| ||||||||||||||||||||||
|
Study Progress A great deal of information will be made available through the duration of the study. This page will contain study-specific documents and reports as they become available, such as the study’s purpose and need statement, a description of the screening process, a list of the alternatives considered, resource information, technical reports, and finally, the EA document. Check back often for updated information. Purpose and Need The purpose and need statement is the basis for the EA study, and is available by clicking here. Resource Information All resources required by NEPA will be evaluated as part of the EA. Environmental Resource Map (1 of 2) PDF, 3MB Environmental Resource Map (2 of 2) PDF, 3MB Scoping Period Comment Summary Scoping comments submitted by agencies, organizations, and individuals are summarized and categorized by topic in the Scoping Period Comment Summary document. Screening Process The screening process will be posted here once completed. Alternatives Considered The alternatives considered will be posted here once completed. Technical Reports Safety Assessment Report PDF, 1MB is to provide information, as related to safety, on Interstate 70 from milepost 178.00 to MP 192.00 on the west side of Vail Pass. EA Document The EA document will be posted here once completed.
|
|
||||||||||||||||||||
|
||||||||||||||||||||||