July 14, 2008
4th Street Bridge
ADVISORY
PUEBLO – Traffic will be reduced to one lane in each direction on the eastern half of the 4th Street Bridge, beginning next week, for new roadway construction.
The closure starts Sunday night, July 20, and continues until Saturday, August 16, before the start of the State Fair. While traffic is in a single lane configuration, the speed limit will be reduced to 25 mph and vehicles wider than 10 feet will not be allowed to travel through the area.
In addition to the lane closures, the loop ramp between eastbound 4th Street and the Midtown Shopping Center will be closed to all traffic until August 16.
###