luminaire High Pressure Sodium (150 Watt) 8.000 Each 2,520.00 315.0000 613-70250 Luminaire High Pressure Sodium (250 Watt) 64.000 Each 38,828.15 606.6898 613-70400 Luminaire High Pressure Sodium (400 Watt) 34.000 Each 15,636.00 459.8824 613-73500 Luminaire Metal Halide (250 Watt) 18.000 Each 10,800.00 600.0000 613-74000 Light Mast Arm 8.000 Each 11,250.00 1406.2500 614-00011 Sign Panel (Class I) 3422.010 Sq Foot 66,865.31 19.5398 614-00012 Sign Panel (Class II) 4790.520 Sq Foot 103,612.75 21.6287 614-00013 Sign Panel (Class III) 7852.000 Sq Foot 190,050.24 24.2041 614-00035 Sign Panel (Special) 28.000 Sq Foot 700.00 25.0000 614-00036 Sign Panel (Special) 2.000 Each 3,300.00 1650.0000 614-00044 Timber Sign Post 4x4 Inch 112.000 Lin Foot 1,061.00 9.4732 614-00066 Timber Sign Post 6x6 Inch 482.500 Lin Foot 4,064.25 8.4233 614-00200 Steel Sign Post (U-2) 1049.500 Lin Foot 6,817.00 6.4955 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 15 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00216 Steel Sign Post (2x2 Inch Tubing) 540.000 Lin Foot 6,488.50 12.0157 614-00218 Steel Sign Post (2.25x2.25 Inch Tubing) 80.000 Lin Foot 720.00 9.0000 614-00220 Steel Sign Post (2.5x2.5 Inch Tubing) 55.000 Lin Foot 653.00 11.8727 614-00375 Steel Sign Post (S 3x7.5) 9.000 Lin Foot 157.50 17.5000 614-00477 Steel Sign Post (S 4x7.7) 87.000 Lin Foot 2,393.00 27.5057 614-00612 Steel Sign Post (W 6x12) 42.500 Lin Foot 1,540.30 36.2424 614-00615 Steel Sign Post (W 6x15) 373.100 Lin Foot 13,389.46 35.8871 614-00818 Steel Sign Post (W 8x18) 354.900 Lin Foot 13,354.50 37.6289 614-00821 Steel Sign Post (W 8x21) 112.400 Lin Foot 3,949.10 35.1343 614-01022 Steel Sign Post (W 10x22) 358.400 Lin Foot 15,413.40 43.0061 614-01026 Steel Sign Post (W 10x26) 46.900 Lin Foot 1,547.70 33.0000 614-01226 Steel Sign Post (W 12x26) 201.300 Lin Foot 9,049.20 44.9538 614-01502 Steel Sign Post (2 Inch Round) 2590.000 Lin Foot 33,913.81 13.0941 614-01552 Steel Sign Post (2.5 Inch Round) (Slipbase) 5977.000 Lin Foot 181,848.61 30.4247 614-03001 Concrete Footing (Type 1) 3.000 Each 1,821.00 607.0000 614-03002 Concrete Footing (Type 2) 26.000 Each 17,779.02 683.8085 614-03003 Concrete Footing (Type 3) 20.000 Each 15,444.00 772.2000 614-03004 Concrete Footing (Type 4) 6.000 Each 5,076.00 846.0000 614-03005 Concrete Footing (Type 5) 20.000 Each 24,696.00 1234.8000 614-03006 Concrete Footing (Type 6) 2.000 Each 2,200.00 1100.0000 614-03007 Concrete Footing (Type 7) 9.000 Each 17,000.00 1888.8889 614-03100 Concrete Footing (Traffic Signal Pole) 1.000 Each 11,040.00 11040.0000 614-07000 Mask Sign Legend 4.000 Each 400.00 100.0000 614-07100 Modification of Sign Legend 4.000 Lump Sum 4,013.25 1003.3125 614-10030 Paint Overhead Sign Structure 2.000 Each 18,660.00 9330.0000 614-10126 Variable Message Sign (Fiber Optic) 2.000 Each 18,900.00 9450.0000 614-10600 Sign Bridge Structure (60 to less than 65 Foot Frame) 2.000 Each 67,175.00 33587.5000 614-10700 Sign Bridge Structure (70 to less than 75 Foot Frame) 1.000 Each 35,000.00 35000.0000 614-60250 Cantilever Structure (25 to less than 30 Foot Frame) 4.000 Each 76,500.00 19125.0000 614-70117 Pedestrian Signal Face (16) 68.000 Each 46,456.00 683.1765 614-70216 Traffic Signal Face (8-8) 4.000 Each 4,044.00 1011.0000 614-70324 Traffic Signal Face (8-8-8) 5.000 Each 2,250.00 450.0000 614-70328 Traffic Signal Face (12-8-8) 4.000 Each 5,056.00 1264.0000 614-70336 Traffic Signal Face (12-12-12) 189.000 Each 235,817.30 1247.7106 614-70560 Traffic Signal Face (12-12-12-12-12) 20.000 Each 33,207.20 1660.3600 614-72430 Traffic Signal (24 Inch x 30 Inch Blankout LED Sign) 3.000 Each 6,551.55 2183.8500 614-72855 Traffic Signal Controller Cabinet 7.000 Each 46,050.00 6578.5714 614-72858 Pedestal Pole (3 Foot 6 Inch) 2.000 Each 2,000.00 1000.0000 614-72860 Pedestrian Push Button 28.000 Each 3,724.00 133.0000 614-72864 Fire Preemption Unit 4.000 Each 3,360.00 840.0000 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 16 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-72865 Pedestrian Interval Timer 4.000 Each 1,800.00 450.0000 614-72866 Fire Preemption Unit and Timer 1.000 Each 3,477.00 3477.0000 614-72871 Loop Detector Wire (Prefab) Special 3164.000 Lin Foot 14,598.00 4.6138 614-72875 Loop Detector Wire 15964.000 Lin Foot 45,246.00 2.8343 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 19.000 Each 9,388.85 494.1500 614-72878 Traffic Signal Vehicle Detector Amplifier (Loop Type) 11.000 Each 9,732.64 884.7855 614-72882 Traffic Signal Vehicle Detector (Micro Type) 30.000 Each 12,020.77 400.6923 614-72884 Traffic Signal Vehicle Detector (Micro Wave Type) 8.000 Each 26,080.00 3260.0000 614-72885 Traffic Signal Vehicle Detector (Special) 4.000 Each 38,400.00 9600.0000 614-72886 Intersection Detection System (Camera) 4.000 Each 48,664.00 12166.0000 614-72887 Microwave Vehicle Radar Detector 4.000 Each 27,040.00 6760.0000 614-72891 Telephone Interconnect Wire 6900.000 Lin Foot 6,640.50 0.9624 614-73010 Piezo Electric Tube, Class 2 (Install Only) 6.000 Each 3,390.00 565.0000 614-80000 Flashing Beacon 13.000 Each 23,027.30 1771.3308 614-80385 Rumble Strip 156024.000 Lin Foot 17,162.64 0.1100 614-81010 Traffic Signal-Light Pole Steel (1 Mast Arm) 20.000 Each 158,957.39 7947.8695 614-81015 Traffic Signal-Light Pole Aluminum (1 Mast Arm) 8.000 Each 92,000.00 11500.0000 614-81020 Traffic Signal-Light Pole Steel (2 Mast Arm) 3.000 Each 54,324.00 18108.0000 614-82010 Traffic Signal Pole Steel (1 Mast Arm) 15.000 Each 136,697.65 9113.1767 614-82020 Traffic Signal Pole Steel (2 Mast Arm) 2.000 Each 17,800.00 8900.0000 614-84000 Traffic Signal Pedestal Pole Steel 11.000 Each 13,758.00 1250.7273 614-85005 Impact Attenuator (Sand Filled Plastic Barrel) 138.000 Each 38,208.06 276.8700 614-85115 Impact Attenuator (Quadguard) 15.000 Each 398,207.30 26547.1533 614-85362 Traffic Signal-Light Span Wire Pole (12 Inch) 4.000 Each 13,788.00 3447.0000 614-86005 Telemetry (Master) 1.000 Lump Sum 7,800.00 7800.0000 614-86105 Telemetry (Field) 7.000 Each 18,579.00 2654.1429 614-86238 Traffic Signal Controller (Solid State) (Full-Actuated 2.000 Each 29,723.00 14861.5000 614-86240 Traffic Signal Controller (Type 170) 11.000 Each 77,000.00 7000.0000 614-86740 Weather Monitoring System 2.000 Lump Sum 105,086.00 52543.0000 614-86900 Modification of Traffic Signal Controller 4.000 Each 3,000.00 750.0000 614-87020 Optical Transceiver 2.000 Each 3,832.00 1916.0000 614-87406 Fiber Optic Cable (Single Mode) (6 Strands) 3250.000 Lin Foot 11,375.00 3.5000 615-00030 Embankment Protector Type 3 3.000 Each 2,747.45 915.8167 615-00050 Embankment Protector Type 5 7.000 Each 12,733.92 1819.1314 615-22405 24 Inch Slide Headgate (5 Foot Frame) 1.000 Each 1,611.00 1611.0000 616-30024 24 Inch Trash Guard 1.000 Each 400.00 400.0000 617-00012 12 Inch Culvert Pipe 140.000 Lin Foot 2,970.00 21.2143 617-00018 18 Inch Culvert Pipe 462.100 Lin Foot 21,617.00 46.7799 617-00024 24 Inch Culvert Pipe 973.600 Lin Foot 47,566.20 48.8560 617-00030 30 Inch Culvert Pipe 297.000 Lin Foot 31,097.07 104.7039 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 17 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 617-00036 36 Inch Culvert Pipe 347.300 Lin Foot 18,031.26 51.9184 617-00048 48 Inch Culvert Pipe 272.000 Lin Foot 13,053.28 47.9900 617-00060 60 Inch Culvert Pipe 88.000 Lin Foot 6,013.92 68.3400 617-03000 Detour Culvert Pipe 2.000 Lump Sum 33,900.00 16950.0000 618-00154 Prestressed Concrete I (BT54) 1315.000 Lin Foot 204,210.09 155.2928 618-00163 Prestressed Concrete I (BT63) 2451.400 Lin Foot 319,932.21 130.5100 618-05001 Place Prestressed Concrete Unit 1.000 Each 7,000.00 7000.0000 618-07110 Prestressed Concrete Unit (Bulb T Section) (110 to 115 9.000 Each 135,000.00 15000.0000 619-00000 Water Meter and Vault 2.000 Each 6,276.90 3138.4500 619-00005 Water Line 1.000 Lump Sum 38,000.00 38000.0000 619-10100 10 Inch Welded Steel Pipe 497.000 Lin Foot 41,748.00 84.0000 619-10187 18 Inch Welded Steel Pipe (Jacked) 515.000 Lin Foot 86,520.00 168.0000 619-10207 20 Inch Welded Steel Pipe (Jacked) 506.000 Lin Foot 87,664.50 173.2500 619-10307 30 Inch Welded Steel Pipe (Jacked) 105.000 Lin Foot 34,650.00 330.0000 619-40080 1 Inch Copper Pipe 10.000 Lin Foot 280.00 28.0000 619-40160 2 Inch Copper Pipe 196.000 Lin Foot 3,910.20 19.9500 619-50040 1/2 Inch Plastic Pipe 21250.000 Lin Foot 28,687.50 1.3500 619-50060 3/4 Inch Plastic Pipe 300.000 Lin Foot 900.00 3.0000 619-50080 1 Inch Plastic Pipe 9666.000 Lin Foot 16,928.70 1.7514 619-50100 1-1/4 Inch Plastic Pipe 14459.000 Lin Foot 103,535.80 7.1606 619-50120 1-1/2 Inch Plastic Pipe 3490.000 Lin Foot 48,457.23 13.8846 619-50160 2 Inch Plastic Pipe 4461.000 Lin Foot 31,140.00 6.9805 619-50200 2-1/2 Inch Plastic Pipe 1110.000 Lin Foot 3,318.90 2.9900 619-50320 4 Inch Plastic Pipe 2128.000 Lin Foot 23,133.68 10.8711 619-50321 4 Inch Plastic Pipe (Install Only) 210.000 Lin Foot 1,680.00 8.0000 619-50480 6 Inch Plastic Pipe 140.000 Lin Foot 2,660.00 19.0000 619-50640 8 Inch Plastic Pipe 152.000 Lin Foot 3,040.00 20.0000 619-50960 12 Inch Plastic Pipe 1719.000 Lin Foot 61,368.30 35.7000 619-75096 12 Inch Gate Valve 4.000 Each 6,329.40 1582.3500 619-76932 4 Inch Ball Valve 4.000 Each 1,722.00 430.5000 620-00001 Field Office (Class 1) 10.000 Each 78,000.00 7800.0000 620-00002 Field Office (Class 2) 9.000 Each 155,776.09 17308.4544 620-00005 Field Office (Special) 2.000 Each 120,000.00 60000.0000 620-00009 Field Office (State Furnished) 1.000 Each 5,500.00 5500.0000 620-00011 Field Laboratory (Class 1) 5.000 Each 37,625.30 7525.0600 620-00012 Field Laboratory (Class 2) 22.000 Each 278,922.59 12678.2995 620-00015 Field Laboratory (State Furnished) 1.000 Each 3,500.00 3500.0000 620-00020 Sanitary Facility 41.000 Each 49,387.83 1204.5812 621-00425 Detour 3.000 Lump Sum 281,000.00 93666.6667 621-00450 Detour Pavement 4550.000 Sq Yard 89,089.00 19.5800 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 18 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 622-00010 Bicycle Rack 3.000 Each 2,624.16 874.7200 622-00023 Glyphs 47.000 Each 34,650.92 737.2536 622-00024 Entry Sign 1.000 Each 2,016.14 2016.1400 622-00100 Shade Shelter 8.000 Each 57,867.32 7233.4150 622-00200 Table 19.000 Each 22,180.60 1167.4000 622-00250 Bench 3.000 Each 1,693.50 564.5000 622-00270 Bollard 21.000 Each 12,377.27 589.3938 622-00350 Trash Receptacle 19.000 Each 18,022.65 948.5605 622-00450 Ash Urn 12.000 Each 7,240.04 603.3367 622-00800 Comfort Station 3.000 Each 2,168,505.91 722835.3033 622-00820 Comfort Station Buildings With Utilities 1.000 Lump Sum 300,000.00 300000.0000 622-00850 Trailer Sanitary Station 1.000 Each 12,000.00 12000.0000 622-01000 Leaching Field 277.000 Sq Yard 24,930.00 90.0000 622-01125 Septic Tank (1250 Gal) 2.000 Each 3,700.00 1850.0000 622-03260 Sanitary Sewer Vault 1.000 Lump Sum 3,000.00 3000.0000 622-11050 Ridestop Building 4.000 Each 32,000.00 8000.0000 622-20080 Flagpole 7.000 Each 20,800.50 2971.5000 623-00164 Drip Emitter 15237.000 Each 41,154.30 2.7009 623-00168 1 Inch Emitter Valve Assembly 23.000 Each 9,430.00 410.0000 623-00205 4 Inch Pop-Up Spray Sprinkler 197.000 Each 4,757.55 24.1500 623-00212 12 Inch Pop-Up Spray Sprinkler 18.000 Each 907.20 50.4000 623-00308 1 Inch Pop-Up Rotary Sprinkler 353.000 Each 15,596.07 44.1815 623-01512 1-1/2 Inch Check Valve 2.000 Each 720.00 360.0000 623-01708 1 Inch Backflow Preventer 1.000 Each 1,300.00 1300.0000 623-01812 1-1/2 Inch Pressure Reducing Valve 1.000 Each 900.00 900.0000 623-01816 2 Inch Pressure Reducing Valve 1.000 Each 341.25 341.2500 623-02006 3/4 Inch Drain Valve 11.000 Each 755.00 68.6364 623-03004 3/4 In Drip Zone Control Valve 85.000 Each 7,225.00 85.0000 623-03106 3/4 Inch Automatic Control Valve 1.000 Each 130.00 130.0000 623-03108 1 Inch Automatic Control Valve 28.000 Each 5,591.25 199.6875 623-03112 1-1/2 Inch Automatic Control Valve 21.000 Each 4,299.75 204.7500 623-04000 Control Wire 24 Volt 88855.000 Lin Foot 14,229.40 0.1601 623-04006 3/4 Inch Quick-Coupler Valve 22.000 Each 843.01 38.3186 623-05010 1-1/4 Inch Gate Valve 1.000 Each 210.00 210.0000 623-05012 1-1/2 Inch Gate Valve 3.000 Each 720.00 240.0000 623-05016 2 Inch Gate Valve 17.000 Each 2,589.90 152.3471 623-05032 4 Inch Gate Valve 1.000 Each 630.00 630.0000 623-06900 Valve Box 3.000 Each 198.00 66.0000 623-08104 4 Station Automatic Controller 1.000 Each 400.00 400.0000 623-08124 24 Station Automatic Controller 2.000 Each 10,020.05 5010.0250 COLORADO DEPARTMENT OF TRANSPORTATION 13:04 Wednesday, April 12, 2000 19 INDEX AND AVERAGE UNIT BID PRICES FOR 1999 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 623-08130 30 Station Automatic Controller 1.000 Each 5,314.05 5314.0500 623-08210 Automatic Controller Transmitter/Receiver Unit 2.000 Each 4,200.00 2100.0000 623-09000 Booster Pump 1.000 Each 14,578.60 14578.6000 623-09900 Sprinkler System 1.000 Lump Sum 90,000.00 90000.0000 623-09905 Irrigation Assembly 1.000 Each 5,000.00 5000.0000 625-00000 Construction Surveying 39.000 Lump Sum 1,182,618.14 30323.5421 625-00001 Construction Surveying (Hourly) 144.000 Hour 15,850.00 110.0694 626-00000 Mobilization 60.000 Lump Sum 5,531,079.33 92184.6555 626-01000 Public Information Services 4.000 Lump Sum 96,575.00 24143.7500 627-00001 Pavement Marking Paint 11703.800 Gallon 249,175.48 21.2901 627-00002 Thermoplastic Pavement Marking 35486.000 Sq Foot 70,961.90 1.9997 627-00005 Epoxy Pavement Marking 121846.000 Gallon 4,620,417.91 37.9201 627-00025 4 Inch Pavement Marking Tape (Removable) 6438.000 Lin Foot 15,347.00 2.3838 627-00030 Raised Pavement Marker (Temporary) 1000.000 Each 5,000.00 5.0000 627-00032 Raised Flexible Pavement Marker (Temporary) 9500.000 Each 7,030.00 0.7400 627-00060 Preformed Plastic Pavement Marking (60 Mils) 162.000 Sq Foot 1,620.00 10.0000 627-00070 Preformed Thermoplastic Pavement Marking 15724.000 Sq Foot 129,648.00 8.2452 627-01000 Preformed Plastic Pavement Marking (Type A) 40823.000 Sq Foot 310,107.40 7.5964 627-02000 Preformed Plastic Pavement Marking (Type B) 121.000 Sq Foot 2,371.50 19.5992 627-03000 Preformed Plastic Pavement Marking (Type C) 6029.000 Sq Foot 45,612.32 7.5655 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 10260.000 Sq Foot 92,340.00 9.0000 627-30205 Thermoplastic Pavement Marking (Word-Symbol) 30.000 Sq Foot 150.00 5.0000 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 338.000 Sq Foot 2,907.50 8.6021 627-30305 Preformed Plastic Pavement Marking (60 Mil) (Word-Symb 59.000 Sq Foot 1,818.00 30.8136 627-30310 Preformed Plastic Pavement Marking (60 Mil) (Xwalk-Sto 480.000 Sq Foot 3,840.00 8.0000 627-30325 Preformed Plastic Pavement Marking (Type B) (Word-Symb 1308.000 Sq Foot 18,720.21 14.3121 627-30330 Preformed Plastic Pavement Marking (Type B) (Xwalk-Sto 4136.000 Sq Foot 32,245.50 7.7963 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol) 10575.500 Sq Foot 85,623.94 8.0964 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop L 87046.500 Sq Foot 528,668.32 6.0734 627-40000 Methyl Methacrylate Pavement Marking