Part 1 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 1 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04010803 COLORADO SIGNAL COMPANY, INC. 7 $55,452.00 69.51 MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 6 U 04010806 UNITED RENTALS HIGHWAY TECHNOLOGIES 5 $290,796.88 82.65 MTCE 01-032 R-1 STENCIL MARKING 1 R 04010807 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $811,886.24 84.39 MTCE 01-035 R-1 STRIPING 1 R 04010810 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $261,030.00 104.63 MTCE 01-033 FAIRPLAY - MORRISON, EPOXY 1 M 04011501 WARNING LITES & EQUIPMENT, INC. 4 $369,397.50 71.99 MTCE 01-037 R-1 SIGNING 1 R 04012904 THE SIGN CREW, INCORPORATED 6 $99,949.00 89.30 MTCE 06-039 R-6, SIGN POST REPLACEMENT 6 U 04020508 COLORADO STRIJPE WRIGHT LTD 3 $1,083,167.50 107.30 MTCE 02-015 REGION 2 STRIPING 2 M 04021205 G.A. WESTERN CONSTRUCTION CO. 4 $99,346.50 68.16 MTCE 03-015 R3 EXPANSION JOINT REPAIR 3 M 04031107 KOLBE STRIPING INC. 3 $235,667.00 98.62 MTCE 04-050 R-4 EPOXY SH 34 EAST 4 M 04031108 FRONT RANGE BARRICADE 5 $104,369.00 103.25 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 4 M 04031801 DKS ENTERPRISES INC. 4 $54,500.40 109.00 MTCE 06-041 SH 6 AT W. 19TH STREET 6 U 04031805 TLM CONSTRUCTORS, INC. 4 $1,804,674.00 124.10 MTCE 04-049 CONCRETE SLABS ON I-25 4 U 04031806 WARNING LITES & EQUIPMENT, INC. CONTRACT REJ - NO REASON GIVEN MTCE 04-048 R-4, EPOXY PAVEMENT MARKING 4 M 04040106 TLM CONSTRUCTORS, INC. 4 $73,364.00 55.72 MTCE 01-039 I70, EAST OF DENVER 1 P 04042202 KOLBE STRIPING INC. 4 $1,173,937.00 78.50 MTCE 01-034 REGION 1 FY 05 STRIPING 1 R 04042204 SLOAN CONTRACTING, INC. 3 $248,649.25 103.99 MTCE 05-032 R5 - FENCING 5 M 04060305 C & D ELECTRIC 7 $260,150.00 54.29 MTCE 02-017 REGION 2 STREET LIGHTING 2 R Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 2 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04060306 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $1,236,174.00 94.23 MTCE 02-018 REGION 2 STRIPING 2 R 04061707 STURGEON ELECTRIC COMPANY, INC 6 $162,472.75 96.41 MTCE 06-044 R-6 SIGNAL INTERSECTIONS 6 U 04062401 STURGEON ELECTRIC COMPANY, INC 6 $313,992.00 65.47 MTCE 01-036 R-1 CONTROLLER CABINETS 1 R 04072201 FRONT RANGE STRIPING 6 $278,940.66 80.93 MTCE 04-052 FY 05 REGION 4 STENCIL MARKING 4 U 04072904 JALISCO INTERNATIONAL, INC. 2 $448,460.00 100.25 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 6 U 04072905 AMERICAN CIVIL CONSTRUCTORS, INC. CONTRACT REJ - NO REASON GIVEN MTCE 06-043 R6 - BRIDGE RAIL REPLACEMENT 6 U 04072906 DKS ENTERPRISES INC. 3 $658,250.00 122.57 MTCE 01-041 REGION 1 HIGHWAY LIGHTING 1 R 04072907 INTERMOUNTAIN SLURRY SEAL, INC. CONTRACT REJ - NO REASON GIVEN MTCE 05-033 US 160, EAST OF PAGOSA SPRINGS 5 M 04072908 INTERMOUNTAIN SLURRY SEAL, INC. CONTRACT REJ - NO REASON GIVEN MTCE 05-034 US 550, SOUTH OF DURANGO 5 M 04072909 PREMIER PAVING, INC. 3 $321,226.20 82.77 MTCE 01-040 I-25, NEAR LARKSPUR 1 R 04072910 FRONT RANGE BARRICADE 6 $362,136.80 77.70 MTCE 03-018 R-3 SIGN REPLACEMENT 3 R 04080504 UNITED RENTALS HIGHWAY TECHNOLOGIES 4 $287,609.21 77.02 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEME 4 M 04080506 WARNING LITES & EQUIPMENT, INC. 4 $1,347,728.00 79.62 MTCE 04-055 R-4 EPOXY EAST 4 M 04080507 KOLBE STRIPING INC. 4 $735,610.00 72.91 MTCE 04-054 R-4 EPOXY WEST 4 M 04081202 UNITED RENTALS HIGHWAY TECHNOLOGIES 3 $967,100.00 78.88 MTCE 06-049 VARIOUS R-6 STRIPING 6 U 04081205 WARNING LITES & EQUIPMENT, INC. 3 $167,806.50 93.38 MTCE 04-053 R-4 SIGNS, SH 14 WEST 4 M 04081903 ASPHALT PAVING CO. 4 $1,055,255.14 42.80 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEMEN 6 U Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 3 2004 Cost Data - Maintenance PROJECTS BID FROM 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ BID CONTRACTOR/ LETTING PROJECT NUMBER LOCATION DIST TERRAIN BIDS AWARDED BID INDEX ------------------------------------------------------------------------------------------------------------------------------------ 04081905 WARNING LITES & EQUIPMENT, INC. 3 $384,111.00 115.34 MTCE 01-043 I-70, LIMON TO KANSAS STATELIN 1 P 04081906 IDEAL FENCING CORPORATION CONTRACT REJ - NO REASON GIVEN MTCE 03-019 R-3, GUARDRAIL REPAIRS 3 M 04081907 G.A. WESTERN CONSTRUCTION CO. CONTRACT REJ - NO REASON GIVEN MTCE 03-020 R3, EXPANSION JOINT REPAIRS ON 3 M 04081908 G.A. WESTERN CONSTRUCTION CO. 3 $599,034.10 127.34 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 3 M 04082603 AMERICAN CIVIL CONSTRUCTORS, INC. 2 $388,522.50 94.23 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 6 U 04090203 FOUR CORNERS MATERIALS 4 $315,816.70 99.67 MTCE 05-034R US 550, SOUTH OF DURANGO 5 M 04091606 IDEAL FENCING CORPORATION 2 $175,864.00 93.64 MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92, 3 M 04091607 G.A. WESTERN CONSTRUCTION CO. 1 $79,705.00 96.15 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 3 M 04100702 PREMIER PAVING, INC. 6 $1,060,713.10 95.41 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 6 U 04101403 K.E.C.I. COLORADO, INC. 4 $28,250.00 98.26 MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 6 U 04102802 INTERFACE COMMUNICATIONS, COMPANY 8 $261,614.49 63.21 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 1 R ======= ================ ====== TOTALS 161 $18,662,728.42 84.60 Part 2 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 1 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 202-00170 Grinding And Texturing Concrete Pavement 5,360 Sq Yard 48,240.00 9.00 202-00220 Removal of Asphalt Mat 120 Sq Yard 1,412.40 11.77 202-00240 Removal of Asphalt Mat (Planing) 135,767 Sq Yard 128,978.65 0.95 202-00250 Removal of Pavement Marking 3,596,261 Sq Foot 898,362.66 0.25 202-00425 Removal of Bridge Railing 55 Lin Foot 1,650.00 30.00 202-00503 Removal of Portions of Present Structure 316 Sq Yard 50,560.00 160.00 202-00504 Removal of Expansion Device 3,039 Lin Foot 168,101.70 55.31 202-00700 Removal of Light Standard 3 Each 1,548.00 516.00 202-00810 Removal of Ground Sign 3,242 Each 63,305.00 19.53 202-00821 Removal of Sign Panel 2,930 Each 41,779.00 14.26 202-00825 Removal of Flashing Beacon 3 Each 375.00 125.00 202-00855 Removal of Traffic Signal Controller Cabinet 23 Each 6,900.00 300.00 202-00895 Removal of Impact Attenuator 1 Each 2,750.00 2,750.00 202-01000 Removal of Fence 102,732 Lin Foot 51,365.75 0.50 202-01030 Removal of Road Closure Gate 3 Each 564.00 188.00 202-01130 Removal of Guardrail Type 3 1,096 Lin Foot 5,697.00 5.20 202-01140 Removal of Guardrail Type 4 206 Lin Foot 6,400.00 31.07 202-01300 Removal of End Anchorage 70 Each 11,550.00 165.00 202-04002 Clean Culvert 4 Each 600.00 150.00 202-05026 Sawing Asphalt Material (6 Inch) 600 Lin Foot 3,240.00 5.40 203-00010 Unclassified Excavation (Complete In Place) 180 Cubic Yard 2,898.00 16.10 203-00060 Embankment Material (Complete In Place) 1,741 Cubic Yard 13,587.00 7.80 203-01500 Blading 20 Hour 2,660.00 133.00 203-01597 Potholing 10 Hour 1,120.00 112.00 208-00045 Concrete Washout Structure 12 Each 3,985.00 332.08 208-00050 Storm Drain Inlet Protection 42 Each 7,376.00 175.62 208-00205 Erosion Control Supervisor 64 Hour 2,696.00 42.13 210-00750 Reset Light Standard 10 Each 5,500.00 550.00 210-00810 Reset Ground Sign 1 Each 500.00 500.00 210-00815 Reset Sign Panel 404 Each 6,660.00 16.49 210-01130 Reset Guardrail Type 3 1,500 Lin Foot 37,500.00 25.00 210-01140 Reset Guardrail Type 4 1,590 Lin Foot 17,490.00 11.00 212-00006 Seeding (Native) 2 Acre 1,000.00 500.00 212-00047 Soil Preparation (Special) 2 Acre 1,420.00 710.00 213-00003 Mulching (Weed Free) 2 Acre 1,310.00 655.00 213-00061 Mulch Tackifier 600 Pound 1,080.00 1.80 304-01005 Aggregate Base Course (Class 1) 104 Cubic Yard 6,032.00 58.00 304-06000 Aggregate Base Course (Class 6) 10 Ton 250.00 25.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 2 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 403-00720 Hot Bituminous Pavement (Patching) (Asphalt) 210 Ton 20,100.00 95.71 403-00721 Hot Bituminous Pavement (Patching) (Asphalt) 60 Sq Yard 3,720.00 62.00 403-09111 Stone Mastic Asphalt 269,563 Sq Yard 830,254.04 3.08 403-33741 Hot Bituminous Pavement (Grading S) (75) (PG 64-22) 20 Ton 2,740.00 137.00 403-34841 Hot Bituminous Pavement (Grading SX) (100) (PG 64-22) 7,663 Ton 278,933.20 36.40 403-34871 Hot Bituminous Pavement (Grading SX) (100) (PG 76-28) 15,987 Ton 539,236.50 33.73 409-02010 Cover Coat Material (Type II) 3,067 Ton 141,082.00 46.00 411-10253 Emulsified Asphalt (CSS-1H) 5,573 Gallon 5,573.00 1.00 411-10255 Emulsified Asphalt (Slow-Setting) 20,173 Gallon 26,850.40 1.33 411-10275 Emulsified Asphalt (HFMS-2P) (High Float) (Polymerize 121,579 Gallon 158,052.70 1.30 412-04000 Concrete Pavement Panel (Precast) 48,216 Sq Foot 1,060,752.00 22.00 503-00048 Drilled Caisson (48 Inch) 33 Lin Foot 9,306.00 282.00 509-90000 Paint Existing Structure(S) 1 Lump Sum 44,132.00 44,132.00 515-00120 Waterproofing (Membrane) 296 Sq Yard 3,996.00 13.50 518-01002 Bridge Expansion Device (0-2 Inch) 660 Lin Foot 57,420.00 87.00 518-01004 Bridge Expansion Device (0-4 Inch) 1,012 Lin Foot 150,453.30 148.67 518-01109 Bridge Expansion Device (Greater Than 4 In)(Install O 34 Lin Foot 14,280.00 420.00 518-02100 Polymer Mortar End Dam 639 Cubic Foot 257,094.80 402.34 518-03100 Rapid Cure Silicone Joint Seal 1,341 Lin Foot 32,011.50 23.87 601-03040 Concrete Class D (Bridge) 10 Cubic Yard 9,134.00 913.40 601-03041 Concrete Class D (Bridge) (Special) 9 Cubic Yard 6,486.00 720.67 601-04000 Concrete Class E 68 Cubic Yard 42,500.00 625.00 601-06100 Concrete (Patching) 74 Cubic Yard 111,000.00 1,500.00 601-06150 Concrete (Patching) 25 Sq Foot 2,150.00 86.00 601-10250 Slab Jacking 49,573 Pound 446,157.00 9.00 601-40300 Structural Concrete Coating 1,820 Sq Yard 17,017.00 9.35 601-40301 Structural Concrete Coating 100 Sq Foot 600.00 6.00 602-00020 Reinforcing Steel (Epoxy Coated) 24,916 Pound 42,628.60 1.71 606-00301 Guardrail Type 3 (6-3 Post Spacing) 1,525 Lin Foot 32,347.50 21.21 606-00705 Guardrail Type 7 (Special) 200 Lin Foot 36,000.00 180.00 606-01340 End Anchorage Type 3D 1 Each 2,625.00 2,625.00 606-01370 Transition Type 3G 31 Each 30,840.00 994.84 606-01380 Transition Type 3H 18 Each 11,500.00 638.89 606-01460 Median Terminal 14 Each 49,700.00 3,550.00 606-02001 End Anchorage (Slotted Rail Terminal) 16 Each 35,760.00 2,235.00 606-02005 End Anchorage (Flared) 16 Each 21,732.00 1,358.25 606-10405 Bridge Rail Type 4 (Special) 55 Lin Foot 9,900.00 180.00 606-10700 Bridge Rail Type 7 942 Lin Foot 89,490.00 95.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 3 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 607-00010 Corner and Line Brace Post 446 Each 94,552.00 212.00 607-01010 Fence Barbed Wire with Metal Posts (Special) 102,732 Lin Foot 102,731.50 1.00 607-53137 Fence Chain Link (Special) (36 Inch) 320 Lin Foot 12,800.00 40.00 607-60620 Road Closure Gate 4 Each 23,280.00 5,820.00 612-00001 Delineator (Type I) 20 Each 140.00 7.00 612-00002 Delineator (Type II) 8 Each 408.00 51.00 612-00003 Delineator (Type III) 10 Each 80.00 8.00 613-00126 1-1/4 Inch Electrical Conduit (Jacked) 300 Lin Foot 3,750.00 12.50 613-00150 1-1/2 Inch Electrical Conduit 60 Lin Foot 1,500.00 25.00 613-00200 2 Inch Electrical Conduit 5,669 Lin Foot 56,655.75 9.99 613-00201 2 Inch Electrical Conduit (Jacked) 3,200 Lin Foot 38,372.00 11.99 613-00300 3 Inch Electrical Conduit 550 Lin Foot 11,210.00 20.38 613-00301 3 Inch Electrical Conduit (Jacked) 1,520 Lin Foot 17,732.80 11.67 613-00700 Inspection Trip 24 Each 18,000.00 750.00 613-01125 1-1/4 Inch Electrical Conduit (Plastic) 300 Lin Foot 1,800.00 6.00 613-01200 2 Inch Electrical Conduit (Plastic) 23,718 Lin Foot 146,587.52 6.18 613-01300 3 Inch Electrical Conduit (Plastic) 11,792 Lin Foot 82,775.40 7.02 613-05000 Direct-Burial Cable 1,000 Lin Foot 8,400.00 8.40 613-07000 Pull Box (Special) 135 Each 72,495.00 537.00 613-10000 Wiring 4 Lump Sum 37,099.00 9,274.75 613-32400 Light Standard Steel (40 Foot) 10 Each 38,000.00 3,800.00 613-34400 Light Standard Metal (40 Foot) 60 Each 40,500.00 675.00 613-40000 Concrete Foundation Pad 4 Each 2,400.00 600.00 613-40010 Light Standard Foundation 10 Each 10,050.00 1,005.00 613-40020 Transformer Base Aluminum 20 Each 17,400.00 870.00 613-40030 Transformer Base Aluminum (Install Only) 60 Each 3,000.00 50.00 613-50010 Photoelectric Cell 600 Each 46,500.00 77.50 613-50200 Lighting System 20 Each 5,500.00 275.00 613-60000 Lamps 650 Each 60,350.00 92.85 613-60500 Underground Repair 80 Each 28,000.00 350.00 613-70255 Fuses 250 Each 8,650.00 34.60 613-70260 Fuse Holder 170 Each 9,100.00 53.53 613-70400 Luminaire High Pressure Sodium (400 Watt) 450 Each 186,000.00 413.33 613-72150 Luminaire High Pressure Sodium (Wall Type) (150 Watt) 25 Each 10,750.00 430.00 613-80010 Ballast Unit 175 Each 35,750.00 204.29 614-00011 Sign Panel (Class I) 8,403 Sq Foot 66,162.50 7.87 614-00012 Sign Panel (Class II) 9,897 Sq Foot 113,328.50 11.45 614-00013 Sign Panel (Class III) 19,043 Sq Foot 309,561.00 16.26 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 4 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 614-00025 Sign Panel (Class I) (Install Only) 12,842 Sq Foot 26,968.20 2.10 614-00027 Sign Panel (Class II) (Install Only) 8,046 Sq Foot 20,919.60 2.60 614-00028 Sign Panel (Class III) (Install Only) 1,843 Sq Foot 5,529.00 3.00 614-00200 Steel Sign Post (U-2) 12 Lin Foot 134.67 11.22 614-00357 Steel Sign Post (S 3x5.7) 15 Lin Foot 450.00 30.00 614-00612 Steel Sign Post (W 6x12) 32 Lin Foot 896.00 28.00 614-00615 Steel Sign Post (W 6x15) 59 Lin Foot 1,888.00 32.00 614-00818 Steel Sign Post (W 8x18) 67 Lin Foot 2,278.00 34.00 614-00821 Steel Sign Post (W 8x21) 40 Lin Foot 1,520.00 38.00 614-01022 Steel Sign Post (W 10x22) 76 Lin Foot 3,040.00 40.00 614-01026 Steel Sign Post (W 10x26) 34 Lin Foot 1,496.00 44.00 614-01502 Steel Sign Support (2-Inch Round)(Post & Socket) 8,133 Lin Foot 65,714.00 8.08 614-01512 Steel Sign Support (2-Inch Round)(Post) 7,103 Lin Foot 40,153.00 5.65 614-01522 Steel Sign Support (2-Inch Round)(Socket) 687 Each 20,538.00 29.90 614-01552 Steel Sign Post (2.5 Inch Round) (Slipbase) 6,890 Lin Foot 158,470.00 23.00 614-01582 Steel Sign Support (2-1/2 Inch Round)(Post and Slipba 5,761 Lin Foot 124,742.00 21.65 614-01585 Steel Sign Support (2-1/2 Inch Round)(Post) 11,818 Lin Foot 146,764.00 12.42 614-01588 Steel Sign Support (2-1/2 Inch Round)(Slipbase) 939 Each 75,120.00 80.00 614-03001 Concrete Footing (Type 1) 2 Each 1,250.00 625.00 614-03002 Concrete Footing (Type 2) 4 Each 3,800.00 950.00 614-03003 Concrete Footing (Type 3) 4 Each 4,000.00 1,000.00 614-03004 Concrete Footing (Type 4) 2 Each 2,000.00 1,000.00 614-03005 Concrete Footing (Type 5) 4 Each 4,400.00 1,100.00 614-03006 Concrete Footing (Type 6) 2 Each 2,600.00 1,300.00 614-10050 Modification of Overhead Sign Structure 3 Each 4,500.00 1,500.00 614-10120 Variable Message Sign 1 Each 123,547.00 123,547.00 614-32400 Monotube Overhead Sign Cantilever (24 Inch Diameter) 1 Each 26,929.00 26,929.00 614-72855 Traffic Signal Controller Cabinet 23 Each 276,000.00 12,000.00 614-72872 Loop Detector (Micro Type) 13 Each 5,460.00 420.00 614-72875 Loop Detector Wire 6,660 Lin Foot 17,316.00 2.60 614-72876 Traffic Signal Vehicle Detector Amplifier (Loop Type) 36 Each 5,760.00 160.00 614-72886 Intersection Detection System (Camera) 2 Each 10,340.00 5,170.00 614-72889 Traffic Signal Vehicle Detector (Micro Type) (Non-Inv 26 Each 17,174.00 660.54 614-85001 Impact Attenuator 4 Each 60,500.00 15,125.00 614-85040 Impact Attenuator (Truck Mounted Attenuator) 2 Each 4,500.00 2,250.00 614-87413 Fiber Optic Cable (Multi Mode) (12 Strands) 24,000 Lin Foot 46,800.00 1.95 620-00012 Field Laboratory (Class 2) 1 Each 3,300.00 3,300.00 620-00020 Sanitary Facility 2 Each 680.00 340.00 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 5 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 625-00000 Construction Surveying 2 Lump Sum 16,550.00 8,275.00 626-00000 Mobilization 22 Lump Sum 315,432.00 14,337.82 627-00001 Pavement Marking Paint 3 Gallon 1,605.00 535.00 627-00002 Thermoplastic Pavement Marking 100 Sq Foot 1,610.00 16.10 627-00003 Thermoplastic Pavement Marking (Inlaid) 4,500 Sq Foot 45,000.00 10.00 627-00004 Epoxy Pavement Marking 504,407 Sq Foot 350,964.55 0.70 627-00005 Epoxy Pavement Marking 187,342 Gallon 5,907,142.29 31.53 627-00012 Pavement Marking Paint (Low VOC Solvent Base) 610 Gallon 26,737.50 43.83 627-01000 Preformed Plastic Pavement Marking (Type A) 18,021 Sq Foot 154,498.60 8.57 627-01003 Preformed Plastic Pavement Marking (Type A) (Inlaid) 34,451 Sq Foot 288,108.00 8.36 627-03000 Preformed Plastic Pavement Marking (Type C) 10,000 Sq Foot 70,000.00 7.00 627-03003 Preformed Plastic Pavement Marking (Type C) (Inlaid) 47,967 Sq Foot 393,736.00 8.21 627-30210 Thermoplastic Pavement Marking (Xwalk-Stopline) 70,273 Sq Foot 175,682.50 2.50 627-30405 Preformed Thermoplastic Pavement Marking (Word-Symbol 26,305 Sq Foot 183,243.34 6.97 627-30410 Preformed Thermoplastic Pavement Marking (Xwalk-Stop 53,998 Sq Foot 295,235.70 5.47 630-00000 Flagging 4,960 Hour 110,268.20 22.23 630-00001 Pilot Car Operation 80 Hour 2,240.00 28.00 630-00003 Uniformed Traffic Control 648 Hour 18,456.00 28.48 630-00007 Traffic Control Inspection 87 Day 12,187.50 140.09 630-00009 Traffic Control Vehicle (Truck) 10 Each 43,916.00 4,391.60 630-00012 Traffic Control Management 973 Day 373,090.00 383.44 630-00025 Traffic Control Vehicle 100 Hour 1,200.00 12.00 630-10005 Traffic Control 7 Lump Sum 72,900.00 10,414.29 630-80001 Flashing Beacon (Portable) 4 Each 1,332.00 333.00 630-80305 Flagging Station Light 2 Each 7,700.00 3,850.00 630-80341 Construction Traffic Sign (Panel Size A) 61 Each 2,328.00 38.16 630-80342 Construction Traffic Sign (Panel Size B) 450 Each 32,717.00 72.70 630-80343 Construction Traffic Sign (Panel Size C) 104 Each 11,775.00 113.22 630-80344 Construction Traffic Sign (Special) 199 Sq Foot 5,145.60 25.86 630-80355 Portable Message Sign Panel 16 Each 93,280.00 5,830.00 630-80358 Advance Warning Flashing or Sequencing Arrow Panel (C 35 Each 36,470.00 1,042.00 630-80359 Portable Message Sign Panel 172 Day 25,515.00 148.34 630-80360 Drum Channelizing Device 605 Each 24,870.00 41.11 630-80364 Drum Channelizing Device (With Light) (Steady Burn) 150 Each 7,725.00 51.50 630-80370 Concrete Barrier (Temporary) 700 Lin Foot 11,200.00 16.00 630-80380 Traffic Cone 2,900 Each 22,557.50 7.78 630-80510 Mobile Pavement Marking Zone 4 Lump Sum 18,500.00 4,625.00 630-80520 Mobile Pavement Marking Zone 175 Day 56,620.00 323.54 Colorado Department of Transporation 16:10 Tuesday, January 25, 2005 6 2004 Cost Data - Maintenance INDEX AND AVERAGE UNIT BID PRICES FOR 01/01/04 THROUGH 12/31/04 ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER ITEM TOTAL QUANTITY UNIT TOTAL COST AVERAGE PRICE ------------------------------------------------------------------------------------------------------------------------------------ 630-85010 Impact Attenuator (Temporary) 2 Each 9,600.00 4,800.00 630-85040 Impact Attenuator (Truck Mounted Attenuator) (Tempora 10 Each 156,745.00 15,674.50 Part 3 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 1 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00170 Grinding And Texturing Conc Pvmt Sq Yard ================================================ MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 5,360.00 10.00 9.96 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 5,360.00 10.00 9.96 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,360.00 10.00 9.96 9.00 =============== 202-00220 Rem Asphalt Mat Sq Yard ================================================ MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 120.00 15.00 11.27 11.77 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 120.00 15.00 11.27 11.77 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 120.00 15.00 11.27 11.77 =============== 202-00240 Rem Asphalt Mat (Planing) Sq Yard ================================================ MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 135,767.00 1.00 0.97 0.95 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 135,767.00 1.00 0.97 0.95 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 135,767.00 1.00 0.97 0.95 =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 01-032 R-1 STENCIL MARKING 01/08/04 10,000.00 2.10 0.80 0.50 MTCE 01-035 R-1 STRIPING 01/08/04 10,000.00 1.20 0.40 0.35 MTCE 01-033 FAIRPLAY - MORRISON, EPOXY 01/08/04 231,000.00 0.58 0.61 0.38 MTCE 02-015 REGION 2 STRIPING 02/05/04 1,000.00 0.80 1.00 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 252,000.00 0.67 0.61 0.39 MTCE 01-034 REGION 1 FY 05 STRIPING 04/22/04 1,063,205.00 0.35 0.31 0.20 MTCE 02-018 REGION 2 STRIPING 06/03/04 10,000.00 0.80 0.63 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 1,073,205.00 0.35 0.31 0.21 MTCE 04-048 FY 05 R 4 QUALITY EPOXY PAVEM 08/05/04 273,407.00 0.60 0.48 0.38 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 2 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00250 Rem Pavement Marking Sq Foot ================================================ MTCE 04-055 R-4 EPOXY EAST 08/05/04 1,070,344.00 0.60 0.32 0.25 MTCE 04-054 R-4 EPOXY WEST 08/05/04 822,305.00 0.60 0.31 0.20 MTCE 06-049 VARIOUS R-6 STRIPING 08/12/04 100,000.00 0.50 0.31 0.35 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 5,000.00 1.00 1.75 1.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,271,056.00 0.60 0.34 0.25 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,596,261.00 0.53 0.35 0.25 =============== 202-00425 Rem Bridge Railing Lin Foot =============================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 55.00 25.00 35.00 30.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 55.00 25.00 35.00 30.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 55.00 25.00 35.00 30.00 =============== 202-00503 Rem Port Present Str Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 316.00 200.00 205.00 160.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 316.00 200.00 205.00 160.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 316.00 200.00 205.00 160.00 =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 77.30 150.00 235.50 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 77.30 150.00 235.50 133.00 MTCE 01-039 I70, EAST OF DENVER 04/01/04 660.00 80.00 27.34 10.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 660.00 80.00 27.34 10.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 970.00 100.00 72.50 50.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 3 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00504 Rem Exp Device Lin Foot =============================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1,298.00 70.00 61.53 64.60 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 34.00 475.00 555.00 555.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,302.00 88.62 68.02 65.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,039.30 88.31 61.71 55.31 =============== 202-00700 Rem Light Standard Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 2.00 400.00 526.67 450.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2.00 400.00 526.67 450.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 500.00 601.12 648.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 500.00 601.12 648.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 433.33 569.21 516.00 =============== 202-00810 Rem Ground Sign Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 521.00 40.00 37.35 25.00 MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 400.00 20.00 27.29 10.00 MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 206.00 10.00 22.40 12.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 1.00 45.00 45.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1,128.00 27.43 30.19 17.35 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 1,203.00 10.00 18.67 11.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 396.00 12.00 40.67 25.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 515.00 15.00 56.67 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,114.00 11.59 27.19 20.69 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,242.00 17.10 28.26 19.53 =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 226.00 80.00 48.45 35.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 4 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-00821 Rem Sign Panel Each =================================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 157.00 7.00 18.60 8.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 383.00 50.08 34.58 23.93 MTCE 03-018 R-3 SIGN REPLACEMENT 07/29/04 2,091.00 6.00 12.17 8.00 MTCE 04-053 R-4 SIGNS, SH 14 WEST 08/12/04 333.00 12.00 27.67 20.00 MTCE 01-043 I-70, LIMON TO KANSAS STATELI 08/19/04 123.00 10.00 90.00 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 2,547.00 6.98 15.34 12.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2,930.00 12.61 17.43 14.26 =============== 202-00825 Rem Flashing Beacon Each =================================================== MTCE 04-047 R-4 SIGNS SH 14 CENTRAL 03/11/04 3.00 300.00 325.00 125.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 3.00 300.00 325.00 125.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 300.00 325.00 125.00 =============== 202-00855 Rem Traf Sig Control Cab Each =================================================== MTCE 01-036 R-1 CONTROLLER CABINETS 06/24/04 23.00 300.00 677.55 300.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 23.00 300.00 677.55 300.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 23.00 300.00 677.55 300.00 =============== 202-00895 Rem of Impact Attenuator Each =================================================== MTCE 06-052 INTERSTATE 25 SB AT EXIT 213 10/14/04 1.00 750.00 1849.50 2750.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 750.00 1849.50 2750.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 750.00 1849.50 2750.00 =============== 202-01000 Rem Fence Lin Foot =============================================== MTCE 05-032 R5 - FENCING 04/22/04 102,731.50 0.35 0.45 0.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 102,731.50 0.35 0.45 0.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 102,731.50 0.35 0.45 0.50 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 5 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-01030 Rem of Road Closure Gate Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 3.00 500.00 419.08 188.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 3.00 500.00 419.08 188.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3.00 500.00 419.08 188.00 =============== 202-01130 Rem Gdrail Ty 3 Lin Foot =============================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 246.00 2.50 4.25 4.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 246.00 2.50 4.25 4.50 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 850.00 3.00 5.11 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 850.00 3.00 5.11 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,096.00 2.89 5.03 5.20 =============== 202-01140 Rem Gdrail Ty 4 Lin Foot =============================================== MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 6.00 10.00 200.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 6.00 10.00 200.00 150.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 200.00 15.00 30.55 27.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 15.00 30.55 27.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 206.00 14.85 33.05 31.07 =============== 202-01300 Rem End Anchorage Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 70.00 100.00 186.93 165.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 70.00 100.00 186.93 165.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 70.00 100.00 186.93 165.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 6 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 202-04002 Clean Culvert Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 4.00 600.00 693.33 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 4.00 600.00 693.33 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 4.00 600.00 693.33 150.00 =============== 202-05026 Sawing Asphalt Mat (6 In) Lin Foot =============================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 600.00 2.50 2.34 5.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 600.00 2.50 2.34 5.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 2.50 2.34 5.40 =============== 203-00010 Uncl Excav (CIP) Cubic Yard ============================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 180.00 15.00 34.61 16.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 180.00 15.00 34.61 16.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 180.00 15.00 34.61 16.10 =============== 203-00060 Emb Matl (CIP) Cubic Yard ============================================= MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,731.00 12.00 15.96 7.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 50.00 131.78 147.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,741.00 12.22 16.84 7.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,741.00 12.22 16.84 7.80 =============== 203-01500 Blading Hour =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 20.00 120.00 112.83 133.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 20.00 120.00 112.83 133.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 120.00 112.83 133.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 7 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 203-01597 Potholing Hour =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 10.00 150.00 150.79 112.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 150.00 150.79 112.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 150.00 150.79 112.00 =============== 208-00045 Conc Washout Str Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 1.00 800.00 1418.75 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 800.00 1418.75 150.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 2.00 600.00 775.00 1000.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 6.00 700.00 313.33 110.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 2.00 600.00 750.00 500.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 490.00 175.00 175.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 11.00 644.55 441.30 348.64 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 12.00 657.50 567.42 332.08 =============== 208-00050 Storm Drain Inlet Protection Each =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 1.00 500.00 1309.25 75.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 500.00 1309.25 75.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 4.00 200.00 325.00 400.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 20.00 200.00 186.25 90.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 12.00 250.00 218.33 75.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 200.00 305.00 210.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 1.00 220.00 111.00 111.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 41.00 215.12 220.01 140.35 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 250.00 210.51 295.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 250.00 210.51 295.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 52.00 227.31 244.13 175.62 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 8 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 208-00205 Erosion Control Supervisor Hour =================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 16.00 60.00 67.06 31.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 16.00 60.00 67.06 31.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 8.00 50.00 50.00 50.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 32.00 55.00 76.25 40.00 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 8.00 50.00 57.50 65.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 53.33 68.75 48.75 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 16.00 55.00 221.33 40.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 16.00 55.00 221.33 40.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 80.00 55.00 125.55 42.13 =============== 210-00750 Res Light Standard Each =================================================== MTCE 01-041 REGION 1 HIGHWAY LIGHTING 07/29/04 10.00 800.00 976.00 550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 800.00 976.00 550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 800.00 976.00 550.00 =============== 210-00810 Res Ground Sign Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 1.00 100.00 359.45 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 100.00 359.45 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 100.00 359.45 500.00 =============== 210-00815 Res Sign Panel Each =================================================== MTCE 01-037 R-1 SIGNING 01/15/04 3.00 300.00 224.05 150.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 9 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 210-00815 Res Sign Panel Each =================================================== MTCE 06-039 R-6, SIGN POST REPLACEMENT 01/29/04 400.00 25.00 28.38 15.00 MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 1.00 100.00 127.25 210.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 404.00 27.23 29.51 16.49 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 404.00 27.23 29.51 16.49 =============== 210-01130 Res Gdrail Ty 3 Lin Foot =============================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 1,500.00 18.00 15.45 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,500.00 18.00 15.45 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,500.00 18.00 15.45 25.00 =============== 210-01140 Res Gdrail Ty 4 Lin Foot =============================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,590.00 5.00 11.76 11.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,590.00 5.00 11.76 11.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,590.00 5.00 11.76 11.00 =============== 212-00006 Seeding (Native) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 700.00 494.05 500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 494.05 500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 494.05 500.00 =============== 212-00047 Soil Preparation (Spec) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 700.00 766.46 710.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 700.00 766.46 710.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 700.00 766.46 710.00 =============== 213-00003 Mulching (Weed Free) Acre =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 2.00 600.00 621.68 655.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 2.00 600.00 621.68 655.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 2.00 600.00 621.68 655.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 10 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 213-00061 Mulch Tackifier Pound ================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 600.00 2.50 1.81 1.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 600.00 2.50 1.81 1.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 600.00 2.50 1.81 1.80 =============== 304-01005 ABC (CL 1) Cubic Yard ============================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 104.00 35.00 47.70 58.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 104.00 35.00 47.70 58.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 104.00 35.00 47.70 58.00 =============== 304-06000 ABC (CL 6) Ton ==================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 10.00 50.00 41.43 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 10.00 50.00 41.43 25.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 50.00 41.43 25.00 =============== 403-00720 HBP (Patching) (Asph) Ton ==================================================== MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 200.00 80.00 116.25 90.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 10.00 100.00 341.67 385.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 210.00 80.95 131.98 116.82 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 100.00 100.00 87.24 72.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 100.00 100.00 87.24 72.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 310.00 87.10 105.92 95.71 =============== 403-00721 HBP (Patching) (Asph) Sq Yard ================================================ MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 60.00 70.00 68.32 62.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 60.00 70.00 68.32 62.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 60.00 70.00 68.32 62.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 11 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 403-09111 SMA Sq Yard ================================================ MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 269,563.00 4.00 3.31 3.08 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269,563.00 4.00 3.31 3.08 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269,563.00 4.00 3.31 3.08 =============== 403-33741 HBP (Gr S) (75) (PG 64-22) Ton ==================================================== MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 20.00 85.00 148.35 137.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 20.00 85.00 148.35 137.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 20.00 85.00 148.35 137.00 =============== 403-34841 HBP (Gr SX) (100) (PG 64-22) Ton ==================================================== MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 7,663.00 45.00 39.47 36.40 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 7,663.00 45.00 39.47 36.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 7,663.00 45.00 39.47 36.40 =============== 403-34871 HBP (Gr SX) (100) (PG 76-28) Ton ==================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 48.00 100.00 125.00 110.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 48.00 100.00 125.00 110.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 15,939.00 40.00 38.05 33.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 15,939.00 40.00 38.05 33.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 15,987.00 40.18 38.14 33.73 =============== 409-02010 CC Matl (Ty II) Ton ==================================================== MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 3,067.00 35.00 42.88 46.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 3,067.00 35.00 42.88 46.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 3,067.00 35.00 42.88 46.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 12 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 409-05000 Ultrath Bond Wearing Course Sq Yard ================================================ MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME . 269,563.00 4.00 3.40 . -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 269,563.00 4.00 3.40 . ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 269,563.00 4.00 3.40 . =============== 411-10253 Emul Asph (CSS-1H) Gallon ================================================= MTCE 01-040 I-25, NEAR LARKSPUR 07/29/04 5,573.00 1.40 1.05 1.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 5,573.00 1.40 1.05 1.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 5,573.00 1.40 1.05 1.00 =============== 411-10255 Emul Asph (SS) Gallon ================================================= MTCE 06-041 SH 6 AT W. 19TH STREET 03/18/04 8.00 8.00 2.63 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 8.00 8.00 2.63 2.00 MTCE 06-046 I-70 & C-470 ALTERNATE PAVEME 08/19/04 26,756.00 1.00 1.43 1.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 26,756.00 1.00 1.43 1.60 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 6,787.00 1.00 0.96 0.80 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 6,787.00 1.00 0.96 0.80 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33,551.00 1.00 1.22 1.33 =============== 411-10275 Emul Asph (HFMS-2P) Gallon ================================================= MTCE 05-034R US 550, SOUTH OF DURANGO 09/02/04 121,579.00 1.50 1.85 1.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 121,579.00 1.50 1.85 1.30 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 121,579.00 1.50 1.85 1.30 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 13 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 412-04000 Conc Pvt Pan (Precast) Sq Foot ================================================ MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 48,216.00 19.00 24.42 22.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 48,216.00 19.00 24.42 22.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 48,216.00 19.00 24.42 22.00 =============== 503-00048 Drilled Caisson (48 In) Lin Foot =============================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 33.00 500.00 335.84 282.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 33.00 500.00 335.84 282.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 33.00 500.00 335.84 282.00 =============== 509-90000 Paint Existing Str(S) LUMP SUM =============================================== MTCE 06-040 VARIOUS LOCATIONS IN REGION 6 01/08/04 1.00 66000.00 58387.79 44132.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 1.00 66000.00 58387.79 44132.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 66000.00 58387.79 44132.00 =============== 515-00120 Waterproofing (Membrane) Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 296.00 10.00 12.75 13.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 296.00 10.00 12.75 13.50 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 296.00 10.00 12.75 13.50 =============== 518-01002 Br Expan Device (0-2 In) Lin Foot =============================================== MTCE 01-039 I70, EAST OF DENVER 04/01/04 660.00 100.00 99.25 87.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE SECOND QUARTER 660.00 100.00 99.25 87.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 660.00 100.00 99.25 87.00 =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 41.80 130.00 341.06 118.50 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 41.80 130.00 341.06 118.50 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 14 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 518-01004 Br Expan Device (0-4 In) Lin Foot =============================================== MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 970.00 125.00 135.00 150.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 970.00 125.00 135.00 150.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,011.80 125.21 151.35 148.70 =============== 518-01109 Inst Br Expan Device (Greater Than 4 In) Lin Foot =============================================== MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 34.00 660.00 420.00 420.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 34.00 660.00 420.00 420.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 34.00 660.00 420.00 420.00 =============== 518-02100 Polymer Mortar End Dam Cubic Foot ============================================= MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 59.40 500.00 484.96 442.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 59.40 500.00 484.96 442.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 580.00 315.00 382.67 398.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 580.00 315.00 382.67 398.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 639.40 332.19 394.96 402.09 =============== 518-03100 Rapid Cure Silicone Jt Seal Lin Foot =============================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 36.30 50.00 148.88 55.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 36.30 50.00 148.88 55.00 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1,305.00 55.00 62.67 23.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,305.00 55.00 62.67 23.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,341.30 54.86 65.75 23.87 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 15 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-03040 Conc CL D (Bridge) Cubic Yard ============================================= MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 1.00 600.00 1861.33 1484.00 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 9.00 925.00 850.00 850.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 10.00 892.50 1102.83 913.40 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 10.00 892.50 1102.83 913.40 =============== 601-03041 Conc CL D (Bridge) (Spec) Cubic Yard ============================================= MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 9.20 600.00 2357.00 705.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 9.20 600.00 2357.00 705.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 9.20 600.00 2357.00 705.00 =============== 601-04000 Conc CL E Cubic Yard ============================================= MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 68.00 850.00 1137.50 625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 68.00 850.00 1137.50 625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 68.00 850.00 1137.50 625.00 =============== 601-06100 Conc (Patching) Cubic Yard ============================================= MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 74.00 1200.00 1625.00 1500.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 74.00 1200.00 1625.00 1500.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 74.00 1200.00 1625.00 1500.00 =============== 601-06150 Conc (Patching) Sq Foot ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 25.00 35.00 63.00 86.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 25.00 35.00 63.00 86.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 25.00 35.00 63.00 86.00 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 16 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 601-10250 Slab Jacking Pound ================================================== MTCE 04-049 CONCRETE SLABS ON I-25 03/18/04 49,573.00 6.00 8.86 9.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 49,573.00 6.00 8.86 9.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 49,573.00 6.00 8.86 9.00 =============== 601-40300 Struct Conc Coating Sq Yard ================================================ MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 1,820.00 4.00 9.68 9.35 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 1,820.00 4.00 9.68 9.35 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,820.00 4.00 9.68 9.35 =============== 601-40301 Struct Conc Coating Sq Foot ================================================ MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 100.00 1.50 5.50 6.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 100.00 1.50 5.50 6.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 100.00 1.50 5.50 6.00 =============== 602-00020 Reinf Steel (Epoxy) Pound ================================================== MTCE 03-015 R3 EXPANSION JOINT REPAIR 02/12/04 147.40 1.50 3.86 2.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FIRST QUARTER 147.40 1.50 3.86 2.00 MTCE 06-042 R6 - EXPANSION JOINT REPAIR 07/29/04 7,000.00 1.00 2.63 2.50 MTCE 03-017 R-3, EXPANSION JOINT REPAIRS 08/19/04 21.00 3.00 5.43 4.30 MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 16,238.00 1.00 1.05 1.25 MTCE 03-020R R3 EXPANSION JOINT REPAIRS ON 09/16/04 510.00 4.00 4.60 4.60 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 23,769.00 1.07 1.56 1.69 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 1,000.00 2.00 2.03 2.10 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1,000.00 2.00 2.03 2.10 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 24,916.40 1.11 1.64 1.71 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 17 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-00301 Gdrail Ty 3 (6-3) Lin Foot =============================================== MTCE 03-019R HWYS 70, 82, 50, 133, 141, 92 09/16/04 600.00 33.00 30.86 25.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 600.00 33.00 30.86 25.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 850.00 12.00 20.29 18.00 MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 75.00 30.00 25.19 27.30 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 925.00 13.46 20.81 18.75 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1,525.00 21.15 22.55 21.21 =============== 606-00705 Gdrail Ty 7 (Spec) Lin Foot =============================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 200.00 90.00 144.78 180.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 200.00 90.00 144.78 180.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 200.00 90.00 144.78 180.00 =============== 606-01340 End Anchor Ty 3D Each =================================================== MTCE 01-038 I-70 & SH 91 VMS/ SNOW GATES 10/28/04 1.00 600.00 1133.08 2625.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 1.00 600.00 1133.08 2625.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 1.00 600.00 1133.08 2625.00 =============== 606-01370 Transition Ty 3G Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 800.00 1165.00 1230.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 800.00 1165.00 1230.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 27.00 750.00 1021.19 960.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 27.00 750.00 1021.19 960.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 31.00 756.45 1027.96 994.84 COLORADO DEPARTMENT OF TRANSPORTATION 09:29 Thursday, January 27, 2005 18 ITEM UNIT COSTS BY PROJECTS -- 2004 MAINT. COST DATA ------------------------------------------------------------------------------------------------------------------------------------ ITEM NUMBER/ ITEM DESCRIPTION/ UNIT/ PROJECT NUMBER PROJECT LOCATION DATE LET QUANTITY ENGR. EST. AVERAGE BID AWARDED BID ------------------------------------------------------------------------------------------------------------------------------------ =============== 606-01380 Transition Ty 3H Each =================================================== MTCE 06-043R R-6, BRIDGE RAIL REPLACEMENT 08/26/04 4.00 500.00 737.50 775.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE THIRD QUARTER 4.00 500.00 737.50 775.00 MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 14.00 450.00 628.64 600.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 450.00 628.64 600.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 18.00 461.11 638.11 638.89 =============== 606-01460 Median Terminal Each =================================================== MTCE 06-045 I-76, WADSWORTH TO FEDERAL 10/07/04 14.00 3400.00 3818.11 3550.00 -------------- --------------- --------------- --------------- WEIGHTED AVERAGE FOR THE FOURTH QUARTER 14.00 3400.00 3818.11 3550.00 ============== =============== =============== =============== WEIGHTED AVERAGE FOR THE YEAR 14.00 3400.00 3818.11 3550.00 ======