|
US 24 West Environmental Assessment - Presentation August 24, 2006
PowerPoint Presentation ( 5 MB ..pdf file)
Exhibits presented in .pdf format. Download
the free Adobe .pdf reader.
Note: Due to file size and detail of the following .pdfs,
download time may be long depending on the speed of your internet connection.
It takes 14 seconds to download 100 KB and 2.3 minutes to download 1 MB
on a 56.6 Kbps internet connection. Very large files sizes are indicated.
Questions and Answers
Access
Aesthetics
Alternative
Modes and Routes
Construction and Phasing
Coordination and Partnerships
Design Options
Environmental
Funding
Miscellaneous Questions
Right of Way
Traffic
Design Options
Manitou Avenue
Manitou
2-Loop Partial Clover
Manitou
Safety Improvements
Manitou
Partial Clover / Hook Ramp
Manitou
Half Access
Manitou
Three Quarter Access
Ridge Road
Ridge
Road Overpass
Ridge
Road Signalized Intersection
Ridge
Road Diamond Interchange
Ridge
Road Tight Diamond Interchange
31st, 30th and 26th Streets
30th
& 26th Streets Signalized Intersection
31th
& 26th Streets Signalized Intersection
31th
& 26th Tight Diamond Interchange
21st Street
21st
Street Signalized Intersection (3,550 KB)
21st
Street Diamond with Loop (3,526 KB)
21st
Street Split Diamond with 18th Design Option 12 (3,545 KB)
21st
Street Split Diamond with 18th Design Option 22 (3,431 KB)
21st
Street Tight Diamond / SPUI (2,289 KB)
21st
Street Tight Diamond / SPUI North (3,287 KB)
21st
Street Tight Diamond / SPUI South (3,288 KB)
21st Street
SPUI (3,101 KB)
21st Street
TUDI (2,466 KB)
14th to I-25
I-25
Direct / 8th Street Overpass / 13th Street Diamond
I-25
Direct / One-Way Pair 8th & 10th Streets / 14th Street Access
I-25
Direct / 8th Street Signalized Intersection / 14th Street Access
I-25
Direct / 8th Street SPUI / 14th Street Access
I-25
Direct / 8th Street SPUI / 15th Street Access
|