Colorado Department of Transportation 11:56 Friday, November 7, 2008 1 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080103 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $4,147,695.60 100.38 STA133A-034 133/187 RESURFACING 3 M 20080103 ELAM CONSTRUCTION, INC. 2 $3,384,793.00 105.53 NH 0821-085 SH82 EAGLE COUNTY 3 M 20080103 INTERMOUNTAIN SLURRY SEAL, INC. 4 $1,086,860.86 93.15 STA139A-029 N OF DOUGLAS PASS CHIP SEALS 3 M 20080110 SEMA CONSTRUCTION, INC. 4 $22,577,777.77 77.69 STUR200-110 SH 16 ALIGNMENT FROM SH 85 TO 2 P 20080110 COULSON EXCAVATING COMPANY 6 $6,895,292.68 93.85 NH0853-066 US 85C SH 60 TO LASALLE 4 R 20080110 CONNELL RESOURCES, INC. ALL BIDS REJECTED - CDOT OPTION HB131A-033 SH 131 ROUTT COUNTY 3 R 20080110 CONNELL RESOURCES, INC. 5 $6,496,397.30 114.80 HB131A-033 SH 131 ROUTT COUNTY 3 R 20080117 PREMIER PAVING, INC. 8 $375,032.73 72.06 STA 0831-099 SH 83 AT RUSSELLVILLE ROAD SOU 1 R 20080117 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $245,745.00 85.77 NH 160A-002 DOUBLE TREE BRIDGE ( O-05-AJ) 5 M 20080117 PREMIER PAVING, INC. 6 $3,248,323.60 91.04 IM 0252-392 I-25, TOMAH ROAD TO DOUGLAS LA 1 U 20080117 UNITED COMPANIES OF MESA COUNTY 5 $5,293,502.15 103.75 IM0701-189 PALISADE EAST 3 R 20080124 COULSON EXCAVATING COMPANY 4 $4,773,079.65 98.06 NH0342-043 ON US 34 IN WELD COUNTY 4 U 20080124 ASPHALT PAVING CO. 6 $2,559,169.65 91.01 STA 093A-007 ON SH 93 IN BOULDER COUNTY 4 U 20080124 AGGREGATE INDUSTRIES - WCR, INC. 3 $13,751,365.26 87.09 C0253-199 I25 RUBBILIZATION N OF SH 56 4 U 20080131 KIEWIT WESTERN CO 4 $1,517,520.62 119.22 SHE 050A-007 SH 50 BETWEEN MORRIS/FORTINO T 2 P 20080131 AGGREGATE INDUSTRIES - WCR, INC. 6 $521,358.25 95.10 CCR600-303 CHATFIELD STATE PARK MAIN RD, 6 R 20080131 DKS ENTERPRISES INC. 3 $602,474.00 83.35 ITS0361-087 US 36 (FEDERAL BLVD TO BOULDER 00 R Colorado Department of Transportation 11:56 Friday, November 7, 2008 2 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080207 AMERICAN CIVIL CONSTRUCTORS, INC. 6 $1,993,539.00 98.52 HB 0131-050 SH 13 NORTH OF RIFLE 3 M 20080207 W.L. CONTRACTORS, INC. 5 $222,684.50 89.13 STA2873-148 FEDRERAL BLVD (SH 287) AT 70TH 6 U 20080207 LAFARGE WEST, INC 3 $5,100,598.18 96.68 NH0342-048 US 34 IN WELD COUNTY 4 R 20080207 ROCKY MOUNTAIN ENTERPRISES, INC. 3 $293,837.07 86.89 CM240-112 COLORADO SPRINGS - VARIOUS LOC 2 U 20080207 UNITED COMPANIES OF MESA COUNTY 4 $656,970.65 81.24 NH 5502-060 US 550B MILE POST 106.272 TO M 5 R 20080207 UNITED COMPANIES OF MESA COUNTY 4 $4,515,688.50 77.03 C 5502-063 US 550 SILVERTON TO RED MTN PA 5 M 20080207 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $5,012,675.57 83.43 NH 2851-004 US 285 RESURFACE FROM NEW MEXI 5 M 20080214 ASPHALT CONSTRUCTORS INC. 5 $3,362,381.60 99.59 STA 017A-010 BEGINNING OF SH 17 FROM MP 69. 5 R 20080214 BRANNAN SAND AND GRAVEL, LLC 5 $3,635,675.58 84.31 IM 0252-386 I-25: RESURFACE 23RD TO 48TH 6 U 20080214 BRANNAN SAND AND GRAVEL, LLC 7 $625,811.84 75.84 STA 391A-003 KIPLING: 6TH AVE TO COLFAX 6 U 20080214 SCOTT CONTRACTING INC. 5 $184,655.00 100.13 SHE0741-016 THE INTERSECTION OF SH 74 AND 1 M 20080214 APC SOUTHERN CONSTRUCTION COMPANY, LLC 4 $5,376,287.95 105.97 NH 1602-116 SOUTH FORK EAST 5 M 20080214 SCHMIDT CONSTRUCTION COMPANY 3 $6,133,402.89 88.62 STA0252-397 I25 NORTHGATE NORTH 2 U 20080214 A & S CONSTRUCTION CO. & AFFILIATED CO. 4 $4,567,070.50 111.65 HB135A-024 SH 135 CRESTED BUTTE SOUTH 3 M 20080215 JALISCO INTERNATIONAL, INC. 1 $820,290.00 100.44 C 0253-202 I-25 6 U 20080228 PREMIER PAVING, INC. 8 $1,479,928.52 92.33 NH0405-032 COLFAX AVENUE FROM COLORADO B 6 U 20080228 PREMIER PAVING, INC. 8 $816,806.10 90.23 NH 0404-046 COLFAX AVE: ARAPAHOE/ADAMS COU 6 U Colorado Department of Transportation 11:56 Friday, November 7, 2008 3 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080228 PREMIER PAVING, INC. 4 $3,399,903.26 93.91 IM0252-393 DENVER - I-25 FROM SANTA FE DR 6 U 20080228 BRANNAN SAND AND GRAVEL, LLC 7 $2,419,993.55 94.76 STA 002A-001 COLO. BLVD(SH 2A): MEXICO TO A 6 U 20080228 A-1 CHIPSEAL COMPANY 2 $834,834.00 100.79 STA060A-012 SH 60 US 85 WEST & SH 257 MILL 4 R 20080228 BRANNAN SAND AND GRAVEL, LLC 8 $1,881,174.62 77.10 STA 079A-011 SH40 / SH79, SH40 (309.26-311 1 R 20080306 APC SOUTHERN CONSTRUCTION COMPANY, LLC ALL BIDS REJECTED - CDOT OPTION STU 0251-329 S OF COLORADO CITY TO CEDARWOO 2 R 20080306 APC SOUTHERN CONSTRUCTION COMPANY, LLC 5 $16,752,092.55 110.84 STU 0251-329 S OF COLORADO CITY TO CEDARWOO 2 R 20080306 TETRA TECH CONSTRUCTION SERVICES, INC 3 $5,042,261.52 100.71 C 0702-274 FRISCO (MM 201) TO EAST VAIL ( 1 M 20080313 ASPHALT PAVING CO. 7 $972,690.70 82.94 STA 072A-030 SH 72, 64TH AVE TO 84TH PKWY 6 U 20080313 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $9,741,062.12 118.61 SHE0702-276 EAGLE COUNTY I-70 MP 171 TO MP 3 M 20080313 SIMON CONTRACTORS 6 $4,470,973.70 86.62 HB0132-017 SH13 WY STATE LINE SOUTH OVERL 3 M 20080320 BRANNAN SAND AND GRAVEL, LLC 6 $623,715.96 94.44 STA052A-029 ON SH 52 IN WELD COUNTY 4 R 20080320 ASPHALT SPECIALTIES CO., INC. 8 $4,526,967.75 93.50 IM0703-327 I-70 SILVERTHORNE TO EJMT 1 M 20080320 ARROW ELECTRIC SERVICE, INC. 8 $161,558.45 82.68 SRP083A-032 HIGHWAY 83 AND HODGEN IN EL PA 2 P 20080327 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $2,267,006.50 105.04 NH 1603-025 US 160 ALAMOSA MILL AND FILL 5 R 20080327 UNITED COMPANIES OF MESA COUNTY 2 $2,976,827.40 98.52 STA1251-006 WINDY GAP RES-GRAND COUNTY 3 M 20080327 AMERICAN WEST CONSTRUCTION, LLC 1 $239,531.50 96.25 BR 0403-051 US 40 MP 245.85 1 M 20080403 CASTLE ROCK CONST. CO. OF COLO, LLC 3 $17,300,345.31 98.19 NH 2871-031 US 287 SOUTH OF LAMAR FROM MP 2 R Colorado Department of Transportation 11:56 Friday, November 7, 2008 4 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080403 SCOTT CONTRACTING INC. 7 $2,287,435.80 100.84 C 1191-023 FROM MP 0.0 TO MP 2.6 GILPIN C 1 M 20080403 SEMA CONSTRUCTION, INC. 4 $26,692,000.00 104.53 NH 1602-114 US 160 4TH LANE THROUGH FARMIN 5 M 20080403 FLATIRON CONSTRUCTORS, INC. 2 $7,401,433.81 72.98 IM 0703-322 I-70 MM 213-215 1 M 20080410 EDWARD KRAEMER & SONS INC. 9 $29,407,999.45 115.98 IM 0252-383 DOUGLAS LANE TO 5TH STREET IN 1 R 20080410 Skanska USA 6 $8,236,859.30 93.75 NH5501-013 US 550 N OF NM STATE LINE, MP 5 R 20080410 INTERMOUNTAIN SLURRY SEAL, INC. 3 $1,424,425.00 98.18 STA3852-011 SH 385 IN PHILLIPS COUNTY 4 P 20080410 KIEWIT WESTERN CO 5 $1,047,059.00 107.41 C 067A-026 SH67 AND CR81 2 M 20080410 K.E.C.I. COLORADO, INC. 3 $750,374.30 105.87 SHE 0501-056 US 50 AND 28.5 RD IN GRAND JUN 3 U 20080417 LAFARGE WEST, INC 3 $3,969,728.35 117.48 STA 0343-026 ON US 34 IN YUMA COUNTY 4 P 20080417 A & S CONSTRUCTION CO. & AFFILIATED CO. 3 $2,237,574.90 133.70 NH 0503-064 US 50:15TH AND 16TH ST IN CANO 2 U 20080417 LAFARGE WEST, INC 6 $1,689,662.64 100.59 NH 030A-026 SH30 1ST AVE AT HAVANA ST TO P 6 R 20080417 QUALITY PAVING COMPANY 4 $1,532,512.79 92.66 IM 0704-207 I-70 FROM I-225 TO TOWER RD 6 U 20080417 LAWRENCE CONSTRUCTION CO. 5 $16,754,116.07 111.66 IM 0705-077 I70 WEST OF BURLINGTON EAST IN 1 P 20080424 CACTUS TRANSPORT, INC. 3 $1,097,998.85 102.59 NH 5502-059 US 550 DURANGO MP 24.183 NORTH 5 M 20080424 TRICON 2, LLC 4 $299,000.00 120.82 HB0403-052 US40 BERTHOUD PASS 3 M 20080430 HAYWARD BAKER, INC. 4 $2,983,703.00 44.21 IM 0702-281 I-70 IN DOWD CANYON 3 M 20080501 SCOTT CONTRACTING INC. 4 $1,895,895.95 105.95 STA 009A-001 SH 9 HOOSIER PASS NORTH - PHAS 1 M Colorado Department of Transportation 11:56 Friday, November 7, 2008 5 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080501 W.L. CONTRACTORS, INC. 7 $236,195.00 109.82 SHE 2854-114 SH 285-BRADEY CT. 6 U 20080501 ASPHALT SPECIALTIES CO., INC. LOW BID IS GREATER THAN 15% OVER ENG EST C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 1 M 20080501 ASPHALT PAVING CO. 3 $2,965,399.12 93.04 STA009A-025 SH9 FROM FAIRPLAY TO HARTSEL 1 M 20080508 POWER ENGINEERS, INC. 3 $871,503.58 154.78 EPSW00-541 DENVER AREA; SH 6, I-25, I-70 6 R 20080515 HIGHWAY TECHNOLOGIES 6 $908,005.02 83.49 SHE 0761-195 I-76: BURLINGTON CANAL TO BROM 6 R 20080515 IDEAL FENCING CORPORATION 5 $1,256,471.75 110.95 STA0703-334 I-70 FROM BAKERVILLE TO EAST 1 M 20080515 TRICON 2, LLC 7 $3,985,000.00 87.36 NH0504-056 US 50 PASSING LANES EAST OF 59 2 R 20080515 SCOTT CONTRACTING INC. 5 $344,563.80 96.10 STS 1151-021 SH 115 AT CR F45 IN FREMONT CO 2 R 20080522 ELAM CONSTRUCTION, INC. 3 $722,341.00 102.49 NH0063-024 US 6 EAGLE 3 M 20080522 KB CONSTRUCTION, INC 4 $380,168.94 89.13 C 090A-002 ON S.H. 90 FROM M.P. 10.6 TO M 5 M 20080605 LAWSON CONSTRUCTION COMPANY 3 $14,578,201.75 103.41 NH 1602-112 US 160 THROUGH BODO PARK 5 M 20080605 ASPHALT SPECIALTIES CO., INC. 3 $5,134,640.60 98.90 C0703-337 I-70 EMPIRE JCT. EAST OVERLAY 1 M 20080612 DKS ENTERPRISES INC. 2 $1,398,971.50 108.65 C0703-330 I-70 TWIN TUNNELS WESTBOUND 1 M 20080612 STURGEON ELECTRIC COMPANY, INC 2 $2,779,795.00 79.36 IM 070A-003 I 70 BETWEEN DENVER AND VAIL 1 M 20080619 KIEWIT WESTERN CO < 3 BIDDERS & LOW BID > 10% OVER ENG EST STA 0404-044 WEST COLFAX AVE. (US 40) FROM 6 R 20080619 SCOTT CONTRACTING INC. 6 $468,980.95 75.12 C119A-054 SH 119 FROM MP 6.5 TO MP 8.0 1 M 20080619 DURAN EXCAVATING, INC. 6 $314,002.50 110.33 SHE3921-008 SH 392 @ WCR 31(HES) 4 R Colorado Department of Transportation 11:56 Friday, November 7, 2008 6 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080626 CASTLE ROCK CONST. CO. OF COLO, LLC 9 $12,764,337.24 86.15 STA0342-037 U.S. 34 BUSINESS ROUTE FROM SH 4 R 20080626 INTERFACE COMMUNICATIONS, COMPANY 4 $173,142.00 103.84 SHE0091-033 SH9 SIGNAL INTERCONNECT 1 M 20080626 AMERICAN WEST CONSTRUCTION, LLC 5 $430,877.65 91.93 C 1601-060 US 160 MONTEZUMA COUNTY 5 R 20080626 AMERICAN WEST CONSTRUCTION, LLC 4 $847,878.00 104.82 C0702-275 I-70 VAIL PASS 3 M 20080626 INSITUFORM TECHNOLOGIES, INC. 3 $493,857.00 54.29 C0503-068 SH 50 PUEBLO CLUB MANOR - PIPE 2 U 20080626 DKS ENTERPRISES INC. 4 $293,322.15 101.34 STA086A-048 INTERSECTION OF SH 86 & COUNTY 1 R 20080626 KIEWIT WESTERN CO 3 $568,645.00 120.53 STA069A-024 SH 69 HUERFANO COUNTY 2 M 20080626 KIEWIT WESTERN CO 5 $953,926.22 89.22 STA 069A-023 SH 69 WESTCLIFFE AREA - CUSTER 2 M 20080627 J.L. WAGNER CONSTRUCTION, INC. 1 $844,309.75 100.00 C0402-073 US 40, WEST OF STEAMBOAT SPRI 3 R 20080710 AMERICAN CIVIL CONSTRUCTORS, INC. 3 $21,624,300.00 93.49 CR 600-275 I-70 VIADUCT - COLO. TO BRIGHT 6 U 20080710 NEW DESIGN CONSTRUCTION CO. 8 $2,011,980.45 92.24 STA0831-106 PARKER RD. (SH 83) MP 65.5 TO 6 R 20080710 COLORADO BORING. CO. 7 $328,730.00 82.93 STPR600-311 SH 72 FROM I-70 TO 86TH AVE 6 U 20080717 BRANNAN SAND AND GRAVEL, LLC 8 $939,122.93 77.11 STA 0404-044 WEST COLFAX AVE. (US 40) FROM 6 R 20080717 INTERFACE COMMUNICATIONS, COMPANY 5 $452,029.64 111.73 SHE 070A-005 I-70 B FROM PATTERSON (F RD.) 3 U 20080724 ZAK DIRT, INC. 10 $1,479,416.28 84.81 STA R400-147 ON SH 52 IN MORGAN COUNTY 4 P 20080724 SCOTT CONTRACTING INC. 5 $335,314.35 89.65 SHE0831-102 PARKER RD: LONG AVE INTERSECTI 1 R 20080724 INTERSTATE SEALANT & CONCRETE, INC. 3 $436,086.00 161.35 IM 0702-282 I-70 MP 118 TO 131 3 M Colorado Department of Transportation 11:56 Friday, November 7, 2008 7 2008 Cost Data PROJECTS BID FROM 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 20080731 SCOTT CONTRACTING INC. 6 $5,395,771.45 106.57 NH 2854-109 US 285: DEER CREEK INTERCHANGE 1 M 20080807 ELAM CONSTRUCTION, INC. < 3 BIDDERS & LOW BID > 10% OVER ENG EST NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 3 R 20080814 INTEGRATED ELECTRIC, INC. 5 $566,800.86 82.58 SHE R600-310 US285/FED, I-25/120TH, I-270/Q 6 U 20080821 TRICON 2, LLC 6 $197,500.00 98.80 NHC040-027 POWERS BLVD - FROM WOODMEN ROA 2 R 20080821 JALISCO INTERNATIONAL, INC. 7 $3,968,834.70 109.74 STU M193-001 ARAPAHOE ROAD AND (SH177) UNIV 6 U 20080828 AIS CONSTRUCTION COMPANY 3 $494,054.88 103.45 NH0503-065 3 MILES WEST OF COTOPAXI 2 M 20080904 AMERICAN WEST CONSTRUCTION, LLC 4 $331,891.50 76.77 BRS R200-154 I-25 MP 59.09, MP 65.6, MP 79. 2 R 20080911 TLM CONSTRUCTORS, INC. 6 $338,332.00 96.96 BR R400-206 VARIOUS LOCATIONS IN REGION 4. 4 P 20080911 UNITED COMPANIES OF MESA COUNTY 2 $1,014,918.90 108.94 NH 0501-057 ON US HWY 50 FROM MP. 38.0 TO 3 R 20080911 TRICON 2, LLC 5 $1,648,000.00 90.53 C0702-284 I-70 TRUCK PARKING AT DOTSERO 3 M 20081009 A & S CONSTRUCTION CO. & AFFILIATED CO. 5 $3,687,694.70 104.14 NH1601-058 ON US 160, FROM M.P. 21.40 TO 5 R 20081009 LAWRENCE CONSTRUCTION CO. 11 $10,913,172.50 81.51 C0252-390 I-25 FRONTAGE ROAD & 8-LANING 1 R 20081009 A & S CONSTRUCTION CO. & AFFILIATED CO. 2 $2,987,574.90 109.85 PLH 150A-007 INTERSECTION OF US 160 & SH 15 5 P 20081009 TEZAK HEAVY EQUIPMENT CO., INC. 9 $2,049,430.27 92.77 BRS120A-008 ON SH 120 AT MP 2.76 IN FREMON 2 R 20081009 IDEAL FENCING CORPORATION 4 $279,132.60 103.90 IMR600-322 I-25: COUNTY LINE RD TO BELLEV 6 R 20081016 TRICON 2, LLC 4 $1,083,000.00 106.68 SHE 0821-082 SH 82/SMITH WAY - PITKIN 3 M 20081016 HAMON CONTRACTORS, INC. 7 $2,712,914.95 86.93 BR 0361-088 US36 AND CHERRYVALE RD 4 R ======= ================ ====== TOTALS 539 $424,583,949.05 95.91 Colorado Department of Transportation 11:56 Friday, November 7, 2008 1 2008 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/08 THROUGH 10/31/08) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ BRIDGE REPAIR 080214 STA0252-397 U I25 NORTHGATE NORTH N/A 0.0420 38.0000 1.6 $125,412 $78,579.23 080228 IM0252-393 U DENVER - I-25 FROM SANTA FE DR F-16-DW 241.9000 58.9200 14252.7 $229,065 $16.07 F-16-DT 336.9100 58.9200 19850.7 $240,081 $12.09 F-16-EG 146.9900 206.0000 30279.9 $4,403 $0.15 080710 CR 600-275 U I-70 VIADUCT - COLO. TO BRIGHT E-17-FX 6390.0000 90.7500 579892.5 $17,363,657 $29.94 E-17-Z 1046.7333 35.9914 37673.4 $216,310 $5.74 WEIGHTED AVERAGE COST: NEW STRUCTURES 681950.9 $18,178,929 $26.66 CONCRETE SLAB AND GIRDER 080110 STUR200-110 P SH 16 ALIGNMENT FROM SH 85 TO J18-BA 104.1700 51.5000 5364.8 $182,621 $34.04 J-18-BM 220.5830 124.0000 27352.3 $2,350,643 $85.94 J-18-BN 372.1670 134.0000 49870.4 $3,646,382 $73.12 J-18-BO 217.6250 41.0000 8922.6 $992,878 $111.28 080124 STA 093A-007 U ON SH 93 IN BOULDER COUNTY E-16-AN 73.0000 84.0000 6132.0 $30,173 $4.92 080320 IM0703-327 M I-70 SILVERTHORNE TO EJMT F-12-P 70.0000 38.0000 2660.0 $6,273 $2.36 080410 IM 0252-383 R DOUGLAS LANE TO 5TH STREET IN G-17-DX & G-17-DY 252.6600 135.1667 34151.2 $2,557,107 $74.88 205.2500 94.0000 19293.5 $1,860,114 $96.41 081016 BR 0361-088 R US36 AND CHERRYVALE RD E-16-QT 289.2708 43.0000 12438.6 $1,388,638 $111.64 WEIGHTED AVERAGE COST: NEW STRUCTURES 166185.4 $13,014,827 $78.32 PRESTRES GIRDER (BOX SECTION) 081009 C0252-390 R I-25 FRONTAGE ROAD & 8-LANING N/A 120.0000 43.0000 5160.0 $912,249 $176.79 081009 BRS120A-008 R ON SH 120 AT MP 2.76 IN FREMON K-16-AM 238.5000 30.0000 7155.0 $1,178,711 $164.74 WEIGHTED AVERAGE COST: NEW STRUCTURES 12315.0 $2,090,960 $169.79 Colorado Department of Transportation 11:56 Friday, November 7, 2008 2 2008 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/08 THROUGH 10/31/08) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ PRESTRES GIRDER (TT SECTION) 080410 NH5501-013 R US 550 N OF NM STATE LINE, MP P-05-AH 57.1900 38.0000 2173.2 $455,173 $209.45 P-05-AI 150.5400 38.0000 5720.5 $1,162,923 $203.29 WEIGHTED AVERAGE COST: NEW STRUCTURES 7893.7 $1,618,096 $204.98 MAJOR STRUCTURE CBC OR PIPES 080724 STA R400-147 P ON SH 52 IN MORGAN COUNTY C-21-BR 125.8300 40.0000 5033.2 $516,840 $102.69 081009 C0252-390 R I-25 FRONTAGE ROAD & 8-LANING N/A 108.5000 13.5000 1464.8 $206,607 $141.05 WEIGHTED AVERAGE COST: NEW STRUCTURES 6498.0 $723,447 $111.33 FABRICATED STEEL GIRDER 080320 IM0703-327 M I-70 SILVERTHORNE TO EJMT F-12-X 554.0000 80.0000 44320.0 $71,323 $1.61 F-12-R 312.0000 42.0000 13104.0 $73,882 $5.64 WEIGHTED AVERAGE COST: NEW STRUCTURES 57424.0 $145,205 $2.53 ROLLED STEEL GIRDER 080117 IM 0252-392 U I-25, TOMAH ROAD TO DOUGLAS LA H-17-CQ 203.0000 120.0000 24360.0 $99,882 $4.10 080410 IM 0252-383 R DOUGLAS LANE TO 5TH STREET IN G-17-DZ & G-17-EA 175.0000 119.1667 20854.2 $1,973,015 $94.61 WEIGHTED AVERAGE COST: NEW STRUCTURES 45214.2 $2,072,897 $45.85 MISCELLANEOUS 080110 STUR200-110 P SH 16 ALIGNMENT FROM SH 85 TO J-18-I (WALL) 395.0000 2.0000 790.0 $151,554 $191.84 J-18-J (WALL) 130.0000 2.0000 260.0 $104,887 $403.41 080403 IM 0703-322 M I-70 MM 213-215 F-13-X 8959.0000 28.5000 255331.5 $7,401,434 $28.99 Colorado Department of Transportation 11:56 Friday, November 7, 2008 3 2008 Cost Data BRIDGE COST PER SQUARE FOOT (01/01/08 THROUGH 10/31/08) ------------------------------------------------------------------------------------------------------------------------------------ PROJECT NUMBER/ TERR/ TOTAL TOTAL COST PER DATE LET PROJECT LOCATION BRIDGE ID LENGTH WIDTH SQUARE FT COST SQUARE FOOT ------------------------------------------------------------------------------------------------------------------------------------ 081009 C0252-390 R I-25 FRONTAGE ROAD & 8-LANING G-17-L 230.0000 1.0000 230.0 $388,184 $1,687.76 G-17-N 480.0000 1.0000 480.0 $446,867 $930.97 0.0000 0.0000 0.0 $49,965 081016 SHE 0821-082 M SH 82/SMITH WAY - PITKIN G-08-C 113.0000 1.0000 113.0 $31,398 $277.85 G-08-L 120.0000 11.0000 1320.0 $83,998 $63.64 G-08-O 167.0000 1.0000 167.0 $89,525 $536.08 081016 BR 0361-088 R US36 AND CHERRYVALE RD E-16-BU 148.5000 2.0000 297.0 $52,778 $177.70 E-16-BV 192.7000 2.0000 385.4 $63,992 $166.04 E-16-BW 151.1000 2.0000 302.2 $56,108 $185.67 E-16-BX 197.6000 1.0000 197.6 $110,315 $558.28 WEIGHTED AVERAGE COST: NEW STRUCTURES 259873.7 $9,031,006 $34.75 Colorado Department of Transportation 11:56 Friday, November 7, 2008 1 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 201-00000 Clearing and Grubbing 20 Lump Sum 727,861.74 36,393.09 201-00001 Clearing and Grubbing 121 Acre 348,596.65 2,880.96 201-00005 Removal of Debris 1 Lump Sum 1,500.00 1,500.00 202-00000 Removal of Structures and Obstructions 5 Lump Sum 14,543.25 2,908.65 202-00001 Removal of Structure 68 Each 67,150.40 987.51 202-00002 Removal of Structure (Special) 5 Each 18,500.00 3,700.00 202-00008 Tree Trimming 10 Hour 1,748.00 174.80 202-00010 Removal of Tree 836 Each 145,851.46 174.46 202-00011 Tree Trimming 3 Each 3,007.71 1,002.57 202-00012 Removal of Tree Stump 250 Each 64,281.25 257.13 202-00015 Removal of Headwall 30 Each 18,868.00 628.93 202-00019 Removal of Inlet 71 Each 65,047.74 916.17 202-00021 Removal of Manhole 10 Each 9,957.38 995.74 202-00023 Removal of Embankment Protector Type 3 5 Each 9,540.00 1,908.00 202-00024 Removal of Embankment Protector Type 5 4 Each 2,230.00 557.50 202-00025 Removal of Ditch Lining 20 Lin Foot 1,000.00 50.00 202-00026 Removal of Slope and Ditch Paving 1,587 Sq Yard 14,915.94 9.40 202-00027 Removal of Riprap 125 Sq Yard 4,554.80 36.44 202-00033 Removal of Pipe 125 Each 126,358.92 1,010.87 202-00035 Removal of Pipe 12,671 Lin Foot 234,048.87 18.47 202-00037 Removal of End Section 59 Each 14,545.28 246.53 202-00090 Removal of Delineator 7,201 Each 52,610.98 7.31 202-00155 Removal of Wall 321 Lin Foot 29,856.50 93.01 202-00190 Removal of Concrete Median Cover Material 11,323 Sq Yard 104,266.10 9.21 202-00195 Removal of Median Cover 6,393 Sq Yard 40,968.78 6.41 202-00200 Removal of Sidewalk 6,695 Sq Yard 99,275.41 14.83 202-00201 Removal of Curb 42,521 Lin Foot 147,852.57 3.48 202-00202 Removal of Gutter 419 Lin Foot 7,110.51 16.97 202-00203 Removal of Curb and Gutter 60,958 Lin Foot 383,392.05 6.29 202-00206 Removal of Concrete Curb Ramp 1,562 Sq Yard 42,095.01 26.95 202-00210 Removal of Concrete Pavement 66,533 Sq Yard 455,983.32 6.85 202-00215 Removal of Concrete Pavement (Planing) 19,222 Sq Yard 175,881.30 9.15 202-00220 Removal of Asphalt Mat 468,641 Sq Yard 1,614,361.52 3.44 202-00226 Removal of Asphalt Mat (Special) 259,955 Sq Yard 264,730.37 1.02 202-00240 Removal of Asphalt Mat (Planing) 2,614,465 Sq Yard 5,539,392.06 2.12 202-00246 Removal of Asphalt Mat (Planing) (Special) 5,574 Sq Yard 125,554.02 22.52 202-00250 Removal of Pavement Marking 351,944 Sq Foot 429,969.53 1.22 202-00300 Removal Of Building(s) 2 Lump Sum 209,900.00 104,950.00 Colorado Department of Transportation 11:56 Friday, November 7, 2008 2 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00400 Removal of Bridge 13 Each 981,617.24 75,509.02 202-00420 Rem of Ped Rail 50 Lin Foot 787.00 15.74 202-00425 Removal of Bridge Railing 4,099 Lin Foot 43,939.18 10.72 202-00450 Removal of Portions of Present Structure (Class 1) 124 Sq Yard 27,006.55 217.79 202-00453 Removal of Portions of Present Structure (Class 2) 1,061 Sq Yard 208,770.00 196.77 202-00454 Removal of Portions of Present Structure (Class 2A) 53 Sq Yard 9,122.00 172.11 202-00456 Removal of Portions of Present Structure (Class 2B) 53 Sq Yard 9,512.00 179.47 202-00460 Removal of Portions of Present Structure (Class 3) 99 Sq Yard 41,930.35 423.54 202-00462 Removal of Portions of Present Structure (Class 3A) 11 Sq Yard 4,015.00 365.00 202-00480 Removal Of Portions Of Present Structure (Special) 3,793 Sq Yard 284,475.00 75.00 202-00495 Removal of Portions of Present Structure 7 Lump Sum 178,465.00 25,495.00 202-00500 Removal of Portions of Present Structure 8 Each 24,962.51 3,120.31 202-00502 Removal of Portions of Present Structure 169 Cubic Yard 7,780.00 46.04 202-00503 Removal of Portions of Present Structure 1,386 Sq Yard 2,370,375.46 1,710.23 202-00504 Removal of Expansion Device 2,512 Lin Foot 391,818.96 155.98 202-00700 Removal of Light Standard 27 Each 10,380.00 384.44 202-00725 Removal of Existing Lighting System 1 Lump Sum 36,600.00 36,600.00 202-00750 Removal of Luminaire 223 Each 44,640.00 200.18 202-00805 Removal of Overhead Sign Structure 2 Each 4,201.00 2,100.50 202-00810 Removal of Ground Sign 982 Each 73,485.13 74.83 202-00815 Removal of Sign (Special) 4 Each 992.34 248.09 202-00821 Removal of Sign Panel 257 Each 12,409.61 48.29 202-00825 Removal of Flashing Beacon 2 Each 270.00 135.00 202-00827 Removal of Pull Box 5 Each 306.52 61.30 202-00828 Removal of Traffic Signal Equipment 9 Lump Sum 43,264.90 4,807.21 202-00840 Removal of Traffic Signal Pole 31 Each 40,995.00 1,322.42 202-00842 Removal of Mast Arm 1 Each 685.00 685.00 202-00848 Removal of Traffic Signal Controller and Cabinet 2 Each 1,260.00 630.00 202-00855 Removal of Traffic Signal Controller Cabinet 1 Each 1,537.50 1,537.50 202-00858 Removal of Pedestal Pole 4 Each 1,475.00 368.75 202-00895 Removal of Impact Attenuator 7 Each 13,675.20 1,953.60 202-01000 Removal of Fence 253,613 Lin Foot 185,138.42 0.73 202-01010 Removal Of Silt Fence 750 Lin Foot 622.50 0.83 202-01030 Removal of Road Closure Gate 9 Each 2,959.02 328.78 202-01110 Removal of Guardrail Type 1 625 Lin Foot 2,187.50 3.50 202-01130 Removal of Guardrail Type 3 132,728 Lin Foot 326,676.67 2.46 202-01135 Removal of Guardrail Thrie Beam 599 Lin Foot 2,066.55 3.45 202-01140 Removal of Guardrail Type 4 47,071 Lin Foot 1,188,481.24 25.25 Colorado Department of Transportation 11:56 Friday, November 7, 2008 3 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-01170 Removal of Guardrail Type 7 165 Lin Foot 7,798.20 47.26 202-01200 Removal of Tensioned Cable Barrier 11,535 Lin Foot 17,999.50 1.56 202-01300 Removal of End Anchorage 308 Each 33,457.31 108.63 202-04001 Plug Culvert 56 Each 193,978.12 3,463.90 202-04002 Clean Culvert 108 Each 240,631.58 2,228.07 202-04003 Clean Culvert (Special) 81 Each 23,107.80 285.28 202-04004 Plug Culvert (Special) 1 Each 2,400.00 2,400.00 202-04005 Clean Valve Box 177 Each 15,718.48 88.80 202-04100 Abandon Well 2 Each 6,600.00 3,300.00 202-04300 Removal of Underground Storage Tank 2 Each 15,600.00 7,800.00 202-05008 Sawing Concrete (8 Inch) 7,839 Lin Foot 21,557.25 2.75 202-05010 Sawing Concrete (10 Inch) 135 Lin Foot 4,725.00 35.00 202-05019 Sawing Concrete (Special) 1,000 Lin Foot 15,000.00 15.00 202-05026 Sawing Asphalt Material (6 Inch) 49,856 Lin Foot 51,956.50 1.04 202-05030 Sawing Asphalt Material (10 Inch) 8,296 Lin Foot 24,888.00 3.00 202-05100 Sandblasting Reinforcing Steel 928 Sq Yard 13,288.00 14.32 202-05150 Sandblasting 164,837 Sq Foot 58,060.52 0.35 202-06000 Removal of Detour 1 Lump Sum 11,000.00 11,000.00 202-06520 Removal of Existing Wall Panels 1 Lump Sum 640,000.00 640,000.00 202-06530 Clean Drain Pipe (Special) 41 Each 3,642.00 88.83 203-00000 Unclassified Excavation 34,984 Cubic Yard 845,384.96 24.16 203-00010 Unclassified Excavation (Complete In Place) 922,859 Cubic Yard 6,994,021.35 7.58 203-00040 Unclassified Excavation (Special) 13,463 Cubic Yard 391,387.50 29.07 203-00060 Embankment Material (Complete In Place) 938,412 Cubic Yard 7,347,398.63 7.83 203-00061 Embankment Material (Complete In Place) 2,147 Ton 30,058.00 14.00 203-00062 Embankment Material (Complete In Place) (Special) 141,246 Cubic Yard 1,442,350.06 10.21 203-00100 Muck Excavation 21,459 Cubic Yard 318,374.00 14.84 203-00210 Borrow (Complete In Place) 1,134 Cubic Yard 23,814.00 21.00 203-00400 Rock Excavation 33,990 Cubic Yard 651,548.50 19.17 203-00510 Rock Fill (Special) 651 Cubic Yard 2,890.44 4.44 203-00592 Rock Staining 10,000 Sq Foot 19,300.00 1.93 203-00595 Rock Scaling 302 Sq Yard 8,456.00 28.00 203-00850 Expanded Polystyrene Fill (Complete In Place) 5,500 Cubic Yard 440,000.00 80.00 203-01100 Proof Rolling 979 Hour 95,842.25 97.90 203-01140 Rolling 388 Hour 38,317.80 98.76 203-01500 Blading 4,445 Hour 563,217.85 126.71 203-01510 Backhoe 1,228 Hour 181,046.25 147.43 203-01515 Backhoe (Landscaping) 4 Hour 560.00 140.00 Colorado Department of Transportation 11:56 Friday, November 7, 2008 4 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 203-01550 Dozing 1,087 Hour 151,934.00 139.77 203-01555 Dozing (Landscaping) 138 Hour 28,790.00 208.62 203-01565 Hydraulic Excavator 24 Hour 3,480.00 145.00 203-01582 Truck (Dump) 124 Hour 10,880.00 87.74 203-01590 Front End Loader (Rubber Tire) 583 Hour 71,219.95 122.16 203-01594 Combination Loader 1,443 Hour 165,155.20 114.45 203-01597 Potholing 2,128 Hour 446,524.10 209.83 203-01610 Crane (Rubber Tire) 50 Hour 23,000.00 460.00 203-01620 Sweeping 118 Hour 17,630.00 149.41 203-01622 Sweeping (With Pickup Broom) 820 Hour 112,040.40 136.63 203-02300 Rock Scaler 262 Hour 69,601.34 265.65 203-02330 Laborer 661 Hour 27,255.50 41.23 206-00000 Structure Excavation 86,677 Cubic Yard 654,632.40 7.55 206-00065 Structure Backfill (Flow-Fill) 11,845 Cubic Yard 978,731.44 82.63 206-00100 Structure Backfill (Class 1) 62,329 Cubic Yard 1,748,521.85 28.05 206-00200 Structure Backfill (Class 2) 3,271 Cubic Yard 60,111.63 18.38 206-00360 Mechanical Reinforcement of Soil 27,191 Cubic Yard 685,200.05 25.20 206-00505 Filter Material (Special) 604 Cubic Yard 25,992.00 43.03 206-00510 Filter Material (Class A) 185 Cubic Yard 12,930.00 69.89 206-00520 Filter Material (Class B) 2,464 Cubic Yard 133,770.00 54.29 206-01000 Bed Course Material 92 Cubic Yard 4,600.00 50.00 206-01750 Shoring 3 Lump Sum 55,750.92 18,583.64 206-01781 Shoring (Area 1) 7 Lump Sum 258,024.00 36,860.57 206-01782 Shoring (Area 2) 4 Lump Sum 150,000.00 37,500.00 206-01783 Shoring (Area 3) 1 Lump Sum 7,500.00 7,500.00 206-01784 Shoring (Area 4) 1 Lump Sum 40,000.00 40,000.00 206-01785 Shoring (Area 5) 1 Lump Sum 40,000.00 40,000.00 206-01786 Shoring (Area 6) 1 Lump Sum 7,500.00 7,500.00 206-01787 Shoring (Area 7) 1 Lump Sum 7,500.00 7,500.00 206-01788 Shoring (Area 8) 1 Lump Sum 500.00 500.00 206-01789 Shoring (Area 9) 1 Lump Sum 500.00 500.00 207-00205 Topsoil 180,788 Cubic Yard 951,349.97 5.26 207-00210 Stockpile Topsoil 86,369 Cubic Yard 217,656.35 2.52 207-00305 Wetland Topsoil 1,840 Cubic Yard 32,012.80 17.40 207-00310 Stockpile Wetland Topsoil 808 Cubic Yard 7,788.00 9.64 208-00002 Erosion Log (12 Inch) 178,145 Lin Foot 811,880.97 4.56 208-00003 Erosion Log (18 Inch) 5,250 Lin Foot 36,618.00 6.97 208-00004 Silt Berm 3,274 Lin Foot 31,210.32 9.53 Colorado Department of Transportation 11:56 Friday, November 7, 2008 5 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 208-00005 Erosion Log 46,523 Lin Foot 275,947.50 5.93 208-00007 Erosion Log (8 Inch) 1,980 Lin Foot 26,500.00 13.38 208-00010 Erosion Bales 314 Each 14,032.00 44.69 208-00011 Erosion Bales (Weed Free) 3,784 Each 61,561.62 16.27 208-00015 Sand Bag 220 Each 2,132.00 9.69 208-00018 Gravel Bag 280 Lin Foot 3,109.00 11.10 208-00020 Silt Fence 193,206 Lin Foot 287,976.15 1.49 208-00021 Silt Fence (Reinforced) 500 Lin Foot 1,300.00 2.60 208-00030 Sediment Basin 1 Each 2,200.00 2,200.00 208-00034 Gravel Bag 5,354 Lin Foot 51,159.00 9.56 208-00040 Check Dam 327 Each 45,732.50 139.85 208-00045 Concrete Washout Structure 233 Each 181,365.64 778.39 208-00050 Storm Drain Inlet Protection 492 Each 98,000.80 199.19 208-00051 Storm Drain Inlet Protection 2,053 Lin Foot 24,984.10 12.17 208-00055 Rigid Inlet Protection Device 5 Each 2,200.00 440.00 208-00060 Temporary Slope Drain 201 Lin Foot 8,814.20 43.85 208-00070 Stabilized Construction Entrance 192 Each 291,371.25 1,517.56 208-00100 Sediment Removal and Disposal 42 Lump Sum 194,494.86 4,630.83 208-00101 Sediment Removal and Disposal 310 Hour 30,357.00 97.93 208-00110 Sediment Removal and Disposal 1,055 Cubic Yard 29,378.40 27.85 208-00205 Erosion Control Supervisor 12,137 Hour 698,567.97 57.56 208-00206 Erosion Control Supervisor 2,218 Day 336,208.00 151.58 208-00300 Temporary Berms 8,100 Lin Foot 13,975.00 1.73 209-00000 Water 250 M Gallon 5,135.00 20.54 209-00600 Dust Palliative (Magnesium Chloride) 68,494 Gallon 94,775.80 1.38 210-00001 Reset Structure 3 Each 9,500.00 3,166.67 210-00007 Reset Wheel Stop 12 Each 600.00 50.00 210-00010 Reset Mailbox Structure 8 Each 3,825.00 478.13 210-00011 Reset Mailbox Structure (Type 1) 54 Each 10,073.15 186.54 210-00012 Reset Mailbox Structure (Type 2) 22 Each 4,941.93 224.63 210-00013 Reset Mailbox Structure (Type 3) 15 Each 4,349.73 289.98 210-00014 Reset Mailbox Structure (Type 4) 5 Each 1,325.00 265.00 210-00015 Reset End Section 2 Each 380.00 190.00 210-00035 Reset Water Meter 4 Each 3,280.00 820.00 210-00050 Reset Fire Hydrant 3 Each 7,200.00 2,400.00 210-00065 Reset Monument (Type 3A) 4 Each 2,167.43 541.86 210-00090 Reset Delineator 620 Each 55,897.00 90.16 210-00410 Modify Bridge Expansion Device 2 Each 11,330.00 5,665.00 Colorado Department of Transportation 11:56 Friday, November 7, 2008 6 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-00425 Reset Bridge Railing 325 Lin Foot 5,475.00 16.85 210-00427 Reset Pipe Handrailing 8,405 Lin Foot 235,340.00 28.00 210-00440 Repair Curb 67 Lin Foot 5,517.45 82.35 210-00473 Reset TV Cameras 14 Each 37,180.00 2,655.71 210-00475 Reset Closed Circuit Television Pole 1 Each 1,530.00 1,530.00 210-00510 Rebuild Portions of Present Structure 4 Lump Sum 51,374.95 12,843.74 210-00520 Rebuild Portions of Present Structure 2 Sq Yard 4,443.60 2,221.80 210-00750 Reset Light Standard 72 Each 166,638.70 2,314.43 210-00760 Reset Luminaire 128 Each 334,080.00 2,610.00 210-00805 Reset Overhead Sign Structure 1 Each 11,500.00 11,500.00 210-00810 Reset Ground Sign 616 Each 120,943.62 196.34 210-00815 Reset Sign Panel 378 Each 12,166.05 32.19 210-00825 Reset Flashing Beacon 7 Each 10,891.90 1,555.99 210-00827 Reset Pull Box 4 Each 1,500.00 375.00 210-00830 Reset Traffic Signal Face 4 Each 726.00 181.50 210-00831 Reset Traffic Signal Head 8 Each 2,304.00 288.00 210-00848 Reset Traffic Signal Controller and Cabinet 5 Each 12,760.00 2,552.00 210-00860 Reset Pedestrian Push Button 2 Each 180.00 90.00 210-00865 Reset Pedestrian Signal Head 2 Each 410.00 205.00 210-00866 Reset Fire Preemption Unit and Timer 14 Each 8,978.00 641.29 210-00870 Reset Coordination Unit 2 Each 12,230.00 6,115.00 210-00890 Reset Intersection Detection System (Camera) 3 Each 3,400.00 1,133.33 210-00910 Reset Traffic Counter (Permanent) 1 Each 3,700.00 3,700.00 210-01000 Reset Fence 1,512 Lin Foot 5,982.80 3.96 210-01011 Reset Gate 6 Each 3,292.13 548.69 210-01050 Reset Chain Link Fence 80 Lin Foot 2,240.00 28.00 210-01130 Reset Guardrail Type 3 35,683 Lin Foot 411,523.35 11.53 210-01136 Reset Guardrail Type 3 (Double) 5,125 Lin Foot 71,750.00 14.00 210-01140 Reset Guardrail Type 4 1,350 Lin Foot 17,077.50 12.65 210-01200 Reset End Anchorage 68 Each 20,020.00 294.41 210-01300 Reset Impact Attenuator 6 Each 15,300.00 2,550.00 210-01700 Reset Sprinkler Head 4 Each 420.00 105.00 210-01710 Reset Valve 1 Each 1,900.00 1,900.00 210-01720 Reset Air Vent 3 Each 3,900.00 1,300.00 210-02024 Relay Pipe (24 Inch) 125 Lin Foot 3,843.75 30.75 210-02048 Relay Pipe (48 Inch) 170 Lin Foot 6,621.50 38.95 210-02900 Relay Riprap 57 Cubic Yard 1,559.10 27.35 210-03100 Replace Concrete Pavement 2,005 Sq Yard 439,320.00 219.11 Colorado Department of Transportation 11:56 Friday, November 7, 2008 7 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 210-04000 Adjust Structure 17 Each 16,474.00 969.06 210-04010 Adjust Manhole 363 Each 190,352.90 524.39 210-04011 Adjust Manhole (Special) 8 Each 5,560.40 695.05 210-04015 Modify Manhole 16 Each 23,499.12 1,468.70 210-04016 Modify Manhole (Special) 2 Each 5,200.00 2,600.00 210-04020 Modify Inlet 62 Each 185,197.43 2,987.06 210-04025 Modify Structure 2 Each 5,486.00 2,743.00 210-04030 Modify Guardrail 31,415 Lin Foot 116,866.30 3.72 210-04050 Adjust Valve Box 493 Each 150,673.46 305.63 210-04060 Adjust Water Meter 1 Each 820.00 820.00 210-04070 Adjust Well 6 Each 6,600.00 1,100.00 210-04200 Adjust Guardrail 57,168 Lin Foot 141,649.20 2.48 211-00100 Drilling Hole 2,074 Lin Foot 122,964.00 59.29 211-01111 Rock Reinforcement (Dowels) 200 Lin Foot 14,000.00 70.00 211-01115 Rock Reinforcement (Number 10) 598 Lin Foot 60,421.92 101.04 211-03005 Dewatering 1 Lump Sum 134,000.00 134,000.00 212-00006 Seeding (Native) 702 Acre 360,057.95 512.90 212-00007 Seeding (Native) (Hydraulic) 1 Acre 1,000.00 1,000.00 212-00009 Seeding (Temporary) 22 Acre 5,343.25 242.88 212-00028 Seeding (Wetlands) 1 Acre 735.25 735.25 212-00032 Soil Conditioning 387 Acre 765,412.10 1,977.81 212-00050 Sod 2,327 Sq Foot 5,817.50 2.50 213-00002 Mulching (Weed Free Hay) 481 Acre 235,232.77 489.05 213-00003 Mulching (Weed Free) 315 Acre 104,419.75 331.49 213-00004 Mulching (Weed Free Straw) 87 Acre 52,034.07 598.09 213-00005 Mulching (Decorative) 1,758 Cubic Foot 11,427.00 6.50 213-00008 Mulching (Wood Chip) 80 Cubic Foot 200.00 2.50 213-00009 Flexible Growth Medium 8 Acre 27,240.00 3,405.00 213-00011 Mulching (Hydraulic) 3 Acre 4,000.00 1,333.33 213-00061 Mulch Tackifier 179,557 Pound 361,264.90 2.01 213-00100 Soil Binder 101 Acre 48,664.72 481.83 213-00460 Metal Landscape Border (3/16x4 Inch) 603 Lin Foot 2,653.20 4.40 213-00462 Metal Landscape Border (3/16 X 5-1/2 Inch) 526 Lin Foot 4,734.00 9.00 213-00700 Landscape Boulder 212 Each 31,800.00 150.00 214-00000 Landscape Maintenance 5 Lump Sum 58,750.00 11,750.00 214-00205 Deciduous Tree (5 Gallon Container) 230 Each 9,200.00 40.00 214-00215 Deciduous Tree (1.5 Inch Caliper) 27 Each 8,550.00 316.67 214-00220 Deciduous Tree (2 Inch Caliper) 59 Each 20,397.50 345.72 Colorado Department of Transportation 11:56 Friday, November 7, 2008 8 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 214-00350 Deciduous Shrub (5 Gallon Container) 1,366 Each 42,470.75 31.09 214-00506 Evergreen Tree (6 Foot) (Ball and Burlap) 47 Each 14,828.00 315.49 214-00650 Evergreen Shrub (5 Gallon Container) 6 Each 2,760.00 460.00 214-01010 Brush Layer Cutting 4,370 Each 15,842.50 3.63 215-00000 Transplant Shrub 41 Each 2,320.00 56.59 215-00010 Transplant Tree 21 Each 12,900.00 614.29 215-00600 Transplant Plug 425 Each 14,074.50 33.12 216-00015 Soil Retention Blanket (Excelsior) 7,194 Sq Yard 15,942.00 2.22 216-00021 Soil Retention Blanket (Class 1) 23,153 Sq Yard 40,350.10 1.74 216-00022 Soil Retention Blanket (Class 2) 7,882 Sq Yard 42,483.98 5.39 216-00023 Soil Retention Blanket (Class 3) 938 Sq Yard 5,684.00 6.06 216-00035 Soil Retention Blanket (Plastic) 1,778 Sq Yard 13,718.50 7.72 216-00037 Soil Retention Blanket (Coconut) 244 Sq Yard 891.00 3.65 216-00039 Soil Retention Blanket (Straw) 23,390 Sq Yard 37,059.80 1.58 216-00041 Soil Retention Blanket (Straw/Coconut) 239,091 Sq Yard 467,127.54 1.95 216-00045 Soil Retention Mat (Cellular) 2,080 Sq Yard 18,720.00 9.00 216-00070 Geocell Cellular Confinement System 1,084 Sq Yard 27,100.00 25.00 217-00000 Herbicide Treatment 1,600 Sq Yard 610.00 0.38 217-00020 Herbicide Treatment 204 Hour 19,400.00 95.10 218-00000 Noxious Weed Management 1 Lump Sum 5,000.00 5,000.00 250-00010 Environmental Health and Safety Management 8 Lump Sum 59,038.25 7,379.78 250-00050 Monitoring Technician 218 Hour 23,231.60 106.57 250-00110 Health and Safety Officer 196 Hour 26,640.00 135.92 250-00120 Material Sampling and Delivery 49 Each 12,520.00 255.51 250-00200 Material Handling (Stockpile) 276 Cubic Yard 10,000.00 36.23 250-00210 Solid Waste Disposal 171 Cubic Yard 10,600.00 61.99 250-00220 Hazardous Waste Disposal 21,406 Cubic Yard 1,187,250.00 55.46 250-00310 Water Treatment 60 M Gallon 31,800.00 530.00 304-01000 Aggregate Base Course (Class 1) 61,464 Ton 1,035,576.00 16.85 304-01005 Aggregate Base Course (Class 1) 16 Cubic Yard 1,600.00 100.00 304-02000 Aggregate Base Course (Class 2) 85,822 Ton 1,231,614.82 14.35 304-03000 Aggregate Base Course (Class 3) 3,637 Ton 116,420.37 32.01 304-03005 Aggregate Base Course (Class 3) 7,280 Cubic Yard 255,600.80 35.11 304-04000 Aggregate Base Course (Class 4) 4,366 Ton 53,289.00 12.21 304-05000 Aggregate Base Course (Class 5) 279 Ton 15,624.00 56.00 304-06000 Aggregate Base Course (Class 6) 190,157 Ton 3,545,692.67 18.65 304-06007 Aggregate Base Course (Class 6) 58,658 Cubic Yard 1,382,740.21 23.57 304-06008 Aggregate Base Course (Class 6) (Special) 12,903 Cubic Yard 295,809.12 22.93 Colorado Department of Transportation 11:56 Friday, November 7, 2008 9 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 304-06009 Aggregate Base Course (Class 6) (Special) 5,998 Ton 110,663.10 18.45 304-07000 Aggregate Base Course (Class 7) 15,096 Ton 364,887.80 24.17 304-07005 Aggregate Base Course (Class 7) 17,034 Cubic Yard 176,349.84 10.35 304-07009 Aggregate Base Course (Class 7) (Special) 982 Ton 982.00 1.00 304-09000 Aggregate Base Course (Special) 6,895 Cubic Yard 99,694.00 14.46 304-09014 Aggregate Base Course (Special) 64,106 Ton 1,245,573.99 19.43 304-09055 Aggregate Base Course (Blotter Material) 65 Ton 1,030.00 15.85 306-01000 Reconditioning 3,451 Sq Yard 20,706.00 6.00 307-00000 Hydrated Lime 2,008 Ton 302,292.25 150.54 307-00075 Fly Ash 470 Ton 37,600.00 80.00 307-00250 Processing Fly Ash Treated Subgrade 11,496 Sq Yard 21,842.40 1.90 310-00608 Full Depth Reclamation of Hot Mix Asphalt Pavement (0 105,150 Sq Yard 189,033.72 1.80 310-00610 Full Depth Reclamation of Hot Mix Asphalt Pavement (8 113,452 Sq Yard 277,986.30 2.45 310-00614 Full Depth Reclamation Of Hot Mix Asphalt Pavement (1 54,554 Sq Yard 294,764.40 5.40 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 16,175 Ton 2,189,634.28 135.37 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 13,274 Sq Yard 643,384.75 48.47 403-00800 Emergency Pothole Repair 160 Ton 15,417.10 96.36 403-05000 Hot Mix Asphalt (Reflective Crack Interlayer) 12,232 Ton 1,565,696.00 128.00 403-09210 Stone Matrix Asphalt 118,387 Ton 8,442,819.64 71.32 403-09221 Stone Matrix Asphalt (Fibers)(Asphalt) 54,596 Ton 3,349,448.12 61.35 403-09500 Furnish Hot Bituminous Pavement 37,955 Ton 2,813,940.24 74.14 403-33721 Hot Bituminous Pavement (Grading S) (75) (PG 58-28) 3,144 Ton 235,800.00 75.00 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 38,294 Ton 2,608,387.56 68.11 403-33751 Hot Bituminous Pavement (Grading S) (75) (PG 64-28) 13,341 Ton 869,103.90 65.15 403-33841 Hot Bituminous Pavement (Grading S) (100) (PG 64-22) 74,299 Ton 3,769,578.00 50.74 403-34701 Hot Bituminous Pavement (Grading SX) (75) 274,873 Ton 12,119,521.31 44.09 403-34721 Hot Bituminous Pavement (Grading SX) (75) (PG 58-28) 148,059 Ton 9,659,026.45 65.24 403-34741 Hot Bituminous Pavement (Grading SX) (75) (PG 64-22) 27,780 Ton 2,053,444.88 73.92 403-34751 Hot Bituminous Pavement (Grading SX) (75) (PG 64-28) 41,066 Ton 2,043,177.92 49.75 403-34801 Hot Bituminous Pavement (Grading SX) (100) 39,828 Ton 1,943,157.00 48.79 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 112,463 Ton 6,305,325.54 56.07 403-34851 Hot Bituminous Pavement (Grading SX) (100) (PG 64-28) 248,864 Ton 14,180,702.60 56.98 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 225,749 Ton 13,531,346.98 59.94 403-36400 Hot Bituminous Pavement (Grading SX) (75) 40,815 Ton 2,163,195.00 53.00 405-00000 Heating and Scarifying Treatment 309,881 Sq Yard 712,726.30 2.30 405-00100 Heating and Remixing Treatment 1,234,256 Sq Yard 6,932,788.03 5.62 405-00101 Heating and Remixing Treatment (Special) 184,895 Sq Yard 1,444,029.95 7.81 405-00300 Heating and Repaving Treatment 275,913 Sq Yard 827,739.00 3.00 Colorado Department of Transportation 11:56 Friday, November 7, 2008 10 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 406-09500 Cold Bituminous Pavement (Recycle) 211,623 Sq Yard 534,930.00 2.53 406-09505 Cold Bituminous Pavement (Recycle)(Special) 257,547 Sq Yard 659,320.32 2.56 408-01000 Hot Poured Joint and Crack Sealant 56 Ton 35,696.77 637.44 408-01400 Crack Sealant (Special) 51 Ton 190,536.00 3,736.00 409-01010 Cover Coat Material (Type I) 5,644 Ton 84,660.00 15.00 409-01015 Cover Coat Material (Type I) 571,171 Sq Yard 392,214.47 0.69 409-02015 Cover Coat Material (Type II) 248,421 Sq Yard 124,210.50 0.50 409-02030 Cover Coat Material (Type I) Special 758,285 Sq Yard 1,101,525.45 1.45 411-03342 Asphalt Cement Performance Grade (PG 64-28) 5,486 Ton 2,924,731.40 533.13 411-03345 Asphalt Cement Performance Grade (PG 76-28) 1,904 Ton 920,475.00 483.44 411-03352 Asphalt Cement Performance Grade (PG 58-28) 2,307 Ton 1,043,535.88 452.33 411-03354 Asphalt Cement Performance Grade (PG 64-22) 1,241 Ton 889,905.76 717.09 411-03355 Asphalt Cement Performance Grade (PG 58-34) 14,767 Ton 7,703,730.45 521.69 411-10216 Emulsified Asphalt (CRS-2P) 181,380 Gallon 576,788.40 3.18 411-10253 Emulsified Asphalt (CSS-1H) 19,354 Gallon 37,958.00 1.96 411-10255 Emulsified Asphalt (Slow-Setting) 532,900 Gallon 1,209,112.63 2.27 411-10258 Emulsified Asphalt (Rapid-Setting)(Polymerized) 1,605 Ton 419,054.00 261.09 411-10261 Emulsified Asphalt (Rapid-Setting-2P)(Polymerized) 143,608 Gallon 193,870.80 1.35 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 310,779 Gallon 677,553.55 2.18 411-10300 Emulsified Asphalt (Prime Coat) 48,422 Gallon 121,704.38 2.51 411-21020 Liquid Asphaltic Material (MC-70) 8,202 Gallon 29,527.20 3.60 411-90010 Asphalt Rejuvenating Agent 184,864 Gallon 581,816.02 3.15 411-90040 Recycling Agent 939,770 Gallon 2,192,018.04 2.33 412-00600 Concrete Pavement (6 Inch) 6,218 Sq Yard 360,416.00 57.96 412-00605 Concrete Pavement (6 Inch) (Fast Track) 240 Sq Yard 10,972.80 45.72 412-00850 Concrete Pavement (8-1/2 Inch) 117,058 Sq Yard 3,952,995.00 33.77 412-00900 Concrete Pavement (9 Inch) 198,891 Sq Yard 4,816,248.36 24.22 412-00920 Concrete Pavement (9 Inch) (Fast Track) 12,016 Sq Yard 465,853.64 38.77 412-00950 Concrete Pavement (9-1/2 Inch) 27,599 Sq Yard 938,366.00 34.00 412-01000 Concrete Pavement (10 Inch) 14,262 Sq Yard 660,171.00 46.29 412-01020 Concrete Pavement (10 Inch) (Fast Track) 12,313 Sq Yard 868,380.00 70.53 412-01025 Concrete Pavement (10-1/4 Inch) 130,433 Sq Yard 5,114,198.35 39.21 412-01035 Concrete Pavement (10 1/4 Inch)(Fast Track) 5,000 Sq Yard 325,000.00 65.00 412-01050 Concrete Pavement (10-1/2 Inch) 81,187 Sq Yard 3,333,534.99 41.06 412-01060 Concrete Pavement (10-1/2 Inch) (Fast Track) 335 Sq Yard 23,282.50 69.50 412-01100 Concrete Pavement (11 Inch) 333,747 Sq Yard 10,219,749.31 30.62 412-01120 Concrete Pavement (11 Inch) (Fast Track) 970 Sq Yard 114,178.00 117.71 412-01125 Concrete Pavement (11-1/4 Inch) 53,818 Sq Yard 2,433,111.78 45.21 Colorado Department of Transportation 11:56 Friday, November 7, 2008 11 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 412-01150 Concrete Pavement (11-1/2 Inch) 3,201 Sq Yard 192,060.00 60.00 412-01200 Concrete Pavement (12 Inch) 62,581 Sq Yard 2,380,438.84 38.04 412-01215 Concrete Pavement (12 Inch) (Reinforced) 676 Sq Yard 37,180.00 55.00 412-01220 Concrete Pavement (12 Inch) (Fast Track) 2,340 Sq Yard 280,800.00 120.00 412-01250 Concrete Pavement (12-1/2 Inch) 103,698 Sq Yard 4,676,914.80 45.10 412-14000 Sawing and Sealing Concrete Pavement Joints 116,000 Lin Foot 203,000.00 1.75 412-15000 Routing and Sealing Concrete Pavement Cracks 420 Lin Foot 2,226.00 5.30 412-15010 Cleaning and Grouting Concrete Pavement Joint 500 Lin Foot 2,500.00 5.00 412-15050 Cross Stitching 900 Each 41,400.00 46.00 412-18050 Rubblization of Concrete Pavement 321,092 Sq Yard 1,139,876.60 3.55 412-19000 Hot Poured Concrete Joint Sealant 1,500 Lin Foot 29,565.00 19.71 420-00100 Geotextile (Erosion Control) (Class A) 30,949 Sq Yard 84,085.01 2.72 420-00101 Geotextile (Erosion Control) (Class B) 1,940 Sq Yard 14,500.00 7.47 420-00110 Geotextile (Drainage) (Class A) 18,345 Sq Yard 46,483.34 2.53 420-00111 Geotextile (Drainage) (Class B) 374 Sq Yard 1,709.18 4.57 420-00130 Geotextile (Separator) (Class A) 136,320 Sq Yard 239,717.56 1.76 420-00131 Geotextile (Separator) (Class B) 238 Sq Yard 2,380.00 10.00 420-00200 Geotextile (Weed Barrier) 959 Sq Yard 43,374.00 45.23 420-00500 Geotextile (Paving) 10,455 Sq Yard 26,697.95 2.55 501-00000 Steel Sheet Piling (Type I) 720 Sq Foot 33,991.20 47.21 502-00100 Drilling Hole to Facilitate Pile Driving 1,794 Lin Foot 279,760.00 155.94 502-00460 Pile Tip 294 Each 39,283.20 133.62 502-01000 Bitumen Coating 352 Lin Foot 8,800.00 25.00 502-11253 Steel Piling (HP 12x53) 4,649 Lin Foot 274,207.00 58.98 502-11274 Steel Piling (HP 12x74) 1,489 Lin Foot 115,740.00 77.73 502-11284 Steel Piling (HP 12x84) 334 Lin Foot 18,370.00 55.00 502-11489 Steel Piling (HP 14x89) 7,458 Lin Foot 438,774.56 58.83 503-00018 Drilled Caisson (18 Inch) 306 Lin Foot 60,541.04 197.85 503-00024 Drilled Caisson (24 Inch) 2,579 Lin Foot 372,877.42 144.58 503-00030 Drilled Caisson (30 Inch) 1,565 Lin Foot 254,400.00 162.56 503-00036 Drilled Caisson (36 Inch) 1,052 Lin Foot 261,665.90 248.73 503-00042 Drilled Caisson (42 Inch) 768 Lin Foot 188,815.35 245.85 503-00048 Drilled Caisson (48 Inch) 1,467 Lin Foot 433,711.86 295.65 503-00054 Drilled Caisson (54 Inch) 458 Lin Foot 198,722.01 433.89 503-00060 Drilled Caisson (60 Inch) 120 Lin Foot 48,000.00 400.00 504-04410 Block Facing 33,153 Sq Foot 394,606.76 11.90 504-04420 Precast Panel Facing 44,845 Sq Foot 1,475,292.00 32.90 504-04430 Reinforced Concrete Facing 16,000 Sq Foot 612,000.00 38.25 Colorado Department of Transportation 11:56 Friday, November 7, 2008 12 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 504-06310 Ground Nail (10 Foot) 118 Each 47,010.00 398.39 504-06315 Ground Nail (15 Foot) 179 Each 101,995.00 569.80 504-06320 Ground Nail (20 Foot) 304 Each 227,816.00 749.39 504-06325 Ground Nail (25 Foot) 136 Each 95,200.00 700.00 504-06330 Ground Nail (30 Foot) 110 Each 91,300.00 830.00 504-08255 Masonry Landscape Wall (Dry Stack) 4,780 Sq Foot 109,190.00 22.84 506-00000 Riprap 210 Cubic Yard 17,850.00 85.00 506-00010 Riprap (Special) 15,490 Cubic Yard 731,959.15 47.25 506-00013 Riprap (Special) 9,405 Ton 794,709.75 84.50 506-00030 Grouted Riprap 527 Cubic Yard 78,724.50 149.38 506-00206 Riprap (6 Inch) 883 Cubic Yard 68,596.40 77.69 506-00209 Riprap (9 Inch) 3,335 Cubic Yard 238,171.54 71.42 506-00212 Riprap (12 Inch) 2,503 Cubic Yard 189,678.54 75.78 506-00218 Riprap (18 Inch) 1,587 Cubic Yard 122,615.50 77.26 506-00224 Riprap (24 Inch) 24,722 Cubic Yard 1,227,450.60 49.65 506-00230 Riprap (30 In) 340 Cubic Yard 61,288.40 180.26 506-00236 Riprap (36 Inch) 80 Cubic Yard 20,560.00 257.00 506-01020 Geogrid Reinforcement 22,648 Sq Yard 81,138.19 3.58 507-00000 Concrete Slope and Ditch Paving 600 Cubic Yard 215,950.94 359.92 507-00100 Concrete Slope and Ditch Paving (Reinforced) 1,121 Cubic Yard 488,049.88 435.37 507-00400 Bituminous Slope and Ditch Paving (Asphalt) 805 Ton 147,941.56 183.78 509-00000 Structural Steel 580,186 Pound 958,151.00 1.65 509-00001 Structural Steel (Galvanized) 1,901 Pound 4,562.40 2.40 509-00010 Structural Steel (Special) 67,830 Pound 176,358.00 2.60 509-08100 Provide Temporary Support 2 Lump Sum 2,386,500.00 1,193,250.00 509-08120 Temporary Bridge Deck 7,751 Sq Foot 883,323.80 113.96 509-90002 Paint Existing Structure (Special) 10 Gallon 4,000.00 400.00 510-20100 Structural Plate Arch (Special) 27 Lin Foot 14,850.00 550.00 512-00101 Bearing Device (Type I) 139 Each 109,850.00 790.29 513-00600 Bridge Drain 6 Each 65,360.00 10,893.33 513-00690 Bridge Drain (Special) 78 Each 373,898.84 4,793.57 514-00000 Pipe Railing 147 Lin Foot 19,204.25 130.64 514-00100 Hand Rail 216 Lin Foot 47,725.00 220.95 514-00200 Pedestrian Railing (Steel) 951 Lin Foot 111,183.00 116.91 515-00120 Waterproofing (Membrane) 22,389 Sq Yard 344,990.97 15.41 515-00400 Concrete Sealer 28,429 Sq Yard 226,326.21 7.96 515-00410 Concrete Sealer (Calcium Nitrite) 7,611 Sq Yard 165,194.27 21.70 518-00100 Waterstop 682 Lin Foot 4,242.04 6.22 Colorado Department of Transportation 11:56 Friday, November 7, 2008 13 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 518-01001 Bridge Expansion Joint (Asphaltic Plug) 60 Lin Foot 9,270.60 154.51 518-01002 Bridge Expansion Device (0-2 Inch) 1,961 Lin Foot 247,188.00 126.05 518-01004 Bridge Expansion Device (0-4 Inch) 3,656 Lin Foot 979,360.66 267.88 518-01005 Bridge Expansion Device (0-4 Inch)(with Snow Plow Pla 343 Lin Foot 80,480.00 234.64 518-02010 Elastomeric Concrete End Dam 4 Cubic Foot 6,600.00 1,650.00 518-02100 Polymer Mortar End Dam 301 Cubic Foot 169,577.88 563.38 518-03000 Sawing and Sealing Bridge Joint 2,806 Lin Foot 57,414.72 20.46 518-03100 Rapid Cure Silicone Joint Seal 700 Lin Foot 36,576.36 52.25 519-01000 Epoxy Resin (Injection) 1,465 Lin Foot 141,860.00 96.83 519-01200 Epoxy Mortar (Patching) 24 Cubic Foot 8,796.60 366.53 519-03000 Thin Bonded Epoxy Overlay 1,557 Sq Yard 68,757.12 44.16 601-01000 Concrete Class B 1,457 Cubic Yard 788,420.80 541.13 601-01025 Concrete Class B (Miscellaneous) 73 Cubic Yard 29,908.38 409.70 601-01050 Concrete Class B (Wall) 129 Cubic Yard 92,452.76 716.69 601-03000 Concrete Class D 292 Cubic Yard 169,615.00 580.87 601-03020 Concrete Class D (Miscellaneous) 13 Cubic Yard 22,836.00 1,756.62 601-03030 Concrete Class D (Box Culvert) 4,023 Cubic Yard 1,523,060.30 378.59 601-03040 Concrete Class D (Bridge) 12,041 Cubic Yard 5,212,648.92 432.91 601-03041 Concrete Class D (Bridge) (Special) 819 Cubic Yard 1,174,645.00 1,434.24 601-03050 Concrete Class D (Wall) 1,070 Cubic Yard 510,850.00 477.43 601-03540 Concrete Class DT (Deck Topping) 19 Cubic Yard 31,464.68 1,656.04 601-04000 Concrete Class E 43 Cubic Yard 44,075.00 1,025.00 601-05000 Concrete Class H 3,542 Cubic Yard 1,580,520.20 446.22 601-06100 Concrete (Patching) 144 Cubic Yard 318,963.00 2,215.02 601-06150 Concrete (Patching) 6,330 Sq Foot 321,984.62 50.87 601-06300 Cement Grout 4,800 Cubic Foot 180,000.00 37.50 601-21004 Precast Wall Segment (Furnish Only 3,513 Sq Foot 70,786.95 20.15 601-25900 Tile-Faced Precast Concrete Panels 203,554 Sq Foot 5,717,831.86 28.09 601-40100 Concrete Anchor 410 Each 19,475.00 47.50 601-40250 Bridge Deck Finish (Sawed Grooves) 5,626 Sq Yard 25,317.00 4.50 601-40300 Structural Concrete Coating 9,815 Sq Yard 74,135.10 7.55 601-40301 Structural Concrete Coating 37,887 Sq Foot 51,608.94 1.36 601-40302 Structural Concrete Coating (Anti-Graffiti) 3,067 Sq Foot 24,536.00 8.00 601-40400 Structural Concrete Stain 19,007 Sq Yard 107,618.75 5.66 601-40401 Structural Concrete Stain 2,964 Sq Foot 4,446.00 1.50 602-00000 Reinforcing Steel 1,450,416 Pound 1,731,546.33 1.19 602-00020 Reinforcing Steel (Epoxy Coated) 3,234,050 Pound 3,194,545.12 0.99 602-00030 Reinforcing (Fiber Reinforced Polymer)(Surface) 9 M Kip Foot 32,199.62 3,577.74 Colorado Department of Transportation 11:56 Friday, November 7, 2008 14 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 602-00060 Reinforcing Steel Splice 2,590 Each 771,820.00 298.00 602-00070 Reinf (Fiber Reinforcement)(Surface) 43 M Kip Foot 90,300.00 2,100.00 603-00001 Annular Space Grouting 85 Cubic Yard 27,625.00 325.00 603-00040 Culvert Lining (40 Inch) 270 Lin Foot 52,650.00 195.00 603-00049 Culvert Lining (48 Inch)(Special) 384 Lin Foot 142,080.00 370.00 603-00053 Prepare Culvert Pipe (54 Inch) 1,943 Lin Foot 19,430.00 10.00 603-00054 Culvert Lining (54 Inch) 1,943 Lin Foot 429,403.00 221.00 603-00061 Prepare Culvert Pipe (60 Inch) 250 Lin Foot 46,250.00 185.00 603-00062 Culvert Lining (60 Inch)(Special) 94 Lin Foot 57,810.00 615.00 603-00072 Culvert Lining (72 Inch) 135 Lin Foot 189,000.00 1,400.00 603-01125 12 Inch Reinforced Concrete Pipe (Complete In Place) 152 Lin Foot 9,316.00 61.29 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) 476 Lin Foot 13,661.20 28.70 603-01180 18 Inch Reinforced Concrete Pipe 6,906 Lin Foot 325,172.12 47.09 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) 8,272 Lin Foot 366,924.05 44.36 603-01240 24 Inch Reinforced Concrete Pipe 4,297 Lin Foot 232,527.76 54.11 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) 12,216 Lin Foot 677,029.36 55.42 603-01300 30 Inch Reinforced Concrete Pipe 4,336 Lin Foot 311,908.82 71.93 603-01305 30 Inch Reinforced Concrete Pipe (Complete In Place) 2,893 Lin Foot 222,894.08 77.05 603-01360 36 Inch Reinforced Concrete Pipe 1,110 Lin Foot 99,092.90 89.27 603-01365 36 Inch Reinforced Concrete Pipe (Complete In Place) 3,942 Lin Foot 417,591.84 105.93 603-01420 42 Inch Reinforced Concrete Pipe 940 Lin Foot 99,581.65 105.94 603-01425 42 Inch Reinforced Concrete Pipe (Complete In Place) 1,225 Lin Foot 200,285.00 163.50 603-01480 48 Inch Reinforced Concrete Pipe 1,400 Lin Foot 174,956.84 124.97 603-01485 48 Inch Reinforced Concrete Pipe (Complete In Place) 1,455 Lin Foot 265,666.96 182.59 603-01540 54 Inch Reinforced Concrete Pipe 171 Lin Foot 17,173.53 100.43 603-01545 54 Inch Reinforced Concrete Pipe (Complete In Place) 257 Lin Foot 36,037.21 140.22 603-01600 60 Inch Reinforced Concrete Pipe 548 Lin Foot 96,420.00 175.95 603-01605 60 Inch Reinforced Concrete Pipe (Complete In Place) 137 Lin Foot 21,998.00 160.57 603-01720 72 Inch Reinforced Concrete Pipe 172 Lin Foot 64,500.00 375.00 603-02180 23x14 Inch Reinforced Concrete Pipe Elliptical 380 Lin Foot 34,854.40 91.72 603-02185 23x14 Inch Reinforced Concrete Pipe (Complete In Plac 128 Lin Foot 19,200.00 150.00 603-02240 30x19 Inch Reinforced Concrete Pipe Elliptical 38 Lin Foot 3,161.60 83.20 603-02245 30x19 Inch Reinforced Concrete Pipe Elliptical 275 Lin Foot 36,459.80 132.58 603-02305 38x24 Inch Reinforced Concrete Pipe Elliptical 263 Lin Foot 24,676.40 93.83 603-02365 45x29 Inch Reinforced Concrete Pipe Elliptical 1,308 Lin Foot 237,669.78 181.70 603-02425 53x34 Inch Reinforced Concrete Pipe Elliptical 29 Lin Foot 4,930.00 170.00 603-02480 60x38 Inch Reinforced Concrete Pipe Elliptical 295 Lin Foot 62,845.00 213.03 603-02485 60x38 Inch Reinforced Concrete Pipe Elliptical (CIP) 102 Lin Foot 19,125.00 187.50 Colorado Department of Transportation 11:56 Friday, November 7, 2008 15 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-02545 68x43 Inch Reinforcement Concrete Pipe Elliptical 152 Lin Foot 50,160.00 330.00 603-05015 15 Inch Reinforced Concrete End Section 1 Each 698.03 698.03 603-05018 18 Inch Reinforced Concrete End Section 37 Each 26,134.28 706.33 603-05024 24 Inch Reinforced Concrete End Section 104 Each 93,391.38 897.99 603-05030 30 Inch Reinforced Concrete End Section 22 Each 21,339.55 969.98 603-05036 36 Inch Reinforced Concrete End Section 45 Each 71,552.68 1,590.06 603-05042 42 Inch Reinforced Concrete End Section 4 Each 11,783.11 2,945.78 603-05048 48 Inch Reinforced Concrete End Section 10 Each 18,300.00 1,830.00 603-05054 54 Inch Reinforced Concrete End Section 4 Each 8,281.62 2,070.41 603-05060 60 Inch Reinforced Concrete End Section 2 Each 3,842.38 1,921.19 603-05118 23x14 Inch Reinforced Concrete End Section Elliptical 2 Each 1,141.00 570.50 603-05124 30x19 Inch Reinforced Concrete End Section Elliptical 4 Each 5,641.99 1,410.50 603-05130 38x24 Inch Reinforced Concrete End Section Elliptical 8 Each 15,817.08 1,977.14 603-05136 45x29 Inch Reinforced Concrete End Section Elliptical 5 Each 9,910.76 1,982.15 603-05148 60x38 Inch Reinforced Concrete End Section Elliptical 6 Each 11,960.34 1,993.39 603-05154 68x43 Inch Reinforced Concrete End Section Elliptical 1 Each 2,600.00 2,600.00 603-10120 12 Inch Corrugated Steel Pipe 183 Lin Foot 7,667.00 41.90 603-10151 15 Inch Corrugated Steel Pipe (Install Only) 52 Lin Foot 2,236.00 43.00 603-10180 18 Inch Corrugated Steel Pipe 3,189 Lin Foot 193,151.10 60.57 603-10240 24 Inch Corrugated Steel Pipe 4,945 Lin Foot 386,702.10 78.20 603-10300 30 Inch Corrugated Steel Pipe 441 Lin Foot 29,241.00 66.31 603-10360 36 Inch Corrugated Steel Pipe 846 Lin Foot 93,782.30 110.85 603-10480 48 Inch Corrugated Steel Pipe 203 Lin Foot 41,070.00 202.32 603-10600 60 Inch Corrugated Steel Pipe 32 Lin Foot 16,200.00 506.25 603-10720 72 Inch Corrugated Steel Pipe 22 Lin Foot 19,800.00 900.00 603-15024 24 Inch Equivalent Corrugated Steel Pipe Arch 543 Lin Foot 73,305.00 135.00 603-30018 18 Inch Steel End Section 98 Each 38,718.22 395.08 603-30024 24 Inch Steel End Section 160 Each 58,682.20 366.76 603-30030 30 Inch Steel End Section 6 Each 4,190.52 698.42 603-30036 36 Inch Steel End Section 37 Each 30,236.00 817.19 603-31324 24 Inch Equivalent Arch Steel End Section 20 Each 12,000.00 600.00 603-33030 30 Inch Pipe Safety End Treatment 58 Each 116,153.70 2,002.65 603-33036 36 Inch Pipe Safety End Treatment 10 Each 26,702.00 2,670.20 603-33048 48 Inch Pipe Safety End Treatment 10 Each 31,837.00 3,183.70 603-40072 72 Inch Corrugated Steel Pipe (Half Round)(Special) 130 Lin Foot 9,750.00 75.00 603-50002 2 Inch Plastic Pipe 200 Lin Foot 1,240.00 6.20 603-50004 4 Inch Plastic Pipe 96 Lin Foot 816.00 8.50 603-50006 6 Inch Plastic Pipe 623 Lin Foot 8,331.00 13.37 Colorado Department of Transportation 11:56 Friday, November 7, 2008 16 2008 Cost Data INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/08 THROUGH 10/31/08 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 603-50008 8 Inch Plastic Pipe